Federal Register - August 5, 2021

Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.

Source: Federal Register

khammond on DSKJM1Z7X2PROD with RULES

42710

Federal Register / Vol. 86, No. 148 / Thursday, August 5, 2021 / Rules and Regulations
Elkin, NC, KZEF, NDBA, Orig, CANCELLED
Kindred, ND, K74, RNAV GPS RWY 11, Amdt 1E
Kindred, ND, K74, RNAV GPS RWY 29, Amdt 1E
Watford City, ND, Watford City Muni, Takeoff Minimums and Obstacle DP, Amdt 2
Burwell, NE, KBUB, RNAV GPS RWY 33, Orig-B
Lincoln, NE, KLNK, ILS Y OR LOC Y RWY
18, Amdt 7C
Lincoln, NE, KLNK, ILS Y OR LOC Y RWY
36, Amdt 11K
Lincoln, NE, KLNK, VOR Y RWY 18, Amdt 13B
Dayton, OH, KDAY, ILS OR LOC RWY 24R, Amdt 10B
Hamilton, OH, KHAO, ILS OR LOC RWY 29, Amdt 2A
Waverly, OH, KEOP, RNAV GPS RWY 7, Amdt 1B
Waverly, OH, KEOP, RNAV GPS RWY 25, Amdt 1B
Corvallis, OR, KCVO, RNAV GPS RWY 17, Amdt 1B
Corvallis, OR, KCVO, RNAV GPS RWY 35, Amdt 3A
La Grande, OR, KLGD, NDBB, Amdt 2
La Grande, OR, La Grande/Union County, Takeoff Minimums and Obstacle DP, Amdt 4
Conway, SC, KHYW, NDB RWY 4, Orig-D
Huron, SD, Huron Rgnl, Takeoff Minimums and Obstacle DP, Amdt 5A
Clarksville, TN, KCKV, RNAV GPS RWY
17, Amdt 1B
Dyersburg, TN, Dyersburg Rgnl, Takeoff Minimums and Obstacle DP, Amdt 1A
Dyersburg, TN, KDYR, VORA, Amdt 18B, CANCELLED
Memphis, TN, KMEM, RNAV GPS Z RWY
18C, Amdt 2C
Memphis, TN, KMEM, RNAV GPS Z RWY
18L, Amdt 2E
Memphis, TN, KMEM, RNAV GPS Z RWY
18R, Amdt 2G
Comanche, TX, KMKN, RNAV GPS RWY
35, Orig-B
Houston, TX, KHOU, RNAV GPS RWY 17, Amdt 1B, CANCELLED
Houston, TX, KHOU, RNAV GPS RWY 35, Amdt 1C, CANCELLED
Houston, TX, William P Hobby, Takeoff Minimums and Obstacle DP, Amdt 7A
Midland, TX, KMAF, RADAR 1, Amdt 7A, CANCELLED
Van Horn, TX, KVHN, RNAV GPS RWY 21, Orig-B
Martinsville, VA, KMTV, RNAV GPS RWY
13, Amdt 2A
Highgate, VT, KFSO, RNAV GPS RWY 19, Amdt 2
Land O Lakes, WI, Kings Land O Lakes, Takeoff Minimums and Obstacle DP, Amdt 5
Wheeling, WV, KHLG, ILS OR LOC RWY 3, Amdt 23A

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission 18 CFR Parts 4 and 5
Docket No. RM2021000; Order No. 877

Removing Profile Drawing Requirement for Qualifying Conduit Notices of Intent and Revising Filing Requirements for Major Hydroelectric Projects 10 MW or Less Federal Energy Regulatory Commission, Department of Energy.
ACTION: Final rule.
AGENCY:

FR Doc. 202116584 Filed 8421; 8:45 am
In this final rule, the Federal Energy Regulatory Commission Commission is amending its regulations governing the filing requirements for qualifying conduits and certain major hydroelectric power projects. Specifically, the Commission is removing the requirement that a notice of intent to construct a qualifying conduit include a profile drawing showing the source of the hydroelectric potential in instances where a dam would be constructed in association with the facility and extending the licensing requirements that currently apply to major projects up to 5
megawatts MW to major projects 10
MW or less, consistent with the amended definition of a small hydroelectric power project in the Hydropower Regulatory Efficiency Act of 2013.
DATES: This rule is effective October 4, 2021.
FOR FURTHER INFORMATION CONTACT:
Heather Campbell Technical Information, Office of Energy Projects, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426, 202 5026182, heather.e.campbell@ferc.gov.
Kelly Houff Technical Information, Office of Energy Projects, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426, 202 5026393, kelly.houff@ferc.gov.
John Matkowski Technical Information, Office of Energy Projects, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC
20426, 202 5028576, john.matkowski@ferc.gov.
Rachael Warden Legal Information, Office of the General Counsel, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426, 202 5028717, rachael.warden@
ferc.gov.

BILLING CODE 491013P

SUPPLEMENTARY INFORMATION:

VerDate Sep<11>2014

16:02 Aug 04, 2021

Jkt 253001

SUMMARY:

PO 00000

Frm 00030

Fmt 4700

Sfmt 4700

I. Background 1. By this final rule, the Federal Energy Regulatory Commission Commission or FERC is amending parts 4 and 5 of its regulations governing the filing requirements for qualifying conduits and certain major hydroelectric power projects. The Commission, under Part I of the Federal Power Act FPA, licenses hydropower projects that are developed by nonFederal entities including individuals, private entities, states, municipalities, electric cooperatives, and others.
2. The Hydropower Regulatory Efficiency Act of 2013 2013 HREA 1
was signed into law on August 9, 2013.
As explained below, changes implemented in response to the 2013
HREA form the basis for these revisions to the Commissions regulations.
II. Notice of Proposed Rulemaking 3. On February 18, 2021, the Commission issued a notice of proposed rulemaking NOPR proposing to: 1
Remove the requirement that a notice of intent to construct a qualifying conduit include a profile drawing showing the source of the hydroelectric potential in instances where a dam would be constructed in association with the facility; and 2 extend the licensing requirements that currently apply to major projects up to 5 megawatts MW
to major projects 10 MW or less, consistent with the amended definition of a small hydroelectric power project in the 2013 HREA.2 The Commission did not receive any comments in response to the NOPR. The proposal set forth in the NOPR and the Commissions determination are discussed below.
III. Discussion A. Qualifying Conduits 4. The NOPR explained that the 2013
HREA amended section 30 of the FPA
to create a subset of small conduit facilities that are categorically excluded from the licensing and exemption requirements of the FPA. In 2014, the Commission issued Order No. 800, which became effective February 23, 2015, defining a qualifying conduit hydropower facility at 4.30b26 of its regulations.3 Subsequently, section 30 of the FPA was amended by the 1 Public
Law 11323, 127 Stat. 493 2013.
Profile Drawing Requirement for Qualifying Conduit Notices of Intent and Revising Filing Requirements for Major Hydroelectric Projects 10 MW or Less, 86 FR 13506 Mar. 9, 2021, 174 FERC 61,105 2021.
3 See Revisions and Technical Corrections to Conform the Commissions Regulations to the Hydropower Regulatory Efficiency Act of 2013, Order No. 800, 79 FR 59105 Oct. 1, 2014, 148
FERC 61,197 2014.
2 Removing
E:FRFM05AUR1.SGM

05AUR1

Riguardo a questa edizione

Federal Register - August 5, 2021

TitoloFederal Register

PaeseStati Uniti

Data05/08/2021

Conteggio pagine404

Numero di edizioni7797

Prima edizione14/03/1936

Ultima edizione17/06/2026

Scarica questa edizione

Altre edizioni

<<<Agosto 2021>>>
DLMMJVS
1234567
891011121314
15161718192021
22232425262728
293031