Federal Register - September 20, 2021

Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.

Fuente: Federal Register

52142

Federal Register / Vol. 86, No. 179 / Monday, September 20, 2021 / Notices
switchyard; 6 a 1,150-foot-long 4.16 kV
transmission line connecting the lower powerhouse to the switchyard; and 7
appurtenant facilities.
The Pyrites Project is operated in a run-of-river mode with an average annual generation of 27,865 megawatthours.
o. In addition to publishing the full text of this notice in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this notice, as well as other documents in the proceeding e.g., license application via the internet through the Commissions Home Page http
www.ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket number field to access the document P6115.
At this time, the Commission has suspended access to the Commissions Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease COVID19 issued by the President on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, 866 2083676 or 202 502
8659 TTY.
You may also register online at https ferconline.ferc.gov/
FERCOnline.aspx to be notified via email of new filings and issuances related to this or other pending projects.
For assistance, contact FERC Online Support.
p. Procedural schedule and final amendments: The application will be processed according to the following preliminary schedule. Revisions to the schedule will be made as appropriate.
Milestone Issue Deficiency Letter if necessary.
Request Additional Information.
Issue Acceptance Letter ..
Issue Scoping Document 1 for comments.
Issue Scoping Document 2.
Issue Notice of Ready for Environmental Analysis.

Target date October 2021.
October 2021.
January 2022.
February 2022.
May 2022.
May 2022.

Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.
Dated: September 14, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202120272 Filed 91721; 8:45 am BILLING CODE 671701P

VerDate Sep<11>2014

16:49 Sep 17, 2021

Jkt 253001

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Project No. 3102000

Jason and Carol Victoria Presley;
Notice of Authorization for Continued Project Operation On September 12, 2017, Jason and Carol Victoria Presley, licensees for the High Shoals Hydroelectric Project No.
3102, filed a Notice of Intent to File Subsequent License Application for the project, and on November 1, 2017, they filed a Preliminary Application Document. On August 27, 2019, they filed a Notice of Intent to Surrender the project followed by an application for Surrender of License on November 7, 2019. The High Shoals Hydroelectric Project is located on the Apalachee River in Walton, Morgan, and Oconee Counties, Georgia.
The license for Project No. 3102 was issued for a period ending August 31, 2021. Section 15a1 of the FPA, 16
U.S.C. 808a1, requires the Commission, at the expiration of a license term, to issue from year-to-year an annual license to the then licensees under the terms and conditions of the prior license until a new license is issued, or the project is otherwise disposed of as provided in section 15 or any other applicable section of the FPA.
If the projects prior license waived the applicability of section 15 of the FPA, then, based on section 9b of the Administrative Procedure Act, 5 U.S.C.
558c, and as set forth at 18 CFR
16.21a, if the licensee of such project has filed an application for a subsequent license, the licensee may continue to operate the project in accordance with the terms and conditions of the license after the minor or minor part license expires, until the Commission acts on its application. If the licensee of such a project has not filed an application for a subsequent license, then it may be required, pursuant to 18 CFR 16.21b, to continue project operations until the Commission issues someone else a license for the project or otherwise orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that an annual license for Project No. 3102
is issued to Jason and Carol Victoria Presley for a period effective September 1, 2021 through August 31, 2022 or until the issuance of a new license for the project or other disposition under the FPA, whichever comes first. If issuance of a new license or other disposition does not take place on or before August 31, 2022, notice is hereby given that,
PO 00000

Frm 00020

Fmt 4703

Sfmt 4703

pursuant to 18 CFR 16.18c, an annual license under section 15a1 of the FPA is renewed automatically without further order or notice by the Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is hereby given that Jason and Carol Victoria Presley are authorized to continue operation of the High Shoals Hydroelectric Project, until such time as the Commission takes final action on the application for Surrender of License.
Dated: September 14, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202120275 Filed 91721; 8:45 am BILLING CODE 671701P

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Project No. 3509042

Little Falls Hydroelectric Associates, LP; Notice of Application Tendered for Filing With The Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 3509042.
c. Date Filed: August 31, 2021.
d. Applicant: Little Falls Hydroelectric Associates, LP.
e. Name of Project: Little Falls Hydroelectric Project Little Falls Project.
f. Location: The existing project is located on the Mohawk River, in the City of Little Falls, Herkimer County, New York. The project does not occupy federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 a825 r.
h. Applicant Contact: David H. Fox, Director, Licensing and Compliance, Little Falls Hydroelectric Associates, LP, Eagle Creek Renewable Energy, 7315
Wisconsin Avenue, Suite 1100W, Bethesda, MD 20814, emaildavid.fox@
eaglecreekre.com; Jody J. Smet, Vice President, Regulatory Affairs, Little Falls Hydroelectric Associates, LP, Eagle Creek Renewable Energy, 7315
Wisconsin Avenue, Suite 1100W, Bethesda, MD 20814, email jody.smet@eaglecreekre.com.

E:FRFM20SEN1.SGM

20SEN1

Acerca de esta edición

Federal Register - September 20, 2021

TítuloFederal Register

PaísEstados Unidos de América

Fecha20/09/2021

Nro. de páginas324

Nro. de ediciones7801

Primera edición14/03/1936

Ultima edición24/06/2026

Descargar esta edición

Otras ediciones

<<<Septiembre 2021>>>
DLMMJVS
1234
567891011
12131415161718
19202122232425
2627282930