Version en texte Qu'est-ce que c'est?Dateas est un site Web indépendant, non affilié à un organisme gouvernemental. La source des documents PDF que nous publions est l'agence officielle indiquée dans chacun d'eux. Les versions en texte sont des transcriptions non officielles que nous faisons pour fournir de meilleurs outils d'accès et de recherche d'informations, mais peuvent contenir des erreurs ou peuvent ne pas être complètes.

Source: Federal Register

34974

Federal Register / Vol. 86, No. 124 / Thursday, July 1, 2021 / Rules and Regulations
khammond on DSKJM1Z7X2PROD with RULES

after publication. The total cost of the above Cost Estimate in subsequent years is $977,000 annually.
The following is a summary of the estimated costs calculated for a 10 year time horizon in perpetuity at a 3- and 7-percent discount rate:

the Existing HS Lease Baseline row 1,471 combined and New annual Lease Baseline row 542 combined found in table in section VI.e.

1. Regulatory Familiarization a. GSA estimates that it will take approximately 516 leasing acquisition Summary Total costs members 1.5 hours to become familiar with the GSAR 552.27033
Present Value 3 percent
$9,500,000 representation. Therefore, GSA
Annualized Costs 3 percent
1,100,000 calculated the total estimated cost for Present Value 7 percent
7,950,000
this part of the rule to be $65,000 45 =
Annualized Costs 7 percent
1,330,000
1.5 hours $84.16 516.
After the initial familiarization, GSA
GSA notes that this interim rule does estimates it will take 15 minutes 0.25
not authorize GSA lease contracting hours to stay familiar with the officers to use the information disclosed representation in subsequent years.
by offerors as a differentiating factor for Therefore, GSA calculated the total selection of a lease award, nor does it estimated cost for this part of the rule authorize GSA to terminate a lease, to be $11,000 = 0.25 hours $84.16
prevent a novation, or otherwise decline 516.
to make an award based on the b. GSA estimates that it will take disclosure. As such, GSA estimates that approximately 516 leasing acquisition this rule will not result in these members 30 minutes 0.5 hours to activities, and therefore no moving costs become familiar with the GSAR
have been included in this regulatory 552.27034 representation. Therefore, impact analysis.
GSA calculated the total estimated cost GSA acknowledges that there is for this part of the rule to be $22,000 =
uncertainty underlying these estimates, 0.50 hours $84.16 516.
including elements for which an After the initial familiarization, GSA
estimate is unavailable given inadequate estimates it will take 6 minutes 0.10
information. As more information hours to stay familiar with the becomes available, including through representation in subsequent years.
comment in response to this notice, Therefore, GSA calculated the total GSA will seek to update these estimates estimated cost for this part of the rule which could increase the estimated to be $4,300 = 0.10 hours $84.16
costs.
516.
f Government Cost Analysis 2. Workforce Training During the first and subsequent years The Government must educate its after publication of the rule, leasing leasing acquisition members to ensure acquisition members which includes a that they are familiar with the combination of Leasing Contracting representation and clause and how to Officers, Lease Administration review and act on the submitted Managers, Realty Specialists, and information, access requests, and General Counsel will need to learn written procedures.
about the clauses and its requirements.
a. GSA estimates that it will take GSA estimates this cost by multiplying approximately 516 leasing acquisition the time required to review the members 1 hour to complete training regulations and guidance implementing related GSAR 552.27033
the rule by the estimated compensation, representation. Therefore, GSA
on average, of a GS12 leasing calculated the total estimated cost for acquisition member. GSA assumes that this part of the rule to be $43,000 = 1
leasing acquisition members will, on hours $84.16 516.
average, stay consistent in subsequent After the initial training, GSA
years. Numbers and assumptions apply estimates it will take 6 minutes 0.10
to delegated agencies as well.
hours to maintain training related to GSA anticipates several areas of the representation. Therefore, GSA
impact as a result of this rule. These calculated the total estimated cost for impacts mirror the public impacts and this part of the rule to be $4,300 = 0.10
will appear as regulatory hours $84.16 516.
familiarization, workforce training, and b. GSA estimates that it will take time to review compliance with clauses. approximately 516 leasing acquisition These costs are justified in light of the members 30 minutes 0.50 hours to compelling national security objective complete training related to the GSAR
that this rule will advance.
For consistency, the number of leases 45 All totals in the Government Cost Analysis to be reviewed match the numbers in section are rounded.

VerDate Sep<11>2014

15:54 Jun 30, 2021

Jkt 253001

PO 00000

Frm 00070

Fmt 4700

Sfmt 4700

552.27034 clause. Therefore, GSA
calculated the total estimated cost for this part of the rule to be $22,000 = 0.50
hours $84.16 516.
After the initial training, GSA
estimates it will take 3 minutes 0.05
hours to maintain training related to the clause. Therefore, GSA calculated the total estimated cost for this part of the rule to be $2,200 = 0.05 hours
$84.16 516.
3. Review of Compliance With Clauses The primary cost to GSA will be to review the representations required by GSAR 552.27033 and the compliance with GSAR 552.27034.
a. GSAR 552.27033, Foreign Ownership and Financing Representation for High-Security Leased Space i. GSA estimates that it will take leasing acquisition members approximately 6 minutes 0.10 hours to review the representation at sections c1, d1, and e1 essentially no required disclosures required of the representation clause at GSAR 552.270
33 for existing high-security lessors.
Therefore, GSA calculated the total estimated cost for this part of the rule to be $12,000 = 0.10 hours $84.16
1,471.
ii. GSA estimates that for new highsecurity lessors each year, it will take leasing acquisition members approximately 6 minutes 0.10 hours to review the representation at sections c1, d1, and e1 essentially no required disclosures required.
Therefore, GSA calculated the total estimated cost for this part of the rule to be $4,600 = 0.10 hours $84.16
542.
iii. GSA estimates that for existing high-security lessors, 10 percent or 147
lessors will respond affirmatively to one or more sections at c1, d1, and e1 of the representation clause that the offeror does have an immediate owner, and/or is owned or controlled by another entity or highest owner, and/or does involve a foreign entity and will be required to complete additional sections at c2
and c3, potentially c4, d2 and d3, potentially d4, and e2. GSA
estimates that it will take leasing acquisition members 5 hours to complete the reviews on those various sections of the representation clause, notify the Federal tenant of the building or other improvement of any security concerns and necessary mitigation measures if any prior to award or approval of a novation agreement.
Therefore, GSA calculated the total
E:FRFM01JYR1.SGM

01JYR1

Acerca de esta edición

Federal Register - July 1, 2021

TitreFederal Register

PaysÉtats-Unis

Date01/07/2021

Page count322

Edition count7798

Première édition14/03/1936

Dernière édition18/06/2026

Télécharger cette édition

Otras ediciones

<<<Julio 2021>>>
DLMMJVS
123
45678910
11121314151617
18192021222324
25262728293031