Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.

Source: Federal Register

43690

Federal Register / Vol. 86, No. 151 / Tuesday, August 10, 2021 / Notices LICENSE AMENDMENT REQUESTSContinued Entergy Operations, Inc.; Arkansas Nuclear One, Unit 2; Pope County, AR

Docket Nos.
Application date
ADAMS Accession No.
Location in Application of NSHC
Brief Description of Amendments

Proposed Determination
Name of Attorney for Licensee, Mailing Address NRC Project Manager, Telephone Number

50368.
May 26, 2021.
ML21147A264.
Pages 2728 of Enclosure 1.
The proposed amendment would modify the licensing basis by the addition of a license condition to allow for the implementation of the provisions of 10 CFR 50.69, Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors, for Arkansas Nuclear One, Unit 2. These provisions would allow adjustment of the scope of equipment subject to special treatment controls e.g., quality assurance, testing, inspection, condition monitoring, assessment, and evaluation. For equipment determined to be of low safety significance, alternative treatment requirements could be implemented in accordance with this regulation.
NSHC.
Anna Vinson Jones, Senior Counsel, Entergy Services, Inc.,101 Constitution Avenue NW, Suite 200 East, Washington, DC 20001.
Thomas Wengert, 3014154037.

Entergy Operations, Inc.; Arkansas Nuclear One, Units 1 and 2; Pope County, AR; Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3; St. Charles Parish, LA
Docket Nos.
Application date
ADAMS Accession No.
Location in Application of NSHC
Brief Description of Amendments

Proposed Determination
Name of Attorney for Licensee, Mailing Address NRC Project Manager, Telephone Number

50313, 50368, 50382.
July 1, 2021.
ML21182A158.
Pages 35 of Enclosure 1.
The proposed amendments would revise technical specifications TSs to adopt Technical Specifications Task Force TSTF Traveler TSTF577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections for Arkansas Nuclear One, Units 1 and 2, and Waterford Steam Electric Station, Unit 3. The TSs related to steam generator SG tube inspections and reporting are revised based on operating history. The proposed changes would revise the TSs related to SG tube inspection and reporting requirements in the administration controls section of the TSs. TSTF577 would revise the TSs related to SG tube inspections to extend the inspection interval for thermally treated Alloy 600 and thermally treated Alloy 690 SG tubing. The NRC issued a final safety evaluation approving TSTF577, Revision 1, on April 14, 2021 ADAMS Package Accession No. ML21099A086.
NSHC.
Anna Vinson Jones, Senior Counsel, Entergy Services, Inc.,101 Constitution Avenue NW, Suite 200 East, Washington, DC 20001.
Siva Lingam, 3014151564.

Exelon Generation Company, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA
Docket Nos.
Application date
ADAMS Accession No.
Location in Application of NSHC
Brief Description of Amendments

Proposed Determination
Name of Attorney for Licensee, Mailing Address NRC Project Manager, Telephone Number

50352, 50353.
March 11, 2021, as supplemented by letter dated May 5, 2021.
ML21070A412, ML21125A215.
Pages 2022 of the Enclosure.
The proposed amendments would modify the licensing basis by revising the license condition in Appendix C to allow the use of an alternate defense-in-depth categorization process, an alternate pressure boundary categorization process, and an alternate Seismic Tier 1 categorization process to allow the implementation of risk-informed categorization and treatment of structures, systems and components in accordance with 10 CFR 50.69.
NSHC.
Tamra Domeyer, Associate General Counsel, Exelon Generation Company, LLC, 4300 Winfield Road, Warrenville, IL 60555.
V. Sreenivas, 3014152597.

Exelon Generation Company, LLC; R. E. Ginna Nuclear Power Plant; Wayne County, New York
jbell on DSKJLSW7X2PROD with NOTICES

Docket Nos.
Application date
ADAMS Accession No.
Location in Application of NSHC
Brief Description of Amendments

Proposed Determination
Name of Attorney for Licensee, Mailing Address NRC Project Manager, Telephone Number

VerDate Sep<11>2014

17:05 Aug 09, 2021

Jkt 253001

50244.
May 20, 2021.
ML21140A324.
Pages 56 of the Enclosure.
The proposed amendment would modify technical specification TS requirements to allow the use of Risk-Informed Completion Times in accordance with Technical Specifications Task Force TSTF Traveler TSTF505, Revision 2, Provide Risk-Informed Extended Completion TimesRITSTF Risk-Informed TSTF Initiative 4b ADAMS Accession No. ML18183A493.
This would change the TS requirements related to Completion Times CTs for Required Actions Action allowed outage times to provide the option to calculate a longer, risk-informed CT.
NSHC.
Tamra Domeyer, Associate General Counsel, Exelon Generation Company, LLC, 4300 Winfield Road, Warrenville, IL 60555.
V. Sreenivas, 3014152597.

PO 00000

Frm 00067

Fmt 4703

Sfmt 4703

E:FRFM10AUN1.SGM

10AUN1

Riguardo a questa edizione

Federal Register - August 10, 2021

TitoloFederal Register

PaeseStati Uniti

Data10/08/2021

Conteggio pagine325

Numero di edizioni7801

Prima edizione14/03/1936

Ultima edizione24/06/2026

Scarica questa edizione

Altre edizioni

<<<Agosto 2021>>>
DLMMJVS
1234567
891011121314
15161718192021
22232425262728
293031