Version en texte Qu'est-ce que c'est?Dateas est un site Web indépendant, non affilié à un organisme gouvernemental. La source des documents PDF que nous publions est l'agence officielle indiquée dans chacun d'eux. Les versions en texte sont des transcriptions non officielles que nous faisons pour fournir de meilleurs outils d'accès et de recherche d'informations, mais peuvent contenir des erreurs ou peuvent ne pas être complètes.

Source: Federal Register

Federal Register / Vol. 86, No. 181 / Wednesday, September 22, 2021 / Notices Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page: Enosburg Falls Hydroelectric Project P2905035.
The Commissions Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. The application is not ready for environmental analysis at this time.
l. The existing project consists of: 1
A 195-foot-long, 18.5-foot-high concrete gravity dam; 2 an impoundment with a surface area of 121 acres at an elevation of 386.87 feet National Geodetic Vertical Datum of 1929 NGVD
29; 3 a steel headgate structure that includes three sluice gates; 4 an 80foot-long steel penstock that provides flow to a 375-kilowatt kW semi-Kaplan turbine-generator unit located in a powerhouse Kendall Plant; 5 an approximately 5-foot-long tailrace that discharges to the Missisquoi River from the Kendall Plant; 6 an approximately 210-foot-long headrace canal located downstream of the headgate structure;
7 an intake structure, at the downstream end of the headrace canal, equipped with a sluice gate and a trashrack; 8 a powerhouse containing a 600-kW vertical Kaplan turbinegenerator unit Village Plant; 9 an approximately 240-foot-long tailrace that discharges from the Village Plant to the Missisquoi River; and 10
appurtenant facilities. The project creates an approximately 1,400-footlong bypassed reach of the Missisquoi River.
The Village voluntarily operates the project in a run-of-river mode. Article 401 of the current license requires the Village to: 1 Maintain a minimum flow of 293 cubic feet per second cfs from April 15June 15, and 120 cfs from June 16April 14, or inflow, whichever is less, from the Kendall Plant to the bypassed reach; and 2 maintain a yearround minimum flow of 293 cfs or inflow, whichever is less, from the Village Plant to the downstream reach of the Missisquoi River.
The Village proposes to: 1 Continue operating the project in a run-of-river mode; 2 provide a year-round minimum flow of 243 cfs, or inflow, whichever is less, from the Kendall Plant to the bypassed reach; 3 develop
VerDate Sep<11>2014

16:44 Sep 21, 2021

Jkt 253001

a recreation management plan for improving recreation at the project; 4
release 1 inch of spill over the top of the project dam crest gates to provide an aesthetic veil of flow over the dam; 5
develop an operation compliance monitoring plan for maintaining minimum flows, impoundment levels, and run-of-river operation; and 6
develop a historic properties management plan to address and mitigate project effects on historic properties.
m. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents via the internet through the Commissions Home Page http www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call toll-free, 866 2083676 or TYY, 202
5028659.
n. You may also register online at https ferconline.ferc.gov/
FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects.
For assistance, contact FERC Online Support.
o. Scoping Process.
Commission staff will prepare either an environmental assessment EA or an Environmental Impact Statement EIS
that describes and evaluates the probable effects, if any, of the licensees proposed action and alternatives. The EA or EIS will consider environmental impacts and reasonable alternatives to the proposed action. The Commissions scoping process will help determine the required level of analysis and satisfy the NEPA scoping requirements, irrespective of whether the Commission prepares an EA or an EIS. At this time, we do not anticipate holding on-site scoping meetings. Instead, we are soliciting written comments and suggestions on the preliminary list of issues and alternatives to be addressed in the NEPA document, as described in scoping document 1 SD1, issued September 15, 2021.
Copies of the SD1 outlining the subject areas to be addressed in the NEPA document were distributed to the parties on the Commissions mailing list and the applicants distribution list.
Copies of SD1 may be viewed on the web at http www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call 1866
2083676 or for TTY, 202 5028659.

PO 00000

Frm 00036

Fmt 4703

Sfmt 4703

52667

Dated: September 15, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202120460 Filed 92121; 8:45 am BILLING CODE 671701P

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Combined Notice of Filings 1
Take notice that the Commission received the following exempt wholesale generator filings:
Docket Numbers: EG21253000.
Applicants:. Bay Tree Solar, LLC.
Description:. Notice of SelfCertification of Exempt Wholesale Generator Status of Bay Tree Solar, LLC.
Filed Date: 9/16/21.
Accession Number: 202109165053.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: EG21254000.
Applicants: Bay Tree Lessee, LLC.
Description: Notice of SelfCertification of Exempt Wholesale Generator status of Bay Tree Lessee, LLC.
Filed Date: 9/16/21.
Accession Number: 202109165058.
Comment Date: 5 p.m. ET 10/7/21.
Take notice that the Commission received the following electric rate filings:
Docket Numbers: ER212214001.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Compliance filing: 2021
0916_Att X Financial Improvements and PGIA Compliance Filing to be effective 12/31/9998.
Filed Date: 9/16/21.
Accession Number: 202109165043.
Comment Date: 5 p.m. ET 10/7/21.
Docket Numbers: ER212892000.
Applicants: Prairie Wolf Solar, LLC.
Description: Baseline eTariff Filing:
Reactive Power Compensation Filing to be effective 11/14/2021.
Filed Date: 9/15/21.
Accession Number: 202109155147.
Comment Date: 5 p.m. ET 10/6/21.
Docket Numbers: ER212893000.
Applicants: PJM Interconnection, L.L.C.
Description: 205d Rate Filing:
Original WMPA, SA No. 6171; Queue No. AF2276 to be effective 8/25/2021.
Filed Date: 9/16/21.
Accession Number: 202109165015.
Comment Date: 5 pm ET 10/7/21.
Docket Numbers: ER212894000.
Applicants: New York Independent System Operator, Inc., Niagara Mohawk Power Corporation.

E:FRFM22SEN1.SGM

22SEN1

Acerca de esta edición

Federal Register - September 22, 2021

TitreFederal Register

PaysÉtats-Unis

Date22/09/2021

Page count242

Edition count7800

Première édition14/03/1936

Dernière édition23/06/2026

Télécharger cette édition

Otras ediciones

<<<Septiembre 2021>>>
DLMMJVS
1234
567891011
12131415161718
19202122232425
2627282930