Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.
Source: Federal Register
10058
Federal Register / Vol. 86, No. 31 / Thursday, February 18, 2021 / Notices
BILLING CODE 645001C
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Project No. 4334017
jbell on DSKJLSW7X2PROD with NOTICES
EONY Generation Limited; Notice of Application Tendered for Filing With The Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 4334017.
c. Date filed: January 28, 2021.
d. Applicant: EONY Generation Limited EONY.
e. Name of Project: Philadelphia Hydroelectric Project.
f. Location: On the Indian River, in the Village of Philadelphia in Jefferson County, New York. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a825r.
h. Applicant Contact: Franz Kropp, Director, Generation, EONY, 7659
Lyonsdale Road, Lyons Falls, NY 13368;
613 2250418, ext. 7498. Murray Hall, Manager, Generation, EONY, 7659
Lyonsdale Road, Lyons Falls, NY 13368;
613 3827312.
i. FERC Contact: Emily Carter at 202
5026512, or Emily.Carter@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental
VerDate Sep<11>2014
17:47 Feb 17, 2021
Jkt 253001
document should follow the instructions for filing such requests described in item l below. Cooperating agencies should note the Commissions policy that agencies that cooperate in the preparation of the environmental document cannot also intervene. See 94
FERC 61,076 2001.
k. Pursuant to section 4.32b7 of 18
CFR of the Commissions regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant.
l. Deadline for filing additional study requests and requests for cooperating agency status: March 29, 2021.
The Commission strongly encourages electronic filing. Please file additional study requests and requests for cooperating agency status using the Commissions eFiling system at https
ferconline.ferc.gov/FERCOnline.aspx.
For assistance, please contact FERC
Online Support at FERCOnlineSupport@ferc.gov, 866
2083676 toll free, or 202 5028659
TTY. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. All filings must clearly identify the project name and docket number on the first page:
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
Philadelphia Hydroelectric Project P
4334017.
m. The application is not ready for environmental analysis at this time.
n. Project Description: The existing Philadelphia Hydroelectric Project consists of 1 a 65-acre reservoir at a normal maximum water surface elevation of 475.4 feet; 1 2 two concrete dams joined by an island and designated as the east diversion dam, which is 60 feet long and 2 to 3 feet high with a crest elevation of 474.4 feet, and topped with 1.2-foot-high flashboards, and the west diversion dam, which has two sections totaling approximately 30
feet long and 10.4 feet high with a crest elevation of 475.4 feet; 3 a 45-foot-long non-overflow section that includes a reinforced concrete intake structure; 4
a 377-foot-long, 9.5-foot-diameter concrete penstock; 5 a 54.5-foot-long by 30-foot-wide reinforced concrete powerhouse; 6 one 3.645-megawatt horizontal Kaplan-type turbinegenerator unit; 7 trashracks with 2.5inch clear spacing; 8 a 4,160-volt, approximately 50-foot-long buried transmission line; 9 a switchyard; and 10 appurtenant facilities. The average annual generation was 10,092,492
kilowatt-hours for the period from 2016
to 2020.
EONY currently operates the project in run-of-river mode and discharges a minimum flow of 20 cubic feet per second cfs into the projects 1,250-footlong bypassed reach to project aquatic resources.
As part of the license application, EONY filed a settlement agreement entered into between itself, the U.S.
Fish and Wildlife Service, and the New York State Department of Environmental Conservation. As part of the settlement agreement, EONY
proposes to: 1 Continue to operate the project in a run-of-river mode; 2
1 All elevations are in National Geodetic Vertical Datum of 1929.
E:FRFM18FEN1.SGM
18FEN1
EN18FE21.006
FR Doc. 202029108 Filed 21721; 8:45 am