Federal Register - August 11, 2021
Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.
Source: Federal Register
Federal Register / Vol. 86, No. 152 / Wednesday, August 11, 2021 / Rules and Regulations
43931
TABLE 11ANNUAL MTR FACILITY PRODUCTION COST SAVINGS
MTR facility production cost savings from:
Instances of documents forecast to be submitted
Expected rate of electronic documents submitted %
Manuals Submitted Electronically
Manuals Submitted in Printed Form
Amendments Submitted Electronically
Amendments Submitted in Printed Form
Inadequate Manuals Submitted Electronically
Inadequate Manuals Submitted in Printed Form
Inadequate Amendments Submitted Electronically
Inadequate Amendments Submitted in Printed Form
261
442
261
442
75
25
75
25
23
8
11
4
2
1
2
1
2
1
2
1
$16.21
16.21
2.42
2.42
16.21
16.21
2.42
2.42
$6,346.22
1,057.70
1,604.46
267.41
1,946.17
338.46
235.32
42.79
Total
11,838.53
1 All
Reduction in printed documents needed
Production costs each 1
Total production cost savings
production cost figures in this column can be found in tables 5 and 6.
In addition to the cost savings associated with the need to manufacture and assemble less documentation, there will also be a cost savings associated with having to mail fewer documents to the COTP. Tables 12 and 13 capture
these savings by facility and document type.
The Instances of Documents Forecast to be Submitted column represents the total number of each type of document expected to be submitted to the COTP.
The Expected Rate of Electronic
Documents column shows the percentage of each type of document that is expected to be submitted in electronic format. The Shipping Costs column shows the costs associated with mailing and handling each type of document.
TABLE 12ANNUAL LNG/LHG FACILITY SHIPPING AND HANDLING COST SAVINGS
LNG/LHG facility shipping cost savings from:
Instances of documents forecast to be submitted
Expected rate of electronic documents submitted
Shipping and handling costs each package 1
Manuals Submitted Electronically
Manuals Submitted in Printed Form
Amendments Submitted Electronically
Amendments Submitted in Printed Form
Inadequate Manuals Submitted Electronically
Inadequate Manuals Submitted in Printed Form
Inadequate Amendments Submitted Electronically
Inadequate Amendments Submitted in Printed Form
18
42
18
42
0.9
0.1
0.9
0.1
0.27
0.03
0.14
0.02
$15.84
14.90
13.18
13.18
15.84
14.90
13.18
13.18
$256.61
26.82
498.20
55.36
76.98
8.05
77.50
11.07
Total
1,010.59
Total annual shipping cost savings
1 It
should be noted that this is the cost per document set, not per document. For example, in the first row, when manuals are submitted electronically, the cost of producing and mailing two documents would be saved $15.84. In the second row, when a document is submitted in printed format, the cost of producing and mailing only one document would be saved $14.90. All numbers in this column are from table 9.
jbell on DSKJLSW7X2PROD with RULES
TABLE 13ANNUAL MTR FACILITY SHIPPING AND HANDLING COST SAVINGS
MTR facility shipping cost savings from:
Instances of documents forecast to be submitted
Expected rate of electronic documents submitted
Shipping costs each package 1
Manuals Submitted Electronically
Manuals Submitted in Printed Form
Amendments Submitted Electronically
Amendments Submitted in Printed Form
Inadequate Manuals Submitted Electronically
Inadequate Manuals Submitted in Printed Form
Inadequate Amendments Submitted Electronically
Inadequate Amendments Submitted in Printed Form
261
442
261
442
0.75
0.25
0.75
0.25
0.23
0.08
0.11
0.04
$18.74
17.80
15.71
15.71
18.74
17.80
15.71
15.71
$3,668.36
1,161.45
5,207.87
1,735.96
1,124.96
371.66
763.82
277.75
Total
14,311.83
1 All
numbers in this column are from table 9.
VerDate Sep<11>2014
17:21 Aug 10, 2021
Jkt 253001
PO 00000
Frm 00023
Fmt 4700
Sfmt 4700
E:FRFM11AUR1.SGM
11AUR1
Total annual shipping cost savings