Version en texte Qu'est-ce que c'est?Dateas est un site Web indépendant, non affilié à un organisme gouvernemental. La source des documents PDF que nous publions est l'agence officielle indiquée dans chacun d'eux. Les versions en texte sont des transcriptions non officielles que nous faisons pour fournir de meilleurs outils d'accès et de recherche d'informations, mais peuvent contenir des erreurs ou peuvent ne pas être complètes.

Source: Federal Register

Federal Register / Vol. 86, No. 165 / Monday, August 30, 2021 / Notices qualified under an NRC-approved program, the NRC staff considers the CFH to have sufficient knowledge of operational and safety concerns, such that allowing the CFH to suspend security measures in an emergency or during severe weather will not result in undue risk to the public health and safety.
In addition, since the exemption allows a CFH the same authority currently given to the licensed senior operator under 10 CFR 73.55p1i and ii, no change is required to physical security. Since no change is required to physical security, the exemption would not reduce the overall effectiveness of the Dresden physical security plan and would not adversely impact the licensees ability to physically secure the site or protect special nuclear material at Dresden and, thus, would not have an effect on the common defense and security. The NRC
staff has determined that the exemption would not reduce security measures currently in place to protect against radiological sabotage. Instead, the exemption would align the requirements of 10 CFR 73.55p1i and ii with the existing requirements of 10 CFR 50.54y.
For these reasons, granting the exemption from the requirements in 10
CFR 73.55p1i and ii to permit, as a minimum, a CFH, in addition to a licensed senior operator, to approve the suspension of security measures in an emergency or during severe weather at Dresden when it is permanently shutdown will not endanger life or property or the common defense and security.

khammond on DSKJM1Z7X2PROD with NOTICES

C. The Exemption Is Otherwise in the Public Interest The proposed exemption would allow a CFH, in addition to a licensed senior operator, to approve the suspension of security measures in an emergency when immediately needed to protect the public health and safety or during severe weather when immediately needed to protect the personal health and safety of security force personnel at Dresden when it is permanently shutdown. If the exemption is not granted, Dresden will be required to have a licensed senior operator available to approve the suspension of security measures in an emergency or during severe weather for a permanently shutdown plant, even though there would no longer be an NRC requirement for Exelon to maintain a licensed senior operator at Dresden after the certifications required by 10 CFR
50.82a1i and ii are submitted.

VerDate Sep<11>2014

18:40 Aug 27, 2021

Jkt 253001

This proposed exemption is in the public interest for the following reasons.
Without the exemption there would be uncertainty regarding how the licensee would invoke the temporary suspension of security measures that may be needed for protecting the public health and safety or the personal health and safety of the security force personnel in emergencies or during severe weather, given the differences between the requirements in 10 CFR 73.55p1i and ii and 10 CFR 50.54y. The exemption would allow the licensee to make decisions pursuant to 10 CFR
73.55p1i and ii without having to maintain a staff of licensed senior operators at a nuclear power reactor that has permanently ceased operations and permanently removed fuel from the reactor vessel. The exemption would also allow the licensee to have an established procedure in place to allow either a licensed senior operator or a CFH to suspend security measures in an emergency or during severe weather after the certifications required by 10
CFR 50.82a1i and ii have been submitted. Finally, the consistent and efficient regulation of nuclear power plants serves the public interest and this exemption would assure consistency between the regulations in 10 CFR part 73 and 10 CFR 50.54y and the requirements concerning licensed operators in 10 CFR part 55.
The NRC staff has determined that granting the proposed exemption would allow the licensee to designate a CFH
with qualifications appropriate for a permanently shutdown and defueled reactor to approve the suspension of security measures in an emergency to protect the public health and safety and during severe weather to protect the personal health and safety of the security force personnel. The actions permitted by the exemption may be implemented at Dresden when both the certification of permanent cessation of operations and the certification of permanent fuel removal are submitted in accordance with 10 CFR 50.82a1i and ii, which is consistent with the similar authority provided by 10 CFR
50.54y. Therefore, the exemption is in the public interest.
D. Environmental Consideration The NRCs approval of the proposed exemption belongs to a category of actions that the Commission, by rule or regulation, has declared to be a categorical exclusion, after first finding that the category of actions does not individually or cumulatively have a significant effect on the human environment. Specifically, the NRCs approval of the exemption is
PO 00000

Frm 00065

Fmt 4703

Sfmt 4703

48449

categorically excluded from further environmental analysis under 10 CFR
51.22c25.
Under 10 CFR 51.22c25, the granting of an exemption from the requirements of any regulation of Chapter I to 10 CFR is a categorical exclusion provided that: i There is no significant hazards consideration; ii there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; iii there is no significant increase in individual or cumulative public or occupational radiation exposure; iv there is no significant construction impact; v there is no significant increase in the potential for or consequences from radiological accidents; and vi the requirements from which the exemption is sought involve, among others:
Safeguard plans, and materials control and accounting inventory scheduling requirements or other requirements of an administrative, managerial, or organizational nature. The basis for the NRCs determination is provided in the following evaluation of the requirements in 10 CFR 51.22c25i vi.
Requirements in 10 CFR 51.22c25i To qualify for a categorical exclusion under 10 CFR 51.22c25i, the exemption must involve a no significant hazards consideration. The criteria for making a no significant hazards consideration determination are found in 10 CFR 50.92c. The NRC staff has determined that granting the proposed exemption involves no significant hazards consideration because allowing a CFH, in addition to a licensed senior operator, to approve the security suspension at a permanently shutdown and defueled power plant does not 1
involve a significant increase in the probability or consequences of an accident previously evaluated; or 2
create the possibility of a new or different kind of accident from any accident previously evaluated; or 3
involve a significant reduction in a margin of safety. The proposed exemption is unrelated to any operational restriction. Therefore, the requirements of 10 CFR 51.22c25i are met.
Requirements in 10 CFR 51.22c25ii and iii The proposed exemption would not change radioactive effluents or emissions that affect radiation exposures to plant workers and members of the public. Accordingly, there is no significant change in the types or significant increase in the
E:FRFM30AUN1.SGM

30AUN1

Acerca de esta edición

Federal Register - August 30, 2021

TitreFederal Register

PaysÉtats-Unis

Date30/08/2021

Page count194

Edition count7798

Première édition14/03/1936

Dernière édition18/06/2026

Télécharger cette édition

Otras ediciones

<<<Agosto 2021>>>
DLMMJVS
1234567
891011121314
15161718192021
22232425262728
293031