Version en texte Qu'est-ce que c'est?Dateas est un site Web indépendant, non affilié à un organisme gouvernemental. La source des documents PDF que nous publions est l'agence officielle indiquée dans chacun d'eux. Les versions en texte sont des transcriptions non officielles que nous faisons pour fournir de meilleurs outils d'accès et de recherche d'informations, mais peuvent contenir des erreurs ou peuvent ne pas être complètes.
Source: Federal Register
10046
Federal Register / Vol. 86, No. 31 / Thursday, February 18, 2021 / Notices
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Project No.15056000
jbell on DSKJLSW7X2PROD with NOTICES
Premium Energy Holdings, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On November 19, 2020, Premium Energy Holdings, LLC, filed an application for a preliminary permit, pursuant to section 4f of the Federal Power Act FPA, proposing to study the feasibility of the Ashokan Pumped Storage Project to be located 14 miles west of the City of Kingston in Ulster County, New York. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners express permission.
The proposed project would consist of the following: 1 A new 2,618-foot-long, 212-foot-high roller-compacted concrete dam for the upper reservoir for alternative 1 Stony Clove Reservoir with a surface area of 245 acres and a storage capacity 22,496 acre-feet at a surface elevation of 1,500 feet above mean sea level msl; 2 a new 2,736foot-long, 232-foot-high rollercompacted concrete dam for the upper reservoir for alternative 2 Woodland Reservoir with a surface area of 313
acres and a storage capacity 26,231 acrefeet at a surface elevation of 1,210 feet msl; 3 a new 2,527-foot-long, 304-foothigh roller-compacted concrete dam for the upper reservoir for alternative 3
Wittenberg Reservoir with a surface area of 226 acres and a storage capacity 25,558 acre-feet at a surface elevation of 1,180 feet msl; 4 the existing Ashokan Reservoir for the lower reservoir with a surface area of 8,300 acres and a storage capacity of 382,358 acre-feet at a surface elevation of 585 feet msl; 5 new 13.99mile-long tunnels, shafts, and penstocks for alternative 1 connecting the upper and lower reservoirs; 6 new 11.58mile-long tunnels, shafts, and penstocks for alternative 2 connecting the upper and lower reservoirs; 7 new 3.81-milelong tunnels, shafts, and penstocks for alternative 3 connecting the upper and lower reservoirs; 8 a new 500-footlong, 125-foot-wide, 150-foot-high underground reinforced-concrete powerhouse containing five turbinegenerator units with a total rated
VerDate Sep<11>2014
17:47 Feb 17, 2021
Jkt 253001
capacity of 800 megawatts; 9 a 17.3mile-long, 230-kilovolt new transmission line for alternatives 1 and 2 from the proposed Ashokan switchyard to the existing Hurley avenue substation; 10 a 12.9-mile-long, 230-kilovolt new transmission line for alternative 3 from the proposed Ashokan switchyard to the existing Hurley avenue substation; and 11
appurtenant facilities. The proposed project would have a maximum annual generation of 2,700 gigawatt-hours.
Applicant Contact: Victor M. Rojas, Premium Energy Holdings, LLC, 355
South Lemon Avenue, Suite A, Walnut, CA 91789; phone: 9095955314.
FERC Contact: Woohee Choi; phone:
202 5026336.
Deadline for filing comments, motions to intervene, competing applications without notices of intent, or notices of intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commissions eFiling system at https
ferconline.ferc.gov/eFiling.aspx.
Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https ferconline.ferc.gov/
QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P15056000.
More information about this project, including a copy of the application, can be viewed or printed on the eLibrary link of the Commissions website at http www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number P15056 in the docket number field to access the document. For assistance, contact FERC Online Support.
PO 00000
Frm 00013
Fmt 4703
Sfmt 4703
Dated: February 11, 2021.
Nathaniel J. Davis, Sr., Deputy Secretary.
FR Doc. 202103272 Filed 21721; 8:45 am BILLING CODE 671701P
DEPARTMENT OF ENERGY
Case Number 2020010; EERE2020BT
WAV0026
Energy Conservation Program:
Notification of Petition for Waiver of Hussmann Corporation From the Department of Energy Walk-In Coolers and Walk-In Freezers Test Procedure and Notice of Grant of Interim Waiver Office of Energy Efficiency and Renewable Energy, Department of Energy.
ACTION: Notification of petition for waiver and grant of an interim waiver;
request for comments.
AGENCY:
This document announces receipt of and publishes a petition for waiver and interim waiver from Hussmann Corporation Hussmann, which seeks a waiver for specified carbon dioxide CO2 direct expansion unit cooler basic models from the U.S. Department of Energy DOE
test procedure used to determine the efficiency of walk-in cooler and walk-in freezer refrigeration systems. DOE also gives notice of an Interim Waiver Order that requires Hussmann to test and rate the specified CO2 direct expansion unit cooler basic models in accordance with the alternate test procedure set forth in the Interim Waiver Order. DOE solicits comments, data, and information concerning Hussmanns petition and its suggested alternate test procedure so as to inform DOEs final decision on Hussmanns waiver request.
DATES: The Interim Waiver Order is effective on February 18, 2021. Written comments and information will be accepted on or before March 22, 2021.
ADDRESSES: Interested persons are encouraged to submit comments using the Federal eRulemaking Portal at http www.regulations.gov.
Alternatively, interested persons may submit comments, identified by case number 2020010, and Docket number EERE2020BTWAV0026, by any of the following methods:
Federal eRulemaking Portal: http
www.regulations.gov. Follow the instructions for submitting comments.
Email:
HussmannWICF2020WAV0026@
ee.doe.gov. Include Case No. 2020010
in the subject line of the message.
Postal Mail: Appliance and Equipment Standards Program, U.S.
SUMMARY:
E:FRFM18FEN1.SGM
18FEN1