Federal Register - June 23, 1943

Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.

Fuente: Federal Register

REGISTER

EDERAL
1934 y
VOLUME 8

NUMBER 123

iflV lT E O

,
,
Washington Wednesday June 23, 1943
The President EXECUTIVE ORDER 9353
Disposal op E lectric E nergy G enerated at the N orfork P roject
WHEREAS the Norfork Project on the North Pork River in the White River Basin in the States of Arkansas and Missouri, being constructed by the U. S.
Corps of Engineers for the purpose of flood control, the improvement of navi gation, and the development of hydro electric power as an incident thereto, is now nearing completion; and WHEREAS the electric energy to be generated at the Norfork Project can best be utilized in the prosecution of the war by transmission, distribution, and utilization in coordination with the elec tric energy generated at the Pensacola Project on the Grand River in Okla homa, and by the full use of the trans mission, distribution, marketing, and other facilities now being operated in this area by the Federal Works Adminis trator hereinafter called the Adminis trator pursuant to Executive Order No.
8944, dated November 19, 1941:1
NOW, THEREFORE, by virtue of the authority vested in me by the Constitu tion and the statutes of the United States, particularly by Title I of the First War Powers Act, 1941 55 Stat. 838, and by Title m of the Second War Powers Act, 1942 56 Stat. 176, and as Commander in Chief of the Army and Navy and as President of the United States, it is hereby ordered as follows:
1. The Norfork Project including facilities for the generation of electric energy shall be completed, maintained, and operated under the direction of the Secretary of War and the supervision of the Chief of Engineers, subject to the provisions of the Flood Control Act, approved June 30,1938, as amended, and this order.
2. The Secretary of War shall a pro vide and maintain, for the use of the Administrator at the Norfork Project, adequate station space and equipment, including such switches, switchboards, instruments, and dispatching facilities 6 P.R. 5947.

as may be required by the Ad ministrator for proper reception, han dling, and dispatching of the electric energy generated at the said Project, together with transformers and other equipment required by the Administra tor for the transmission of such energy from that place at suitable voltage to the markets which the Administrator desires to serve; b deliver to the Ad ministrator the electric energy gener ated at the Norfork Project and not required for the operation thereof; and c schedule the operations of the elec tric generating unit or units and appur tenant equipment of the Norfork Project in accordance with the require ments of the Administrator, so far as those requirements are consistent with requirements for the storage or dis charge of water for flood-control and other purposes.
3. The Administrator, acting for and on behalf of the United States through such person or persons as he may desig nate, is hereby authorized and directed a to sell and dispose of the electric energy generated at the Norfork Proj ect, in coordination with the electric energy génerated at the Pensacola Project, to war plants and establish ments, public bodies and cooperatives, and other persons, in that order of pref erence, at such rates as may be approved by the Federal Power Commission; and b to make such arrangements as he deems necessary to interconnect the Norfork Project with other utility sys tems in the area, and. interchange elec tric energy with and purchase electric energy from such systems.
4. Having become satisfied that the fulfillment of requirements for the de fense of the United States will result in a shortage in the supply of copper and other materials and facilities for the transmission and distribution of elec tric energy required for the prosecution of the war, I hereby further authorize and direct the Administrator to allocate transmission and distribution lines and appurtenant facilities in the area for the purposes of transmitting and distributing electric energy generated at the Norfork and Pensacola Projects to such extent as, in the judgment of the Administrator, will not substantially interfere with the Continued on next page
CONTENTS
THE PRESIDENT
E xecutive Order:

Pase
Norfork project, disposal of electric energy generated 8587
REGULATIONS AND NOTICES
B oard op E conomic W arfare:

General licenses, shipments val ued at $25 or less_________
Individual l i c e n s e s , appli cations_________________
Prohibited exportations_______

8594
8595
8595

Customs B ureau:

Airports of entry, redesigna tion____________________ .8592
F arm S ecurity A dministration :

Clark County, Wis., designation of localities for tenant pur chase loans______________

8617

F ederal T rade Commission :

Cease and desist orders:
Almas Home Made Candies.
Latta Cream______________
Magnetic Ray Co., etc-----------

8592
8591
8590

I nterstate Commerce Commission:

Car service, bituminous coal St. Louis Southwestern Railway Co. or Baltimore and Ohio Railroad Co., reicing of po tatoes in transit__________

8616

8617

O ffice of D efense T ransportation:

Motor equipment conservation, retail deliveries of property sold from motor trucks Gen. Permit ODT 17-24. 8617
Rail equipment conservation, electric passenger train op erations Gen. Permit ODT
24-7____________ - _____ 8616
Office of P rice Administration :

Adjustments, exceptions, etc.:
Cambridge Machine and Valve, Inc_____________
Vegetable canners__________
Vest, T. O________________
Alaska MPR 194, Am. 11----Brass mill products and services, distributors prices MPR
408__________________
Carrier services SR 15, Am. 6 .
Food rationing, institutional us ers Gen. RO 5, Am. 30
Lumber, aircraft Rev. MPR
109____________________
Continued on next page
8587

8615
8617
8614
8615
8601
8614
8614
8614

Acerca de esta edición

Federal Register - June 23, 1943

TítuloFederal Register

PaísEstados Unidos de América

Fecha23/06/1943

Nro. de páginas36

Nro. de ediciones7771

Primera edición14/03/1936

Ultima edición11/05/2026

Descargar esta edición

Otras ediciones

<<<Junio 1943>>>
DLMMJVS
12345
6789101112
13141516171819
20212223242526
27282930