Federal Register - August 12, 2021

Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.

Source: Federal Register

44355

Federal Register / Vol. 86, No. 153 / Thursday, August 12, 2021 / Notices Comments Due: 5 p.m. ET 8/27/21.
The filings are accessible in the Commissions eLibrary system https
elibrary.ferc.gov/idmws/search/
fercgensearch.asp by querying the docket number.
Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211
and 214 of the Commissions Regulations 18 CFR 385.211 and 385.214 on or before 5:00 p.m. Eastern time on the specified comment date.
Protests may be considered, but intervention is necessary to become a party to the proceeding.
eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: http www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For other information, call 866 2083676
toll free. For TTY, call 202 5028659.
Dated: August 6, 2021.
Debbie-Anne A. Reese, Deputy Secretary.
FR Doc. 202117209 Filed 81121; 8:45 am BILLING CODE 671701P

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Project No. 3133033

lotter on DSK11XQN23PROD with NOTICES1

Brookfield White Pine Hydro, LLC;
Errol Hydro Co., LLC; Notice of Application Tendered for Filing With The Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 3133033.
c. Date Filed: July 30, 2021.
d. Applicant: Brookfield White Pine Hydro, LLC and Errol Hydroelectric Co., LLC licensees.
e. Name of Project: Errol Hydroelectric Project Errol Project.
f. Location: The Errol Project is located on the Androscoggin River and Umbagog Lake, near the Town of Errol, and Township of Cambridge, NH, in Coos Wing County, New Hampshire and the Towns of Magalloway Plantation and Upton in Oxford County, Maine.
The project occupies 3,285 acres federal land in the Umbagog National Wildlife Refuge administered by the U.S. Fish and Wildlife Service.

VerDate Sep<11>2014

20:11 Aug 11, 2021

Jkt 253001

g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 a825r.
h. Applicant Contact: Mr. Tom Uncher, Vice President, Brookfield White Pine Hydro, LLC, Errol Hydroelectric Co., LLC, 339B Big Bay Rd., Queensbury, NY 12804 Phone at:
518 7432018 Thomas.Uncher@
brookfieldrenewable.com.
i. FERC Contact: Kelly Wolcott at 202 5026480 or email at kelly.wolcott@ferc.gov.
j. This application is not ready for environmental analysis at this time.
k. The Errol Project consists of: 1 An existing dam consisting of a 25-foothigh, 202.5- foot-long gated section separated by rock-filled timber or concrete crib piers supporting five sluice gates and seven deep gates, and an earthen dike with a sheet steel cutoff wall on the upstream side, extending approximately 50 feet from the end of the gated section of the dam to the northwestern wall of the powerhouse and then extending another approximately 70 feet from the southeastern powerhouse wall to the eastern embankment; 2 an approximately 9,098-acre project impoundment with a storage capacity of 89,568 acre-feet at a normal pond elevation of 1,247 feet, which includes an approximately 3-mile-long reach of the Androscoggin River above Errol Dam, Umbagog Lake, and approximately 4.3 miles of the Magalloway River; 3
a reinforced concrete powerhouse containing one horizontal double regulated bulb turbine-generator unit with a hydraulic capacity of 2,600 cubic feet per second and an authorized installed generating capacity of 2,031
kilowatts kW; 4 an approximately 80foot-long tailrace; 5 a 3,333-kilovoltampere substation power transformer;
and 6 appurtenant facilities.
The Errol Project is operated in accordance with the current license, and three water agreements that dictate operational flows in the watershed for other hydropower developments and for waterfowl nesting, with an estimated annual energy production of approximately 15,944 megawatt hours.
The licensees propose to operate the project allowing for seasonal flows necessary for waterfowl nesting in Umbagog Lake and spring runoff and does not propose any new construction to the project. A license amendment was issued for the project in 2016 156 FERC
62,045 2016, which approved the installation of a sixth turbine generator unit, which would increase the total installed capacity to 3,542.5 kW;
however, the additional generator unit has not yet been installed.

PO 00000

Frm 00024

Fmt 4703

Sfmt 4703

l. A copy of the application can be viewed on the Commissions website at http www.ferc.gov using the eLibrary link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commissions Public Reference Room due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease COVID19
issued on March 13, 2020. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, 866 2083676 or 202 502
8659 TTY.
m. You may also register online at http www.ferc.gov/docs-filing/
esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects.
For assistance, contact FERC Online Support.
n. Procedural schedule: The application will be processed according to the following preliminary schedule.
Revisions to the schedule will be made as appropriate.
Milestone Issue Deficiency Letter if necessary.
Request Additional Information.
Notice of Acceptance December.
Notice of Ready for Environmental Analysis TBD.

Target date September 2021.
September 2021.
2021.

o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.
Dated: August 6, 2021.
Debbie-Anne A. Reese, Deputy Secretary.
FR Doc. 202117240 Filed 81121; 8:45 am BILLING CODE 671701P

ENVIRONMENTAL PROTECTION
AGENCY
FRL881901R6

Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for BP Amoco Chemical Company, Texas City Chemical Plant, Galveston County, Texas Environmental Protection Agency EPA.

AGENCY:

E:FRFM12AUN1.SGM

12AUN1

Riguardo a questa edizione

Federal Register - August 12, 2021

TitoloFederal Register

PaeseStati Uniti

Data12/08/2021

Conteggio pagine323

Numero di edizioni7800

Prima edizione14/03/1936

Ultima edizione23/06/2026

Scarica questa edizione

Altre edizioni

<<<Agosto 2021>>>
DLMMJVS
1234567
891011121314
15161718192021
22232425262728
293031