Federal Register - September 24, 1938

Version en texte Qu'est-ce que c'est?Dateas est un site Web indépendant, non affilié à un organisme gouvernemental. La source des documents PDF que nous publions est l'agence officielle indiquée dans chacun d'eux. Les versions en texte sont des transcriptions non officielles que nous faisons pour fournir de meilleurs outils d'accès et de recherche d'informations, mais peuvent contenir des erreurs ou peuvent ne pas être complètes.

Source: Federal Register

O N L
Vr
VOLUME 3

ftr;-

REGISTER
1934

amted

NUMBER 187

Washington, Saturday, September 24, 1938
Rules , Regulations, Orders
C. That the required maintenance and preservation of the rectified channel will include the following items:

CONTENTS
RULES, REGULATIONS, ORDERS

TITLE 22FOREIGN RELATIONS

1. An annual clearing of the entire T itle 22 F oreign R elations :
IN TE R N A TIO N A L BOUNDARY COM right of way to insure a continued maxi International Boundary Com MISSION, UNITED STATES AND mum flood-flow capacity;
mission, United States and MEXICO
2. The replacement of material in Mexico:
Page levees and groins which may be eroded M in u te N o. 165
Rio Grande Rectification by the action of rains or floods;
R ules and R egulations for the M ainte
Project in El Paso-Juarez 3. The placing of earthwork in the nance and P reservation of the R io Valley, maintenance and building of new groins;
G rande R ectification P roject in the 4. The placing of revetments along preservation of_________
2297
E l P aso-J uarez V alley levees where material is unstable or flow T itle 24 H ousing C redit :
conditions so require;
C iudad Juárez, Ch ih u ah u a , Federal Housing Administra 5. The performance of earthwork August 13, 1938.
tion:
H ie Commission met at the offices of within or along the sides of the pilot Mutual mortgage insurance the Mexican Section in Ciudad Juárez, channel where sand bars or islands may fund and housing insur Chihuahua, at 10:00 A. M., August 13, form or hard material be encountered or ance fund debentures, 1938, for the purpose of formulating side erosion occur;
6. The placing of revetments along the regulations to make effective the main transactions and operatenance and preservation of the rectified sides of the pilot channel to prevent tions in _________________ 2298
erosion;
channel of the Rio Grande in the El 7. The smoothing of the floodway floor T i t l e 25 I n d i a n s :
Paso-Juarez Valley, in accordance with Office of Indian Affairs:
the Convention of February 1, 1933, and wherever floods may so deposit material as to form obstruction to u n iform flow;
Loans to Indians from reim its annexes.
8. And as to the structures, their en bursable funds_____ ____ 2299
The Commission reviewed the Con vention of February 1, 1933, as well as largement if needed, the painting of T itle 26 I nternal R evenue :
the maps and reports relating to the wood and metal work and the replace Bureau of Internal Revenue:
construction of the Rio Grande Rectifi ment of worn or broken parts.
Abolishment of information cation Project, and now finds and de D. That inasmuch as Article X I of the returns for employees termines: /
Convention provides that the Interna who attain age 65 or die_ 2303
A. That the rectified channel has tional Boundary Commission is charged T
itle 35
P arks and F orests:
with the maintenance and preservation been completed throughout its length, National Park Service:
in accordance with the provisions of the of the rectified channel, and requires that to this end the Commission shall Convention of February 1, 1933.
Morristown National Histori B. That the rectified channel occupies submit, for the approval of both govern cal Park, local subsidiary a strip of land about 225 meters in ments, the regulations that should be is regulation_______________ 2303
width, within which there have been sued to make effective such maintenance, T itle 46 S h ip p in g :
constructed a pilot channel for the nor there are hereby submitted for adop Bureau of Marine Inspection mal flow of the river and a floodway tion the following:
and Navigation:
formed by the building of levees to RULES AND REGULATIONS
either side to carry the flood flows. The Numbering and recording un levees are generally 180 meters apart, I. The International Boundary Com documented vessels, reg and the remaining strips of land on mission shall keep the floodway clear of ulations amended_______
2303
both sides are partly occupied by the vegetation. The United States Section levees and other works and partly un shall be responsible for and perform the NOTICES
occupied. The structures built within labor required on the portion comprised the rectified channel right of way con between the pilot channel and the left Securities and Exchange Commis sion:
sist of bridges, grade controls and gag or northerly levee, and the Mexican Sec ing stations extending across the flood tion shall be responsible for and per Utilities Elkhorn Coal Co., and way, and culverts through the levees. form the labor required on the portion James G. Culbertson, order Additional structures of similar types comprised between the pilot channel and pursuant to Rule U -llF -2 _ 2303
may be built in the future.
the right or southerly levee. The ex2297

Acerca de esta edición

Federal Register - September 24, 1938

TitreFederal Register

PaysÉtats-Unis

Date24/09/1938

Page count8

Edition count7770

Première édition14/03/1936

Dernière édition08/05/2026

Télécharger cette édition

Dernière édition

Otras ediciones

<<<Septiembre 1938>>>
DLMMJVS
123
45678910
11121314151617
18192021222324
252627282930