Federal Register - September 7, 2021
Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.
Fuente: Federal Register
Federal Register / Vol. 86, No. 170 / Tuesday, September 7, 2021 / Notices
50195
LICENSE AMENDMENT REQUESTSContinued Location in Application of NSHC
Brief Description of Amendments
Proposed Determination
Name of Attorney for Licensee, Mailing Address NRC Project Manager, Telephone Number
Page 15 of Attachment 1; Section 4.3.
This submittal requests changes to the Peach Bottom Atomic Power Station, Units 2 and 3, technical specification Administrative Controls Section 5.5.7, Ventilation Filter Testing Program VFTP, to change the frequency for performing certain testing requirements from 12
months as currently specified to 24 months. The VFTP establishes the required testing and testing frequency of Engineered Safety Feature filter ventilation systems.
NSHC.
Tamra Domeyer, Associate General Counsel, Exelon Generation Company, LLC, 4300 Winfield Road, Warrenville, IL 60555.
Jason Paige, 3014151474.
NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Linn County, IA
Docket Nos
Application date
ADAMS Accession No
Location in Application of NSHC
Brief Description of Amendments
Proposed Determination
Name of Attorney for Licensee, Mailing Address NRC Project Manager, Telephone Number
50331.
June 28, 2021.
ML21179A286.
Pages 1314 of the Enclosure.
The proposed amendment would revise the Duane Arnold Emergency Plan and associated Emergency Action Level scheme to implement an Independent Spent Fuel Storage Installation ISFSI Only Emergency Plan that will reflect the movement of all spent fuel into dry storage within the onsite ISFSI. The proposed license amendment would not be implemented until after the licensee provides notification to the U.S. Nuclear Regulatory Commission that all spent nuclear fuel has been transferred out of the spent fuel pool and placed within the ISFSI, which is expected to occur in 2022.
NSHC.
Steven Hamrick, Managing AttorneyNuclear, Florida Power and Light Company, P.O. Box 14000, Juno Beach, FL 334080420.
Marlayna Doell, 3014153178.
NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Linn County, IA
Docket Nos
Application date
ADAMS Accession No
Location in Application of NSHC
Brief Description of Amendments
Proposed Determination
Name of Attorney for Licensee, Mailing Address NRC Project Manager, Telephone Number
50331.
June 3, 2021.
ML21167A186.
Pages 45 of Enclosure 1.
The proposed amendment would revise the Duane Arnold Independent Spent Fuel Storage Installation ISFSI Physical Security Plan, as well as implement a proposed revision to the existing physical security license condition in the renewed facility operating license. The updated Physical Security Plan will relate solely to the Duane Arnold ISFSI once all spent fuel has been moved to dry storage, and would not be implemented until after the licensee provides notification to the U.S. Nuclear Regulatory Commission that all spent nuclear fuel has been transferred out of the spent fuel pool and placed within the ISFSI, which is expected to occur in 2022.
NSHC.
Steven Hamrick, Managing AttorneyNuclear, Florida Power and Light Company, P.O. Box 14000, Juno Beach, FL 334080420.
Marlayna Doell, 3014153178.
Vistra Operations Company LLC; Comanche Peak Nuclear Power Plant, Units 1 and 2; Somervell County, TX
Docket Nos
Application date
ADAMS Accession No
Location in Application of NSHC
Brief Description of Amendments
Proposed Determination
Name of Attorney for Licensee, Mailing Address
sradovich on DSKJLST7X2PROD with NOTICES
NRC Project Manager, Telephone Number
III. Notice of Issuance of Amendments to Facility Operating Licenses and Combined Licenses During the period since publication of the last monthly notice, the Commission
VerDate Sep<11>2014
00:30 Sep 04, 2021
Jkt 253001
50445, 50446.
May 11, 2021, as supplemented by letters dated July 13, 2021.
ML21131A233, ML21194A078.
Pages 1416 of Attachment 1 of the Supplement.
The amendments would adopt Technical Specifications Task Force TSTF Traveler TSTF
505, Revision 2, Provide Risk-Informed Extended Completion TimesRITSTF Risk-Informed TSTF Initiative 4b, and would remove certain historical information. The amendments would modify the technical specification TS requirements related to Completion Times for Required Actions to provide the option to calculate a longer, risk-informed Completion Time. The allowance is described in a new program in TS Section 5.0, Administrative Controls, entitled the Risk Informed Completion Time Program.
NSHC.
Timothy P. Matthews, Esq., Morgan, Lewis and Bockius, 1111 Pennsylvania Avenue NW, Washington, DC 20004.
Dennis Galvin, 3014156256.
has issued the following amendments.
The Commission has determined for each of these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended the Act, and
PO 00000
Frm 00184
Fmt 4703
Sfmt 4703
U:07SEN1.SGM
the Commissions rules and regulations.
The Commission has made appropriate findings as required by the Act and the Commissions rules and regulations in 10 CFR chapter I, which are set forth in the license amendment.
07SEN1