Version en texte Qu'est-ce que c'est?Dateas est un site Web indépendant, non affilié à un organisme gouvernemental. La source des documents PDF que nous publions est l'agence officielle indiquée dans chacun d'eux. Les versions en texte sont des transcriptions non officielles que nous faisons pour fournir de meilleurs outils d'accès et de recherche d'informations, mais peuvent contenir des erreurs ou peuvent ne pas être complètes.
Source: Federal Register
Federal Register / Vol. 86, No. 151 / Tuesday, August 10, 2021 / Notices
43693
LICENSE AMENDMENT ISSUANCESContinued Public Comments Received as to Proposed NSHC Yes/No.
No.
Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2, Will County, IL
Docket Nos
Amendment Date
ADAMS Accession No
Amendment Nos
Brief Description of Amendments
Public Comments Received as to Proposed NSHC Yes/No.
50456, 50457.
July 13, 2021.
ML21154A046.
222 Unit 1 and 222 Unit 2.
The amendments revised Technical Specification Surveillance Requirement 3.7.9.2 to allow an ultimate heat sink temperature of less than or equal to 102.8 degrees Fahrenheit through September 30, 2021.
No.
Exelon Generation Company, LLC; Clinton Power Station, Unit No. 1; DeWitt County, IL
Docket Nos
Amendment Date
ADAMS Accession No
Amendment Nos
Brief Description of Amendments
Public Comments Received as to Proposed NSHC Yes/No.
50461.
June 28, 2021.
ML21132A288.
238.
The amendment modified the technical specifications to permit the use of risk-informed completion times in accordance with Technical Specifications Task Force TSTF Traveler TSTF505, Revision 2, Provide Risk Informed Extended Completion TimesRITSTF RiskInformed TSTF Initiative 4b.
No.
Exelon Generation Company, LLC; LaSalle County Station, Units 1 and 2; LaSalle County, IL
Docket Nos
Amendment Date
ADAMS Accession No
Amendment Nos
Brief Description of Amendments
Public Comments Received as to Proposed NSHC Yes/No.
50373, 50374.
July 13, 2021.
ML21158A228.
250 Unit 1 and 236 Unit 2.
The amendments modified technical specification TS requirements in TS 3.7.3, Ultimate Heat Sink UHS, as follows: 1 TS 3.7.3, Condition A, was modified to remove reference to the UHS bottom elevation limit; 2 TS 3.7.3, Condition B, was deleted; 3 TS Figure 3.7.31 diurnal curve was modified; 4 Surveillance Requirement SR 3.7.3.1 was modified to correct a discrepancy in the TS and allow proper application of TS 3.7.3; 5 Sedimentation Level in SR 3.7.3.2 was modified from 18 inches to 6 inches; and 6 SR 3.7.3.3 was deleted.
No.
Holtec Decommissioning International, LLC; Oyster Creek Nuclear Generating Station; Forked River, NJ
Docket Nos
Amendment Date
ADAMS Accession No
Amendment Nos
Brief Description of Amendments
Public Comments Received as to Proposed NSHC Yes/No.
50219.
June 25, 2021.
ML21119A056 Package.
299.
NRC issued Amendment No. 299 to Renewed Facility Operating License No. DPR16 for the Oyster Creek Nuclear Generating Station Oyster Creek. The amendment consisted of revisions to the Renewed Facility Operating License and the Permanently Defueled Technical Specifications. These changes reflected the removal of all spent nuclear fuel from the spent fuel pool and its transfer to dry cask storage within an on-site Independent Spent Fuel Storage Installation ISFSI. These changes will more fully reflect the permanently shutdown status of the decommissioning facility, as well as the reduced scope of structures, systems, and components necessary to ensure plant safety now that all spent fuel has been permanently moved to the Oyster Creek ISFSI, an activity which was completed as of May 21, 2021 ADAMS Accession No. ML21160A065.
No.
jbell on DSKJLSW7X2PROD with NOTICES
Holtec Decommissioning International, LLC; Oyster Creek Nuclear Generating Station; Forked River, NJ
Docket Nos
Amendment Date
ADAMS Accession No
Amendment Nos
VerDate Sep<11>2014
17:05 Aug 09, 2021
Jkt 253001
50219.
June 25, 2021.
ML21159A242 Package.
300.
PO 00000
Frm 00070
Fmt 4703
Sfmt 4703
E:FRFM10AUN1.SGM
10AUN1