Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.
Source: Federal Register
khammond on DSKJM1Z7X2PROD with NOTICES
Federal Register / Vol. 86, No. 165 / Monday, August 30, 2021 / Notices Border Reservoir, with a surface area of 138-acres, and a total storage capacity of 21,600 acre-feet at a normal maximum elevation of 3,920 feet msl;
and 3 a new 8,448-foot-long, 31-footdiameter pressurized tunnel penstock connecting the Quarry and Border Reservoirs, with a hydraulic head of 1,180 feet. The proposed alternative B
would consist of: 1 A new 2,997-footlong, 300-foot-high earthen dam impounding a new upper reservoir Edison Reservoir with a surface area of 62 acres, and a total storage capacity of 18,000 acre-feet at a normal maximum elevation of 4,500 feet msl; 2 a new lower reservoir Teson Reservoir with a surface area of 63 acres, and a total storage capacity of 21,800 acre-feet at a normal maximum elevation of 3,530 feet msl; and 3 a new 7,920-foot-long, 33foot-diameter pressurized tunnel penstock connecting the Edison and Teson Reservoirs, with a hydraulic head of 1,000 feet. The proposed alternative C would consist of: 1 A new 3,840foot-long, 300-foot-high earthen dam impounding a new upper reservoir Crane Reservoir with a surface area of 156 acres, and a total storage capacity of 23,950 acre-feet at a normal maximum elevation of 4,500 feet msl; 2 a new 5,485-foot-long, 195-foot-high earthen dam impounding a new lower reservoir Oso Reservoir with a surface area of 314-acres, and a total storage capacity of 21,690 acre-feet at a normal maximum elevation of 3,530 feet msl; and 3 a new 19,536-foot-long, 34-foot-diameter pressurized tunnel penstock connecting the Crane and Oso Reservoirs, with a hydraulic head of 970 feet. Each of the alternative configurations would also include a new powerhouse and switchyard located adjacent to the lower reservoir, and a transmission line connecting the switchyard to either Los Angeles Department of Water and Powers LADWP Rosamond Switching Station or Southern California Edison Companys SCE Bailey Substation. The powerhouse would contain five turbinegenerator units with a total rated capacity of 1,000 megawatts and the estimated annual generation at the project would be 3,500 gigawatt-hours.
Applicant Contact: Mr. Victor M.
Rojas, Managing Director, Premium Energy Holdings LLC. 355 South Lemon Ave., Suite A, Walnut, CA 91789, victor.rojas@pehllc.net.
FERC Contact: Ousmane Sidibe;
Ousmane.sidibe@ferc.gov, 202 502
6245.
Deadline for filing comments, motions to intervene, competing applications without notices of intent, or notices of intent to file competing applications: 60
days from the issuance of this notice.
VerDate Sep<11>2014
18:40 Aug 27, 2021
Jkt 253001
Competing applications and notices of intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commissions eFiling system at https
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https ferconline.ferc.gov/
QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@
ferc.gov, 866 2083676 toll free, or 202 5028659 TTY. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P
15104000.
More information about this project, including a copy of the application, can be viewed or printed on the eLibrary link of Commissions website at https
www.ferc.gov/ferc-online/elibrary/
overview. Enter the docket number P
15104 in the docket number field to access the document. For assistance, contact FERC Online Support.
Dated: August 24, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202118614 Filed 82721; 8:45 am BILLING CODE 671701P
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Combined Notice of Filings 1
Take notice that the Commission received the following exempt wholesale generator filings:
Docket Numbers: EG21224000.
Applicants: PGR 2021 Lessee 7, LLC.
Description: Notice of SelfCertification of Exempt Wholesale Generator of EG or FC of PGR 2021
Lessee 7, LLC.
Filed Date: 8/23/21.
Accession Number: 202108235129.
Comment Date: 5 p.m. ET 9/13/21.
PO 00000
Frm 00037
Fmt 4703
Sfmt 4703
48421
Take notice that the Commission received the following electric rate filings:
Docket Numbers: ER212280001.
Applicants: Independence Wind Energy LLC.
Description: Tariff Amendment:
Amendment to MBR Application to be effective 8/30/2021.
Filed Date: 8/24/21.
Accession Number: 202108245034.
Comment Date: 5 p.m. ET 9/14/21.
Docket Numbers: ER212694001.
Applicants: PJM Interconnection, L.L.C.
Description: Tariff Amendment:
Amendment to ISA, SA No. 5481;
Queue No. AF1014 consent to be effective 7/16/2021.
Filed Date: 8/24/21.
Accession Number: 202108245068.
Comment Date: 5 p.m. ET 9/14/21.
Docket Numbers: ER212732000.
Applicants: Kansas Power Pool.
Description: Request for Limited Waiver of Formula Rate Deadlines, et al.
of the Kansas Power Pool.
Filed Date: 8/20/21.
Accession Number: 202108205243.
Comment Date: 5 p.m. ET 8/26/21.
Docket Numbers: ER212748000.
Applicants: Lund Hill Solar, LLC, Bracewell LLP.
Description: Baseline eTariff Filing:
Lund Hill Solar, LLC submits tariff filing per 35.12: Application for MarketBased Rate Authorization, Request for Related Waivers to be effective 9/15/
2021.
Filed Date: 8/23/21.
Accession Number: 202108235199.
Comment Date: 5 p.m. ET 9/13/21.
Docket Numbers: ER212749000.
Applicants: Northern Indiana Public Service Company LLC.
Description: 205d Rate Filing:
Supplement to WVPA IA to Remove Delivery Point to be effective 8/1/2021.
Filed Date: 8/23/21.
Accession Number: 202108235201.
Comment Date: 5 p.m. ET 9/13/21.
Docket Numbers: ER212750000.
Applicants: PJM Interconnection, L.L.C.
Description: PJM Interconnection, L.L.C. submits Petition for Termination of Waiver associated with Peak Shaving Adjustment Deadline.
Filed Date: 8/23/21.
Accession Number: 202108235241.
Comment Date: 5 p.m. ET 9/3/21.
Docket Numbers: ER212752000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: 205d Rate Filing:
20210824_SA 3489 Duke-Speedway Solar 1st Rev GIA J805 to be effective 8/9/2021.