Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.
Source: Federal Register
45965
Federal Register / Vol. 86, No. 156 / Tuesday, August 17, 2021 / Notices expiration. As required, the applicant also provided a preliminary monitoring report available at https
www.fisheries.noaa.gov/action/
incidental-take-authorization-servicepier-extension-project-naval-basekitsap-bangor which confirms that the applicant has implemented the required mitigation and monitoring, and which also shows that no impacts of a scale or nature not previously analyzed or authorized have occurred as a result of the activities conducted. The notice of
the proposed renewal IHA was published on July 19, 2021 86 FR
38025 for a 15-day public comment period in the Federal Register.
Description of the Specified Activities and Anticipated Impacts The Navy plans to continue its construction activities at Naval Base Kitsap Bangor. The remaining construction activities involve the installation of 103 18-inch square concrete fender piles by impact pile
driving over a 35-day period during a specified in-water work window July 16 through January 15 due to the presence of Endangered Species Act ESA-listed juvenile salmonids are likely to be present in the area FebruaryJuly; USACE, 2015. The activities left for the Service Pier Extension Project are shown in Table 1.
Please see the notice of proposed renewal IHA 86 FR 38025; July 19, 2021 for additional details.
TABLE 1CONSTRUCTION ACTIVITIES COMPLETED BY THE EXPIRATION OF THE 2020 MODIFIED IHA AND REMAINING
2018 and 2020 IHAs
SPE project feature
Pile removal from existing wave screen and pier.
Temporary Falsework.
Renewal IHA
Pile type
Pile installation and/
or extraction method
Total numbers of piles initially analyzed
Total number of piles completed 2
Subset of piles remaining
Number of pile driving days for the 2021
2022
construction period
15-inch 38 cm to 18-inch 45 cm creosote-treated timber.
36-inch steel 30 cm
Vibratory
36
22 18-inch only
0
0
Vibratory installation and removal with potential proofing.
Vibratory with proofing.
Vibratory with proofing.
Impact
27
0
0
0
50
11
0
0
203
176
0
0
103
0
103
35
419
209 1
103
35
Small craft mooring and dolphins.
Pier and wave screen attachment.
Fender piles
24-inch steel 60 cm
Total
36-inch steel 90 cm 18-in concrete 45
cm.
1 Some
khammond on DSKJM1Z7X2PROD with NOTICES
of these piles were installed and some were removed per the specific project activity. Some of the total piles were temporarily installed and subsequently removed after installation. A total of 209 piles were utilized in construction activities during 20202021, in which 187 piles were installed, 22 piles were removed, and 0 piles were installed temporarily and then subsequently removed.
2 Per the Navys submitted Monitoring Report, not all piles for which take was originally authorized were installed or removed per the recommendations by the Navys project engineers.
The following documents are referenced in this notice and include important supporting information:
Initial proposed 2018 IHA 83 FR
10689; March 12, 2018;
Initial final 2018 IHA 83 FR 30406;
June 28, 2018;
Modified proposed 2020 IHA 85
FR 74989; November 24, 2020;
Modified final 2020 IHA 85 FR
86538; December 30, 202;
Renewal proposed IHA 86 FR
38025; July 19, 2021;
Appendix A and D of the original and renewal IHA applications available at https www.fisheries.noaa.gov/
action/incidental-take-authorizationservice-pier-extension-project-navalbase-kitsap-bangor;
The preliminary monitoring report included with the renewal IHA
application available at https
www.fisheries.noaa.gov/action/
incidental-take-authorization-service-
VerDate Sep<11>2014
17:08 Aug 16, 2021
Jkt 253001
pier-extension-project-naval-basekitsap-bangor;
References cited available at https www.fisheries.noaa.gov/action/
incidental-take-authorization-servicepier-extension-project-naval-basekitsap-bangor; and Previous public comments received available at https www.fisheries.
noaa.gov/action/incidental-takeauthorization-service-pier-extensionproject-naval-base-kitsap-bangor.
The anticipated impacts, which include both Level A and Level B
harassment of marine mammals by impact pile driving, are identical to those analyzed and authorized in the initial 2018 IHA 83 FR 30406; June 28, 2018 and modified 2020 IHA 85 FR
86538; December 30, 2020. Similar to the last projects at Naval Base Kitsap Bangor, the species with the expected potential to be present during all or a portion of the in-water work window
PO 00000
Frm 00014
Fmt 4703
Sfmt 4703
include the killer whale, the harbor porpoise, the California sea lion, the Steller sea lion, and the harbor seal.
However, as the work for which take would be authorized under this renewal IHA represents a subset of the overall activities originally planned and discussed in the initial 2018 IHA 83 FR
30406; June 28, 2018 and modified 2020 IHA 85 FR 86538; December 30, 2020, NMFS plans to authorize only a subset of Level A and Level B
harassment takes compared to those takes previously authorized under the modified 2020 IHA 85 FR 86538;
December 30, 2020.
The anticipated impacts are identical to those described in the 2018 IHA 83
FR 30406; June 28, 2018 and modified 2020 IHA 85 FR 86538; December 30, 2020. However, NMFS anticipates that only pinniped species harbor seals, California sea lions, Steller sea lions are likely to be taken incidental to the
E:FRFM17AUN1.SGM