Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.

Source: Federal Register

50382

Federal Register / Vol. 86, No. 171 / Wednesday, September 8, 2021 / Notices
2.3.07.07b.ii 403, and 3.3.00.02a.ii.f 769.
The ITAAC for VEGP Unit 3 are in Appendix C of the VEGP Unit 3
combined license ADAMS Accession No. ML14100A106. The ITAAC for VEGP Unit 4 are in Appendix C of VEGP
Unit 4 combined license ADAMS
Accession No. ML14100A135.

jbell on DSKJLSW7X2PROD with NOTICES

II. Licensee ITAAC Post-Closure Notifications IPCNs Since the last Federal Register notice of the NRC staffs determinations of successful completion of inspections, tests, and analyses for VEGP Units 3 and 4 86 FR 23756; May 4, 2021, the NRC
staff has not made additional determinations of the successful completion of inspections, tests, and analyses based on licensee IPCNs submitted under 10 CFR 52.99c2.
III. NRC Staff Determination of Completion of ITAAC
The NRC staff has determined that the specified inspections, tests, and analyses have been successfully completed, and that the specified acceptance criteria are met. The documentation of the NRC staffs determination is in the ITAAC Closure Verification Evaluation Form VEF for each ITAAC. The VEF is a form that represents the NRC staffs structured process for reviewing ICNs and IPCNs.
Each ICN presents a narrative description of how the ITAAC was completed. The NRCs ICN review process involves a determination on whether, among other things: 1 Each ICN provides sufficient information, including a summary of the methodology used to perform the ITAAC, to demonstrate that the inspections, tests, and analyses have been successfully completed; 2 each ICN provides sufficient information to demonstrate that the acceptance criteria of the ITAAC are met; and 3 any NRC
inspections for the ITAAC have been completed and any ITAAC findings associated with that ITAAC have been closed. The NRCs review process for IPCNs is similar to that for ICNs but focuses on how the licensee addressed the new, material information giving rise to the IPCN.
The NRC staffs determination of the successful completion of these ITAAC is based on information available at this time and is subject to the licensees ability to maintain the condition that the acceptance criteria are met. If the NRC staff receives new information that suggests the NRC staffs determination on any of these ITAAC is incorrect, then the NRC staff will determine whether to reopen that ITAAC including
VerDate Sep<11>2014

17:21 Sep 07, 2021

Jkt 253001

withdrawing the NRC staffs determination on that ITAAC. The NRC
staffs determination will be used to support a subsequent finding, pursuant to 10 CFR 52.103g, at the end of construction that all acceptance criteria in the combined license are met. The ITAAC closure process is not finalized for these ITAAC until the NRC makes an affirmative finding under 10 CFR
52.103g. Any future updates to the status of these ITAAC can be found by selecting the link ITAAC Status Report on the NRCs websites: https
www.nrc.gov/reactors/new-reactors/colholder/vog3.html and https
www.nrc.gov/reactors/new-reactors/colholder/vog4.html.
This notice fulfills the NRC staffs obligations under 10 CFR 52.99e1 to publish a notice in the Federal Register of the NRC staffs determination of the successful completion of inspections, tests, and analyses.
Note: As of August 12, 2021, NRC staff rescinds its previous determination of the successful completion of ITAAC 2.5.05.03b 570 for both VEGP Units 3 and 4 due to the subsequent determination by NRC staff that this ITAAC is not met for both units. The NRCs prior determination of the successful completion of ITAAC 2.5.05.03b 570 was originally published in the Federal Register 85 FR 67017 on October 21, 2020. The licensee will resubmit the ICNs related to ITAAC 2.5.05.03b 570 for both Units.

Vogtle Electric Generating Plant Unit 3, Docket No. 5200025
A complete list of the review status for VEGP Unit 3 ITAAC, including the submission date and ADAMS accession number for each ICN received, the ADAMS accession number for each VEF, and the ADAMS accession numbers for the inspection reports associated with these specific ITAAC
can be found by selecting the link ITAAC Status Report at the NRCs website https www.nrc.gov/reactors/
new-reactors/col-holder/vog3.html.
Vogtle Electric Generating Plant Unit 4, Docket No. 5200026
A complete list of the review status for VEGP Unit 4 ITAAC, including the submission date and ADAMS accession number for each ICN and IPCN received, the ADAMS accession number for each VEF, and the ADAMS accession numbers for the inspection reports associated with these specific ITAAC, can be found by selecting the link ITAAC Status Report at the NRCs website https www.nrc.gov/reactors/
new-reactors/col-holder/vog4.html.
Dated: September 1, 2021.

PO 00000

Frm 00060

Fmt 4703

Sfmt 4703

For the Nuclear Regulatory Commission.
Philip J. McKenna, Acting Chief, Vogtle Project Office, Office of Nuclear Reactor Regulation.
FR Doc. 202119306 Filed 9721; 8:45 am BILLING CODE 759001P

OFFICE OF PERSONNEL
MANAGEMENT
Federal Employees Group Life Insurance Program; Premium Office of Personnel Management.
ACTION: Notice.
AGENCY:

The Office of Personnel Management OPM is announcing changes in premium rates for certain Federal Employees Group Life Insurance FEGLI categories. These include changes to premium rates for Employee Basic Insurance, Option A
most age bands, Option B most age bands, Option C most age bands, and Post-Retirement Basic Insurance. These rates will be effective the first pay period beginning on or after October 1, 2021.
DATES: These rates will be effective the first pay period beginning on or after October 1, 2021.
FOR FURTHER INFORMATION CONTACT:
Marthine Mason-Martin, FEGLI@
opm.gov, 202 6061413.
SUPPLEMENTARY INFORMATION: This notice announces changes to FEGLI
Employee Basic, Option A most age bands, Option B most age bands, Option C most age bands, and PostRetirement Basic Insurance.
FEGLI premium rates are assessed based on Program experience in accordance with FEGLI statutes at 8711b, 8714ae, 8714be, and 8714ce, and OPMs Annual FEGLI Rate Review Process. The premium rates in the FEGLI program represent estimates of premium income necessary to pay future expected benefits costs. The rates for all coverage categories are specific to the experience of the FEGLI group and are not based on mortality rates within the general population. Actuarial analysis of changing mortality rates makes periodic premium adjustments necessary.
OPM has completed a study of funding and claims experience within the FEGLI Program. Based on this updated actuarial analysis of actual claims experience, OPM has determined that changes are required to Employee Basic, Option A, Option B, Option C
and Post-Retirement Basic Insurance premiums. These changes reflect SUMMARY:

E:FRFM08SEN1.SGM

08SEN1

Riguardo a questa edizione

Federal Register - September 8, 2021

TitoloFederal Register

PaeseStati Uniti

Data08/09/2021

Conteggio pagine229

Numero di edizioni7797

Prima edizione14/03/1936

Ultima edizione17/06/2026

Scarica questa edizione

Altre edizioni

<<<Septiembre 2021>>>
DLMMJVS
1234
567891011
12131415161718
19202122232425
2627282930