Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.
Source: Federal Register
jbell on DSKJLSW7X2PROD with PROPOSALS
Federal Register / Vol. 86, No. 60 / Wednesday, March 31, 2021 / Proposed Rules In the future, CSX anticipates to remotely operate an additional ten drawbridges from the CSX remote control center. As a general rule the Coast Guard will consider allowing one 1 remote operator to control up to three 3 separate bridges. This is dependent on the type of vessels that use the waterways, vessel traffic volume and environmental or geographical conditions of each bridge and waterway.
On January 22, 2020 the Coast Guard published a temporary deviation from regulations; request for comments TD
entitled Drawbridge Operation Regulation; Bayou Sara, Saraland, AL in the Federal Register 85 FR 3853. This temporary deviation was issued to test the remote operations system for 60
days. The objective was to also to collect and analyze information on how the drawbridge operated from a remote location and the potential effect on vessel traffic in the area. This deviation ended March 23, 2020.
Given the duration of time from the end of the test period and the development of this NPRM, the Coast Guard is authorizing second deviation to re-test the remote operations of the bridge and its effect on waterway mobility in that area. However, this deviation will run for 180 days and simultaneously with this NPRM. Both under the same docket number. Both documents can be found at https
www.regulations.gov and comments can be made to either document.
During the 60 day test period, the Coast Guard did not identify any issues with the remote operation of the bridge or any negative impact to a vessels reasonable ability to use this waterway.
The Coast Guard received two comments from the public during the test period. These comments can be viewed in the Docket and have been addressed throughout this NPRM or below. These comments have been summarized and evaluated by the Coast Guard.
One of the comments received expressed concern that remote operation systems have not been proven. Under 33
CFR 117.42 the Coast Guard has authorized a number of drawbridge to be remotely operated with successful results. Safety is a priority and the bridge must operate as if a drawtender were present at the bridge.
The same commenter had safety concerns that without drawtenders on site, maintenance, repairs, inspections and vessel assistance through the bridge would not be conducted. In accordance with CSX procedures, drawtenders are not allowed to perform these actions.
There are also concerns about unreported strikes of the bridge by
VerDate Sep<11>2014
15:49 Mar 30, 2021
Jkt 253001
vessels and potential trespassers at the bridge. CSX has cameras at the bridge and given that the bridge operating schedule is open on demand, the bridge must be monitored 24 hours a day. Also, vessels are required to report certain marine incidents and casualties and local law enforcement will be alerted if there is illegal activity at the bridge.
Another comment recommended that the bridge remain in the open to navigation position and close when a train is approaching. Coast Guard will consider this option and discuss with CSX during the comment and test period.
III. Discussion of Proposed Rule 33 CFR 117.42 sets Coast Guard drawbridge regulations. This regulation authorizes the Coast Guard District Commander to approve operations from a remote site. CSX has requested to operate the CSX Transportation Bridge across Bayou Sara from the CSX remote control center in Mobile, AL. The waterway users include recreational vessels requires approximately six openings a day.
Presently, the bridge opens on signal for the passage of vessels in accordance with 33 CFR 117.105 and this proposed rule will not change that operating schedule. This proposed rule will also not change how a request to open the bridge will be conducted. Mariners requiring an opening may do so by contacting the CSX remote control center on Channels 13/16 or by the phone number posted at the bridge.
The Coast Guard has visited the CSX
remote control center several times and has confirmed that the remote operating system is effective. This proposed rule allows CSX to control the drawbridge from their remote control center and requires CSX to have the capability, including resources and manpower to return the operator to the bridge location within 3 hours following any of the below situations:
Any component of the remote operations system fails and prevents the remote operator from being able to visually identify vessels, communicate with vessels, detect vessels immediately underneath the bridge or visually identify trains approaching the bridge.
CSX fails to meet Federal Railway Administration FRA or any other government agency safety requirements.
Anytime that CSX procedures, equipment or operators fail to safely open and close the bridge fail.
At the direction of the District Commander.
PO 00000
Frm 00004
Fmt 4702
Sfmt 4702
16681
IV. Regulatory Analyses We developed this proposed rule after considering numerous statutes and Executive Orders related to rulemaking.
Below we summarize its analyses based on these statutes and Executive Orders and we discusses First Amendment rights of protestors.
A. Regulatory Planning and Review Executive Orders 12866 and 13563
direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits.
Executive Order 13771 directs agencies to control regulatory costs through a budgeting process. This NPRM has not been designated a significant regulatory action, under Executive Order 12866. Accordingly, the NPRM
has not been reviewed by the Office of Management and Budget OMB and pursuant to OMB guidance it is exempt from the requirements of Executive Order 13771.
This regulatory action determination is based on the ability that vessels can still transit the bridge with the bridge operator controlling the bridge from a remote location.
B. Impact on Small Entities The Regulatory Flexibility Act of 1980
RFA, 5 U.S.C. 601612, as amended, requires federal agencies to consider the potential impact of regulations on small entities during rulemaking. The term small entities comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000.
The Coast Guard certifies under 5 U.S.C.
605b that this proposed rule would not have a significant economic impact on a substantial number of small entities.
While some owners or operators of vessels intending to transit the bridge may be small entities, for the reasons stated in section IV.A above this proposed rule would not have a significant economic impact on any vessel owner or operator.
If you think that your business, organization, or governmental jurisdiction qualifies as a small entity and that this rule would have a significant economic impact on it, please submit a comment see ADDRESSES explaining why you think it qualifies and how and to what degree this rule would economically affect it.
Under section 213a of the Small Business Regulatory Enforcement Fairness Act of 1996 Pub. L. 104121,