Federal Register - February 17, 2021

Version en texte Qu'est-ce que c'est?Dateas est un site Web indépendant, non affilié à un organisme gouvernemental. La source des documents PDF que nous publions est l'agence officielle indiquée dans chacun d'eux. Les versions en texte sont des transcriptions non officielles que nous faisons pour fournir de meilleurs outils d'accès et de recherche d'informations, mais peuvent contenir des erreurs ou peuvent ne pas être complètes.

Source: Federal Register

jbell on DSKJLSW7X2PROD with NOTICES

9924

Federal Register / Vol. 86, No. 30 / Wednesday, February 17, 2021 / Notices
forebay; 4 a 6-foot-wide sluice gate for a minimum flow of 31 cfs; 5 four 40foot-long steel penstocks; 6 a 60-footlong, 45-foot-wide, 29-foot-high powerhouse containing three horizontal double-runner Francis turbine units with actual ratings of 740 kilowatts kW, 540 kW, and 360 kW, respectively, for a total capacity of 1,640
kW; 2 7 a 30-foot-long, 37-foot-wide tailrace; 8 a 230-foot-long bypassed reach; 9 a 115-foot-long transmission line from the project generators to a New York State Electric and Gas Corporations 4.16-kilovolt kV
distribution line; 10 a substation with a single-phase 13.2-kV transformer; and 11 appurtenant facilities.
Walden Hydro proposes to continue operating the project in a run-of-river mode, with no changes to the existing operation or facilities.
m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commissions website at http www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC
Online Support. A copy is also available for inspection and reproduction at the address in item h above.
All filings must 1 bear in all capital letters the title COMMENTS, REPLY
COMMENTS, RECOMMENDATIONS, TERMS
AND CONDITIONS, or PRESCRIPTIONS; 2 set forth in the heading the name of the applicant and the project number of the application to which the filing responds; 3 furnish the name, address, and telephone number of the person submitting the filing; and 4 otherwise comply with the requirements of 18 CFR 385.2001
through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34b.
Agencies may obtain copies of the application directly from the applicant.
Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34b and 385.2010.
You may also register online at http
www.ferc.gov/docs-filing/
esubscription.asp to be notified via 2 In an October 14, 2020 filing, Walden Hydro stated that although the total rated capacity of the project as stated in the license application is 2,110
kW 980 kW, 630 kW, and 500 kW, the maximum achievable output from each turbine/generator unit is lower than the stated capacities.

VerDate Sep<11>2014

20:43 Feb 16, 2021

Jkt 253001

email of new filings and issuances related to this or other pending projects.
For assistance, contact FERC Online Support.
n. A license applicant must file no later than 60 days following the date of issuance of this notice: 1 A copy of the water quality certification; 2 a copy of the request for certification, including proof of the date on which the certifying agency received the request; or 3
evidence of waiver of water quality certification.
o. Procedural schedule: The application will be processed according to the following schedule. Revisions to the schedule will be made as appropriate.
Milestone
Target date
Deadline for Filing Comments, Recommendations, and Agency Terms and Conditions/Prescriptions.
Deadline for Filing Reply Comments.

April 2021.

May 2021.

Dated: February 10, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202103156 Filed 21621; 8:45 am BILLING CODE 671701P

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Project No. 4451024

Green Mountain Power Corporation, City of Somersworth, New Hampshire;
Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: Subsequent Minor License.
b. Project No.: 4451024.
c. Date filed: April 30, 2020.
d. Applicants: Green Mountain Power and the City of Somersworth, New Hampshire.
e. Name of Project: Lower Great Falls Hydroelectric Project.
f. Location: On the Salmon Falls River in Strafford County, New Hampshire, and York County, Maine. The project does not occupy federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a825r.
h. Applicant Contact: Mr. John Greenan, Green Mountain Power
PO 00000

Frm 00020

Fmt 4703

Sfmt 4703

Corporation, 1252 Post Road, Rutland, VT 05701; Phone at 802 7702195, or email at john.greenan@
greenmountainpower.com.
i. FERC Contact: Amanda Gill, 202
5026773 or amanda.gill@ferc.gov.
j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice;
reply comments are due 105 days from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file comments, recommendations, terms and conditions, and prescriptions using the Commissions eFiling system at https
ferconline.ferc.gov/FERCOnline.aspx.
Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https ferconline.ferc.gov/
QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@
ferc.gov, 866 2083676 toll free, or 202 5028659 TTY. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to:
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225
Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P4451
024.
The Commissions Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project.
Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. This application has been accepted and is ready for environmental analysis at this time.
The Council on Environmental Quality CEQ issued a final rule on July 15, 2020, revising the regulations under 40 CFR parts 15001518 that federal agencies use to implement the National Environmental Policy Act NEPA see Update to the Regulations Implementing the Procedural Provisions of the National Environmental Policy Act, 85
FR 43,304. The Final Rule became effective on and applies to any NEPA

E:FRFM17FEN1.SGM

17FEN1

Acerca de esta edición

Federal Register - February 17, 2021

TitreFederal Register

PaysÉtats-Unis

Date17/02/2021

Page count179

Edition count7801

Première édition14/03/1936

Dernière édition24/06/2026

Télécharger cette édition

Otras ediciones

<<<Febrero 2021>>>
DLMMJVS
123456
78910111213
14151617181920
21222324252627
28