Federal Register - September 20, 2021

Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.

Fuente: Federal Register

Federal Register / Vol. 86, No. 179 / Monday, September 20, 2021 / Notices DEPARTMENT OF ENERGY

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
Federal Energy Regulatory Commission Project No. 6115016

Docket No. AD218000

Technical Conference on Reassessment of the Electric Quarterly Report Requirements; Supplemental Notice of Technical Conference On August 12, 2021, the Federal Energy Regulatory Commission Commission issued a notice that its staff will hold a technical conference related to the reassessment of the Electric Quarterly Report EQR
requirements on October 14, 2021. The technical conference will take place from 10:00 a.m. to 12:30 p.m. Eastern Time. All interested persons are invited to participate. Access to the meeting will be available via WebEx.
Commission staff is hereby supplementing the August 12, 2021
notice with the agenda, including sample discussion topics. During the conference, Commission staff, EQR
filers, and EQR users will discuss potential changes to the current EQR
data fields. This technical conference is the third in a series of conferences related to the reassessment of the EQR
requirements.
Information for the technical conference, including a link to the webcast, will be posted prior to the event on the meeting event page on the Commissions website, available at:
https www.ferc.gov/news-events/
events/technical-conferencereassessment-electric-quarterly-reportrequirements-0. The presentation slides will be posted to the website prior to the conference. Any interested person that wishes to participate in the conference is required to register through the WebEx link.
Commission conferences are accessible under section 508 of the Rehabilitation Act of 1973. For accessibility accommodations, please send an email to accessibility@ferc.gov or call toll free 18662083372 voice or 2022081659 TTY.
For more information about the technical conference, please contact Jeff Sanders of the Commissions Office of Enforcement at 202 5026455, or send an email to EQR@ferc.gov.
Dated: September 14, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202120270 Filed 91721; 8:45 am BILLING CODE 671701P

VerDate Sep<11>2014

16:49 Sep 17, 2021

Jkt 253001

Pyrites Hydro, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 6115016.
c. Date Filed: August 31, 2021.
d. Applicant: Pyrites Hydro, LLC.
e. Name of Project: Pyrites Hydroelectric Project Pyrites Project.
f. Location: The existing project is located on the Grass River near the Town of Canton, St. Lawrence County, New York. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 a825 r.
h. Applicant Contact: Mr. Kevin M.
Webb, Hydro Licensing Manager, Pyrites Hydro, LLC, 670 N. Commercial Street, Suite 204, Manchester, NH
03101, 978 9356039; emailkwebb@
centralriverspower.com.
i. FERC Contact: Christopher Millard at 202 5028256; or email at christopher.millard@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commissions policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See, 94
FERC 61,076 2001.
k. Pursuant to section 4.32b7 of 18
CFR of the Commissions regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant.

PO 00000

Frm 00019

Fmt 4703

Sfmt 4703

52141

l. Deadline for filing additional study requests and requests for cooperating agency status: October 30, 2021.1
The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commissions eFiling system at https
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at FERCOnlineSupport@ferc.gov, 866
2083676 toll free, or 202 5028659
TTY. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page:
Pyrites Hydroelectric Project P6115
016.
m. The application is not ready for environmental analysis at this time.
n. Project Description: The existing Pyrites Project consists of: 1 A 170foot-long and 12-foot-high concrete Ambursen overflow spillway with 1.5foot-high flashboards, a 115-foot-long concrete auxiliary spillway, and a 208foot-long non-overflow dam, which includes a 50-foot-wide intake structure;
2 a 6-foot-diameter, 700-foot-long steel penstock running from the intake structure to an upper powerhouse and a 10-foot-diameter, 2,160-foot-long penstock running from the intake structure to a lower powerhouse; 3 a 21-foot by 31-foot upper powerhouse located 700 feet downstream of the intake structure containing one 1.2megawatt MW turbine/generator unit operating under a rated head of 76 feet and a 50-foot by 53-foot lower powerhouse located 1,200 feet downstream of the tailrace containing two 3.5-MW turbine/generator units operating under a rated head of 111 feet;
4 a 50-foot by 97-foot 115/4.16/2.3kilovolt kV switchyard and substation for use by both powerhouses; 5 a 470foot-long 2.3-kV transmission line connecting the upper powerhouse to the 1 The Commissions Rules of Practice and Procedure provide that if a filing deadline falls on a Saturday, Sunday, holiday, or other day when the Commission is closed for business, the filing deadline does not end until the close of business on the next business day. 18 CFR 385.2007a2
2020. Because the 60-day filing deadline falls on a Saturday i.e., October 30, 2021, the filing deadline is extended until the close of business on Monday, November 1, 2021.

E:FRFM20SEN1.SGM

20SEN1

Acerca de esta edición

Federal Register - September 20, 2021

TítuloFederal Register

PaísEstados Unidos de América

Fecha20/09/2021

Nro. de páginas324

Nro. de ediciones7801

Primera edición14/03/1936

Ultima edición24/06/2026

Descargar esta edición

Otras ediciones

<<<Septiembre 2021>>>
DLMMJVS
1234
567891011
12131415161718
19202122232425
2627282930