Official Journal of the City of New York - January 28, 2021

Text version What is this?Dateas is an independent website not affiliated with any government agency. The source of the PDF documents that we publish is the official agency stated in each of them. The text versions are non official transcripts that we do to provide better tools for accessing and searching information, but may contain errors or may not be complete.

Source: Official Journal of the City of New York

THE CITY RECORD

834

877 853 5247 US Toll-free 888 788 0099 US Toll-free
THURSDAY, JANUARY 28, 2021

baConstruction approved pursuant to previous versions of flood maps If, within one year prior to a change in the flood maps affecting a property, the Department of Buildings issued an approval of construction documents or issued a building permit for construction on that property pursuant to the previous flood maps, the provisions of Article VI, Chapter 4
Special Regulations Applying in Flood Hazard Areas, shall be deemed modified so as to substitute the previous flood maps for the current flood maps, and such construction may continue pursuant to such prior flood maps until October 9, 2019 two years after the date of adoption of the new flood maps. After this date, the vesting provisions of Section 11-30 shall apply.

253 215 8782 US Toll Number 213 338 8477 US Toll Number Meeting ID: 618 237 7396
Press to skip the Participation ID
Password: 1
To provide verbal testimony via Zoom please follow the instructions available through the above webpage.
Written comments will also be accepted until 11:59 P.M., one week before the date of vote. Please use the CPC Comments form that is accessible through the above webpage.
Please inform the Department of City Planning if you need a reasonable accommodation, such as a sign language interpreter, in order to participate in the meeting. The submission of testimony, verbal or written, in a language other than English, will be accepted, and real time interpretation services will be provided based on available resources. Requests for a reasonable accommodation or foreign language assistance during the meeting should be emailed to AccessibilityInfo@planning.nyc.gov or made by calling 212 720-3508.
CITYWIDE
No. 1
ZONING FOR COASTAL FLOOD RESILIENCY
CITYWIDE
N 210095 ZRY
IN THE MATTER OF an application submitted by New York City Department of City Planning, pursuant to Section 201 of the New York City Charter, for an amendment of the Zoning Resolution of the City of New York, to modify the flood resiliency provisions of Article VI, Chapter 4 Special Regulations Applying in Flood Hazard Areas, and related Sections.
Matter underlined is new, to be added.
Matter struck out is to be deleted.
Matter within is defined in Section 12-10 or other, as applicable.
indicates where unchanged text appears in the Zoning Resolution.

c
Provisions applying in the event that Flood Resilience Zoning Text Amendment expires This provision shall become effective only upon the expiration of Article VI, Chapter 4, adopted on October 9, 2013. If an application for approval of construction documents has been approved on or before the expiration of Article VI, Chapter 4, a building permit authorizing such construction may be issued pursuant to Article VI, Chapter 4, and such construction may continue until a date six years after the expiration of Article VI, Chapter 4. After such date, the vesting provisions of Section 11-30 shall apply.

db
Provisions applying when Appendix A Special Regulations for Neighborhood Recovery of Article VI, Chapter 4 expires This provision shall become effective only upon the expiration of Appendix A of Article VI, Chapter 4, adopted on July 23, 2015. If a building permit authorizing construction pursuant to Appendix A has been approved on or before the expiration of such Appendix, construction may continue up to two years after the expiration. After such date, the provisions of Section 11-30 shall apply.

Chapter 2
Construction of Language and Definitions

12-10
DEFINITIONS

ARTICLE I
GENERAL PROVISIONS

Chapter 1
Title, Establishment of Controls, and Interpretation of Regulations
11-30
BUILDING PERMITS ISSUED BEFORE EFFECTIVE DATE OF
AMENDMENT
11-33
Building Permits for Minor or Major Development or Other Construction Issued Before Effective Date of Amendment
11-339
Post-Hurricane Sandy construction Building permits issued in the flood zone The provisions of this Section shall apply within the flood zone. The provisions of this Section are subject to all provisions of Title 28 of the Administrative Code of the City of New York and Appendix G of the Building Code of the City of New York New York City Building Code, or its successors, including those pertaining to expiration, reinstatement, revocation and suspension. Changes in flood maps shall be considered an amendment of the Zoning Resolution, pursuant to for the purposes of applying the provisions of Section 11-30 BUILDING
PERMITS ISSUED BEFORE EFFECTIVE DATE OF AMENDMENT.
aApplications for approval of construction documents approved, pursuant to Executive Order 230
If an application for approval of construction documents has been approved on or before October 9, 2013, pursuant to Executive Order No. 230 Emergency Order to Suspend Zoning Provisions to Facilitate Reconstruction in Accordance with Enhanced Flood Resistant Construction Standards, dated January 31, 2013, and its successors, including Executive Order No. 427 in effect on October 9, 2013, relating to Hurricane Sandy as defined in Section 64-11 of this Resolution, a building permit authorizing such construction may be issued pursuant to the regulations of this Resolution in effect at the time of such approval of construction documents, and such construction may continue until October 9, 2019. After such date, the vesting provisions of Section 1130 shall apply.


Base flood elevation Note: Existing text to be deleted and replaced by the definition of flood-resistant construction elevation in Section 64-11
The base flood elevation is the level in feet of the flood having a one percent chance of being equaled or exceeded in any given year, as indicated on the Flood Insurance Rate Map prepared by the Federal Emergency Management Agency.
Base plane The base plane is a plane from which the height of a building or other structure is measured as specified in certain Sections. For buildings, portions of buildings with street walls at least 15 feet in width, or building segments within 100 feet of a street line, the level of the base plane is any level between curb level and street wall line level. Beyond 100 feet of a street line, the level of the base plane is the average elevation of the final grade adjoining the building or building segment, determined in the manner prescribed by the New York City Building Code for adjoining grade elevation. In either case, in the flood zone, either the base flood elevation may be the level of the base plane or building height may be measured from the flood-resistant construction elevation, as provided in Article VI, Chapter 4. For the purposes of this definition, abutting buildings on a single zoning lot may be considered a single building. In addition, the following regulations shall apply:
a
Within 100 feet of a street line:
1

The level of the base plane for a building or building segment without a street wall shall be determined by the average elevation of the final grade adjoining such building or building segment.

2

Where a base plane other than curb level is established, the average elevation of the final grade adjoining the street wall of the building or building segment, excluding the entrance to a garage within the street wall, shall not be lower than the level of the base plane, unless the base plane is also the base flood elevation.

3

Where the average elevation of the final grade adjoining the street wall of the building, excluding the entrance to a garage within the street wall, is

About this edition

Official Journal of the City of New York - January 28, 2021

TitleOfficial Journal of the City of New York

CountryUnited States

Date28/01/2021

Page count100

Edition count4000

First edition05/03/2008

Last issue14/05/2024

Download this edition

Other editions

<<<Enero 2021>>>
DLMMJVS
12
3456789
10111213141516
17181920212223
24252627282930
31