Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.

Source: Federal Register

Federal Register / Vol. 86, No. 114 / Wednesday, June 16, 2021 / Rules and Regulations
32151

TABLE VREBASELINED ANNUAL FEESContinued Actual dollars FY 2020
final annual fee $

Class/category of licenses
Uranium Enrichment Category 1.E
UF6 Conversion and Deconversion Facility Category 2.A.1
Basic In Situ Recovery Facilities Category 2.A.2b
Typical Users:
Radiographers Category 3O
All Other Specific Byproduct Material Licensees Category 3P
Medical Other Category 7C
Device/Product Safety EvaluationBroad Category 9A

The work papers that support this final rule show in detail how the NRC
allocates the budgeted resources for each class of licensees and calculates the fees.
Paragraphs a. through h. of this section describe the budgeted resources
allocated to each class of licensees and the calculations of the rebaselined fees.
For more information about detailed fee calculations for each class, please consult the accompanying work papers for this final rule.

FY 2021
final annual fee $

2,208,000
510,000
49,200

2,023,000
467,000
47,200

29,900
9,700
14,800
13,800

29,100
9,900
16,800
17,900

a. Operating Power Reactors The NRC will collect $441.7 million in annual fees from the operating power reactors fee class in FY 2021, as shown in Table VI. The FY 2020 operating power reactors fees are shown for comparison purposes.

TABLE VIANNUAL FEE SUMMARY CALCULATIONS FOR OPERATING POWER REACTORS
Dollars in millions FY 2020
final
jbell on DSKJLSW7X2PROD with RULES2

Summary fee calculations
FY 2021
final
Total budgeted resources
Less estimated 10 CFR part 170 receipts

$623.9
186.7

$611.8
161.6

Net 10 CFR part 171 resources
Allocated generic transportation
Fee-relief adjustment
Allocated LLW surcharge
Billing adjustment
Adjustment: Estimated current year collections from terminated reactor Indian Point Generating, Unit 2 in FY
2020 and Indian Point Generating, Unit 3 in FY 2021
Total required annual fee recovery
Total operating reactors
Annual fee per reactor

437.2
0.2
1.2
3.1
2.4

450.2
0.3
N/A
2.9
9.1

2.7
439.0
95
$4.621

2.7
441.7
93
$4.749

In comparison to FY 2020, the FY
2021 annual fee for the operating power reactors fee class is increasing primarily due to the following: 1 The decline in 10 CFR part 170 estimated billings; 2
the reduction in the total number of operating power reactors due to the closure of Duane Arnold and Indian Point Energy Center Indian Point Unit 3; and 3 the absence of the fee-relief credit that was provided in FY 2020 as part of the fee-relief adjustment. The increase in the annual fee for the operating power reactors fee class is partially offset due to the following: 1
The decrease in budgeted resources; 2
the 10 CFR part 171 billing adjustment that was included in the operating power reactors fee class calculation due to the deferral of annual fees and fees for services due to the coronavirus disease COVID19 pandemic; and 3
the current year collection adjustment
VerDate Sep<11>2014

19:08 Jun 15, 2021

Jkt 253001

due to the shutdown of Indian Point Unit 3. These components are discussed in the following paragraphs.
The 10 CFR part 170 estimated billings declined primarily due to the following: 1 The decrease due to the plant closures; 2 the completion of construction activities at Vogtle Electric Generating Plant, Unit 3 Vogtle Unit 3;
3 the completion of the NuScale small modular reactor SMR design certification review; and 4 the impact of continued travel restrictions and limited on-site presence on inspection activities due to the COVID19
pandemic. This decrease in the 10 CFR
part 170 estimated billings is partially offset by increased work to support the following: 1 The review of the Oklo Power LLC combined license COL
application for the Aurora micro reactor, which was docketed in June 2020; and 2 rescheduled inspection activities
PO 00000

Frm 00007

Fmt 4701

Sfmt 4700

that were deferred due to the COVID19
pandemic.
In addition, as a result of the revised fee-recovery framework under NEIMA, the FY 2021 annual fee increased due to the absence of the fee-relief credit that was provided in FY 2020 as part of the fee-relief adjustment. Because NEIMA
eliminated the approximately 90
percent requirement for fee recovery and, in turn, the 10 percent limit on feerelief activities, the NRC will no longer provide a fee-relief credit or assess a feerelief surcharge as part of the calculation of annual fees for each licensee fee class.
The increase in the annual fee is partially offset by a decline in FTEs associated with changes in workload, including, but not limited to, the following: 1 The completion of probabilistic risk assessment reviews related to lessons learned from the
E:FRFM16JNR2.SGM

16JNR2

Riguardo a questa edizione

Federal Register - June 16, 2021

TitoloFederal Register

PaeseStati Uniti

Data16/06/2021

Conteggio pagine291

Numero di edizioni7798

Prima edizione14/03/1936

Ultima edizione18/06/2026

Scarica questa edizione

Altre edizioni

<<<Junio 2021>>>
DLMMJVS
12345
6789101112
13141516171819
20212223242526
27282930