Federal Register - August 30, 2021
Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.
Source: Federal Register
khammond on DSKJM1Z7X2PROD with NOTICES
48420
Federal Register / Vol. 86, No. 165 / Monday, August 30, 2021 / Notices
Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P10742004. Comments emailed to Commission staff are not considered part of the Commission record.
The Commissions Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project.
Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. Description of Request: The Licensee proposes to surrender its conduit exemption and remove the two turbines located in one of its two drinking water storage reservoirs. The turbines have rarely operated since they were installed. The exemptee is proposing to remove them as part of an upgrade to the pump station.
l. Locations of the Application: This filing may be viewed on the Commissions website at http
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http
www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects.
For assistance, call 18662083676 or email FERCOnlineSupport@ferc.gov, for TTY, call 202 5028659. Agencies may obtain copies of the application directly from the applicant.
m. Individuals desiring to be included on the Commissions mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214, respectively. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commissions Rules may become a party to the
VerDate Sep<11>2014
18:40 Aug 27, 2021
Jkt 253001
proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
o. Filing and Service of Documents:
Any filing must 1 bear in all capital letters the title COMMENTS, PROTEST, or MOTION TO
INTERVENE as applicable; 2 set forth in the heading the name of the applicant and the project number of the application to which the filing responds; 3 furnish the name, address, and telephone number of the person commenting, protesting or intervening;
and 4 otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis. Any filing made by an intervenor must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR
385.2010.
Dated: August 24, 2021.
Kimberly D. Bose, Secretary.
Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211
and 214 of the Commissions Regulations 18 CFR 385.211 and 385.214 on or before 5:00 p.m. Eastern time on the specified comment date.
Protests may be considered, but intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: http www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For other information, call 866 2083676
toll free. For TTY, call 202 5028659.
Dated: August 24, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202118615 Filed 82721; 8:45 am BILLING CODE 671701P
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
FR Doc. 202118617 Filed 82721; 8:45 am
Project No. 15104000
BILLING CODE 671701P
Premium Energy Holdings, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings Docket Numbers: RP211044000.
Applicants: International Paper Company.
Description: Joint Petition for Temporary Waiver of Capacity Release Regulations, et al. of International Paper Company.
Filed Date: 8/23/21.
Accession Number: 202108235236.
Comment Date: 5 p.m. ET 9/2/21.
Docket Numbers: RP211045000.
Applicants: Colorado Interstate Gas Company, L.L.C.
Description: Compliance filing:
Penalties Assessed Compliance Filing 2021 to be effective N/A.
Filed Date: 8/24/21.
Accession Number: 202108245030.
Comment Date: 5 p.m. ET 9/7/21.
The filings are accessible in the Commissions eLibrary system https
elibrary.ferc.gov/idmws/search/
fercgensearch.asp by querying the docket number.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
On February 25, 2021, the Premium Energy Holdings LLC, filed an application for a preliminary permit, pursuant to section 4f of the Federal Power Act FPA, proposing to study the feasibility of Tehachapi Pumped Storage Project to be located about 6 miles east of Lebec, in Kern County and Los Angeles County, California. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners express permission.
The proposed project includes three alternative project configurations alternatives A, B, and C. The proposed alternative A would consist of: 1 A
new upper reservoir using National Cement Companys existing quarry Quarry Reservoir with a surface area of 59 acres, and a total storage capacity of 14,610 acre-feet at a normal maximum operating elevation of 5,100 feet above average mean sea level msl; 2 a new 5,350-foot-long, 255-foot-high earthen dam impounding a new lower reservoir
E:FRFM30AUN1.SGM
30AUN1