Federal Register - September 10, 2021
Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.
Source: Federal Register
50652
Federal Register / Vol. 86, No. 173 / Friday, September 10, 2021 / Rules and Regulations TABLE 2WASTES EXCLUDED FROM SPECIFIC SOURCESContinued Facility
Address
Waste description
jbell on DSKJLSW7X2PROD with RULES
B A sampling and analysis plan with supporting systematic planning documentation e.g., Data Quality Objectives and with an associated Quality Assurance Project Plan, for all sampling and analysis specific to the demonstration testing. A minimum of four independent sample sets over the course of the demonstration test are required from both the influent to the 200 Area ETF and the effluent to the verification tanks;
C A schedule for conducting the demonstration testing. The demonstration testing schedule may be based on functional criteria in addition to or in lieu of fixed calendar dates. The testing schedule may contain contingencies for revising the test plan should additional testing be required to obtain the required performance data points.
Energy may not commence demonstration testing until written interim approval is obtained from the Regional Administrator. The effect of interim approval shall be limited to relief from the requirement of operating within the treatability envelope specified in Tables C1
and C2 of the November 29, 2001 delisting petition, as amended, during the period of demonstration testing. Interim approval shall remain in effect only for the duration of the demonstration testing as documented in the required testing schedule. Within 60 days following completion of demonstration testing, or such other time as may be approved in writing by the EPA, Energy shall submit a written completion report documenting analysis of data gathered during the demonstration test. Energy may request an extension of interim approval for the period of time between completion of the demonstration testing and final approval of the modified treatability envelope. The EPA may approve amendments to the demonstration test plan, including the associated schedule, as necessary to successfully complete demonstration testing. The EPAs written approval of the completion report shall be considered approval of the modified treatability envelope pursuant to Condition 1b.
e
iv Key unit operations are defined as filtration, UV/OX, reverse osmosis, ion exchange, steam stripping, and secondary waste treatment.
5
Dichloroisopropyl ether6.0 102
Aroclor total of Aroclors 1016, 1221, 1232, 1242, 1248, 1254, 12605.0 104
6
c Records required by Condition 6a must be furnished on request by EPA or the State of Washington and made available for inspection. All data must be accompanied by a signed copy of the following certification statement to attest to the truth and accuracy of the data submitted:
Under civil and criminal penalty of law for the making or submission of false or fraudulent statements or representations pursuant to the applicable provisions of the Federal Code, which include, but may not be limited to, 18 U.S.C. 1001 and 42 U.S.C. 6928. I certify that the information contained in or accompanying this document is true, accurate, and complete.
As to the those identified sections of the document for which I cannot personally verify its their truth and accuracy, I certify as the official having supervisory responsibility of the persons who, acting under my direct instructions, made the verification that this information is true, accurate, and complete.
In the event that any of this information is determined by EPA in its sole discretion to be false, inaccurate, or incomplete, and upon conveyance of this fact to Energy, I recognize and agree that this exclusion of waste will be void as if it never had effect to the extent directed by EPA and that Energy will be liable for Energys reliance on the voided exclusion.
VerDate Sep<11>2014
21:14 Sep 09, 2021
Jkt 253001
PO 00000
Frm 00050
Fmt 4700
Sfmt 4700
E:FRFM10SER1.SGM
10SER1