Version en texte Qu'est-ce que c'est?Dateas est un site Web indépendant, non affilié à un organisme gouvernemental. La source des documents PDF que nous publions est l'agence officielle indiquée dans chacun d'eux. Les versions en texte sont des transcriptions non officielles que nous faisons pour fournir de meilleurs outils d'accès et de recherche d'informations, mais peuvent contenir des erreurs ou peuvent ne pas être complètes.
Source: Federal Register
Federal Register / Vol. 86, No. 179 / Monday, September 20, 2021 / Notices i. FERC Contact: Monir Chowdhury at 202 5026736 or email at monir.chowdhury@ferc.gov.
j. This application is not ready for environmental analysis at this time.
k. Project Description: The Little Falls Project consists of: 1 Two state-owned dams i.e., North State Dam and South State Dam joined by an island, and equipped with 1-foot-high flashboards and flow control gates, with a total length of 594 feet and a height of about 6.25 feet; 2 a reservoir with a storage capacity of 800 acre-feet at a normal surface elevation of 363.8 feet; 1 3 a 45foot-wide, 300-foot-long navigation lock Lock 17; 4 a 55-foot-wide, 73-footlong concrete intake structure with two roller head gates to control flow through the intake; 5 two 14-foot-diameter, 90foot-long steel penstocks; 6 a 65-footwide by 99-foot-long concrete powerhouse containing two-turbinegenerator units each with a capacity of 6.8 megawatts; 7 two sets of 4.16kilovolt kV, 60-foot-long generator leads that run from the powerhouse to a switchyard containing a 4.16/46-kV
transformer; 8 a 46-kV, 50-foot-long transmission line from the switchyard to a nearby interconnection point that connects the project with the National Grid; and 9 appurtenant facilities.
There are several structures inside the project boundary that are not considered part of the project: A flood gate structure owned by the New York State Canal Corporation to protect the canal during periods of high headwater; the Middle Dam, with sixty percent of the dam currently breached, located in the bypassed reach of the Mohawk River, and built as part of a hydropower plant that was decommissioned in 1962; and the Gilbert Dam located also in the bypassed reach approximately 700 feet upstream of the powerhouse to measure flow through the Mohawk River and to assure minimum flow conditions are met in the river.
l. In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested individuals an opportunity to view and/or print the contents of this document and the full license application via the internet through the Commissions Home Page www.ferc.gov using the eLibrary link. At this time, the Commission has suspended access to the Commissions Public Access Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease COVID19, issued 1 All elevations refer to Barge Canal Datum which is 0.8 foot higher than elevations in National Geodetic Vertical Datum of 1929.
VerDate Sep<11>2014
16:49 Sep 17, 2021
Jkt 253001
by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, 886 2083676 or TTY, 202
5028659.
m. You may also register online at http www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects.
For assistance, contact FERC Online Support.
n. Procedural schedule: The application will be processed according to the following preliminary Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate.
Milestone
Target date
Issue Deficiency Letter if necessary.
Request Additional Information.
Notice of Acceptance/Notice of Ready for Environmental Analysis.
September 2021.
October 2021.
February 2022.
o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.
Dated: September 14, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202120271 Filed 91721; 8:45 am BILLING CODE 671701P
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Combined Notice of Filings 1
Take notice that the Commission received the following electric corporate filings:
Docket Numbers: EC21133000.
Applicants: Maverick Solar 6, LLC, Maverick Solar 7, LLC.
Description: Joint Application for Authorization Under Section 203 of the Federal Power Act of Maverick Solar 6, LLC, et al.
Filed Date: 9/13/21.
Accession Number: 202109135247.
Comment Date: 5 pm ET 10/4/21.
Take notice that the Commission received the following electric rate filings:
Docket Numbers: ER212424001.
Applicants: Generation Bridge M&M
Holdings, LLC.
Description: Tariff Amendment:
Amendment to Market-Based Rate Application and Response to Deficiency Letter to be effective 7/15/2021.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
52143
Filed Date: 9/14/21.
Accession Number: 202109145161.
Comment Date: 5 pm ET 10/5/21.
Docket Numbers: ER212884000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: 205d Rate Filing:
20210914_SA 3438 Entergy ArkansasLong Lake Solar 1st Rev GIA J663 J834
to be effective 9/8/2021.
Filed Date: 9/14/21.
Accession Number: 202109145116.
Comment Date: 5 pm ET 10/5/21.
Docket Numbers: ER212885000.
Applicants: Arizona Public Service Company.
Description: 205d Rate Filing:
Service Agreement No. 300 to be effective 11/14/2021.
Filed Date: 9/14/21.
Accession Number: 202109145118.
Comment Date: 5 pm ET 10/5/21.
Docket Numbers: ER212886000.
Applicants: Old Middleboro Road Solar, LLC.
Description: Baseline eTariff Filing:
Old Middleboro Road Solar, LLC MBR
Application Filing to be effective 10/1/
2021.
Filed Date: 9/14/21.
Accession Number: 202109145140.
Comment Date: 5 pm ET 10/5/21.
Docket Numbers: ER212887000.
Applicants: Leicester Street Solar, LLC.
Description: Baseline eTariff Filing:
Leicester Street Solar LLC MBR
Application Filing to be effective 10/1/
2021.
Filed Date: 9/14/21.
Accession Number: 202109145141.
Comment Date: 5 pm ET 10/5/21.
The filings are accessible in the Commissions eLibrary system https
elibrary.ferc.gov/idmws/search/
fercgensearch.asp by querying the docket number.
Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211
and 214 of the Commissions Regulations 18 CFR 385.211 and 385.214 on or before 5:00 p.m. Eastern time on the specified comment date.
Protests may be considered, but intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: http www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For other information, call 866 2083676
toll free. For TTY, call 202 5028659.
E:FRFM20SEN1.SGM
20SEN1