Federal Register - October 26, 1944
Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.
Fuente: Federal Register
FEDERAL REGISTER, Thursday, October 26, 1944
12833
the cost of which proved to be over $1,400.
P art 1010S uspension O rders Alkyd resins are subject to allocation On or about September 28, 1943, he be under General Allocation Order M-300 as Suspension Order S-360, Revocation gan construction of an addition to an Appendix A materials, subject to Sched GUARDIAN STEEL CORP.
industrial plant with a productive floor ule 59 issued simultaneously with this Suspension Order No.
S-360
was issued .area of less than 10,000 feet, the cost of revocation.
against the Guardian Steel Corporation Prior to November 1,1944, alkyd resins which proved to be $566. On or about October 11, 1943, he began construction at 11675 East Eight Mile Road, Detroit, may be delivered, accepted and used in Michigan, which is engaged in the busi accordance with authorizations issued of an addition to an industrial plant with a productive area of less than ness of maintaining and operating a steel under Order M-139 revoked.
10,000 feet, at an estimated cost of be warehouse at that address. The re Issued this 25th day of October 1944.
tween $1,200 and $1,300; the actual cost spondent appealed from the provisions of the Suspension Order and a new hear W ar P roduction B oard, proved to be $1,800. The first, second, B y J. J oseph W helan, fourth and fifth jobs exceeded the $200 ing was granted by the Deputy Chief Recording Secretary.
limit provided by Conservation Order Compliance Commissioner on August 21, 1943. There was a hearing before Com L-41 for such construction, and the third F. R. Doc. 44-16402; Filed, Oct. 25, 1944;
pliance Commissioner John B.
Waite on job the barn exceeded the $1,000 limit October 22,1943, and on October 29,1943
11:12 a. m.
provided by Conservation Order L-41 for such construction, without authorization the case was closed by Commissioner P art 3175R egulations Applicable to from the War Production Board. Mr. Waite.
The Deputy Chief Compliance Com the Controlled M aterials P lan Gaultney was aware of WPB restrictions missioner directed that the Suspen on construction and carrying on this sion Orderhas CMP
Reg. 1, Interpretation 25 as Amended be revoked as of October 29, Oct. 25, 1944
construction without authorization con 1943.
stituted grossly negligent violations of ALLOTMENT SYMBOLS THAT DO NOT REQUIRE
In view of the foregoing?
Order L-41.
QUARTERLY IDENTIFICATION
It is hereby ordered, That! 1010.360
These violations have diverted critical Order No. S-360 be. revoked The following interpretation is issued materials to uses not authorized by the Suspension with respect to CMP Regulation 1:
War Production Board and have ham retroactive to October 29, 1943.
Issued this 24th day of October 1944.
pered and impeded the war effort of the Paragraph s of CMP Regulation No. 1
explains that in placing an authorized con United States. In view of the foregoing, W ar P roduction B oard,.
trolled material order the quarterly identifi it is hereby ordered, that:
By J. J oseph W helan, cation which is explained in paragraph Recording Secretary.
1010.642 Suspension Order No. S-642.
c 6 i , must be added. In certain cases, a Deliveries of material to Charles F. R. Doc. 44-16388; Filed, Oct. 24, 1944; where allotments are not made, a consumer is entitled to place an authorized controlled Gaultney shall not be accorded priority 4:29 p. m.
material order without using the quarterly over deliveries under any other contract identification. Howeve, in such a case, the or order and no preference rating shall order must still bear tne requested delivery P art 1204P hthalic A lkyd R esins be assigned, applied or extended to such date. A list of the symbols which can be General Preference Order M-139, deliveries by means of preference rating used to place an authorized controlled ma Revocation certificates, preference rating orders, terial order without the quarterly identifica general preference orders or any other Section 1204.1 General Preference tion, the purpose for which such symbols are orders or regulations of the War Produc Order M-139 is hereby revoked. This used, and the related order follows:
tion Board, unless hereafter specifically revocation does not affect any liabilities Note: MRO-P-89 added Oct.
authorized in writing by the War Pro incurred under the order.
25, 1944; S-8 amended Oct. 25, 1944.
duction Board.
b No allocation, including allot Order Use Symbol ments, shall be made to Charles Gaultney of any material or product, the supply SO
CMP Regulation 1.
P-98-b.
or distribution of which is governed by P-rl P-98-b.
F-5
any order or regulation of the War Pro MRO
Maintenance, repair and operating supplies_________ CMP Regulations 5 and 5A.
duction Board, unless hereafter specifi MRO-P-3
P-98-b.
Industry MRO Serial number MainteP-47.
cally authorized in writing by the War MR0-P-47 Petroleum nance, repair and operating suppliescivilian aircraft.
Production Board.
MRO-P-89 Maintenance, repair and operating supplieschemicals.. P-89.
repair and operating suppliespetroleum P-98-e.
> c No authorization to commence MRO-P-98-e Maintenance, industry consumer accounts.
construction under the provisions of Or MRO-P-133____ Maintenance, repair and operating supplieselectronic P-133.
equipment.
der L-41, shall be granted to Charles Maintenance, repair and operating suppliesscrap yards P-130.
MRO-P-136____
Gaultney, unless hereafter specifically serialized.
authorized in writing by the War Pro MRO-P-141___ Maintenance, repair and operating suppliespublic P-141.
sanitary sewer facilities.
duction Board.
CMP Regulation 9A.
S-l P-141.
d The restrictions and prohibitions S-2
P-68.
S-8
contained herein shall apply to Charles T-7
Serial number Transportation systems P-142.
.
Gaultney, his successors and assigns or V-9
P-43.
P-148.
S-4
persons acting on his behalf. Prohibi U-9
U-l, U-3, U-4.
tions against the taking of any action in V-3
CMP Regulations 9 and 9A.
CMPftegulation 6, Direction 1.
clude the taking indirectly as well as di F-6
CMP Regulation 6, Direction 3
W-6
rectly of any such action.
CMPL-593.
CMP Regulation 6, Direction 3
e Nothing contained in this order N-0
CMPL-593.
shall be deemed to relieve Charles H-Program No.. Construction and facilitieshousing P-55-c WPB-2896.
Gaultney, his successors or assigns, from U-2 1
CMP Regulation 6, Direction 4
WPB-2774.
any restriction, prohibition or provision WH
M-21-b-l and M-21-b-2.
contained in any other order or regula PX
CMP Regulation 1, Direction 6.
Direction 49 to CMP Regulation 1
tion of the War Production Board, ex AM. .
and M-l-g.
cept insofar as the same my be incon E -2
Direction 53 to CMP Regulation 1.
sistent with the provisions hereof.
E-4 Discarded, offgrade, idle,and excess steel purchases
f This order shall take effect on Oc i In some cases a quarterly limitation is placed on the operator who places the order. However, a controlled material tober 24, 1944, and shall expire on Jan supplier does not need to require a quarterly designation on any order bearing the symbol F-5.
uary 24, 1945.
In some cases the WPB-2774 authorization gives specific quantities for specific quarters. A controlled materials supplier does not need to require quarterly designation on any qrder bearing the symbol U-2.
Issued this 14th day of October 1944.
Issued this 25th day of October 1944.
W ar P roduction B oard, B y J. J oseph W helan,
Recording Secretary.
F. R. Doc. 44-16386; Filed, Oct. 24, 1944, 4:29 p. m.
W ar P roduction B oard,
/
By J. J oseph W helan, Recording Secretary.
F. R. Doc. 44-16400; Filed, Oct. 25, 1944; 11:12 a. m.