Federal Register - February 1, 2021

Versione di testo Cosa è?Dateas è un sito indipendente non affiliato a entità governative. La fonte dei documenti PDF che pubblichiamo qui è l'entità governativa indicata in ciascuno di essi. Le versioni in testo sono trascrizioni che realizziamo per facilitare l'accesso e la ricerca di informazioni, ma possono contenere errori o non essere complete.

Source: Federal Register

Federal Register / Vol. 86, No. 19 / Monday, February 1, 2021 / Rules and Regulations feet and temporary shielding will reduce the vertical clearance of the entire bridge to approximately 19 feet above mean high water in the closed position. Vessels that can safely transit through the bridge in the closed position with the reduced clearances may do so, if at least 30 minutes notice is given, to allow for safe navigation.

Dated: January 13, 2021.
L.M. Dickey, Rear Admiral, U.S. Coast Guard, Commander, Fifth Coast Guard District.
FR Doc. 202102058 Filed 12921; 8:45 am BILLING CODE 911004P

DEPARTMENT OF HOMELAND
SECURITY
Coast Guard 33 CFR Part 165
Docket Number USCG20200691
RIN 1625AA00

Safety Zone; Super Bowl LV;
Hillsborough Bay and River, Tampa, FL
Coast Guard, Department of Homeland Security DHS.
ACTION: Temporary final rule.
AGENCY:

The Coast Guard is establishing a temporary safety zone on certain waters of Garrison Channel, Seddon Channel Turning Basin, and the Hillsborough River, in the vicinity of downtown Tampa, Florida during the Super Bowl LV celebrations. The safety zone is necessary to protect the public and Super Bowl LV event personnel from the hazards associated with potential vessel traffic within the area of the safety zone. All persons and vessels would be required to transit through the safety zone at a steady speed and may not slow down, stop or anchor except in the case of unforeseen mechanical failure or other emergency unless given prior authorization from the Captain of the Port. Any person or vessel forced to slow or stop in the established zone must immediately notify the Captain of the Port Tampa via VHF channel 16.
DATES: This rule is effective daily from 12:01 a.m. on January 29, 2021, through 11:59 p.m. on February 7, 2021.
ADDRESSES: To view documents mentioned in this preamble as being available in the docket, go to https
www.regulations.gov, type USCG2020
0691 in the SEARCH box and click SEARCH. Click on Open Docket Folder on the line associated with this rule.
SUMMARY:

VerDate Sep<11>2014

16:10 Jan 29, 2021

Jkt 253001

If you have questions on this rule, call or email Marine Science Technician First Class Michael D. Shackleford, Sector St.
Petersburg Prevention Department, Coast Guard; telephone 813 2282191, email Michael.D.Shackleford@uscg.mil.
SUPPLEMENTARY INFORMATION:
FOR FURTHER INFORMATION CONTACT:

I. Table of Abbreviations CFR Code of Federal Regulations DHS Department of Homeland Security FR Federal Register NPRM Notice of proposed rulemaking Section U.S.C. United States Code
II. Background Information and Regulatory History The Coast Guard is issuing this temporary rule without prior notice and opportunity to comment pursuant to authority under section 4a of the Administrative Procedure Act APA 5
U.S.C. 553b. This provision authorizes an agency to issue a rule without prior notice and opportunity to comment when the agency for good cause finds that those procedures are impracticable, unnecessary, or contrary to the public interest. Under 5 U.S.C.
553bB, the Coast Guard finds that good cause exists for bypassing the full notice and comment process because it is impracticable and contrary to the public interest to do so in this situation.
On September 22, 2020, the Maritime Subcommittee for Super Bowl LV
notified the Coast Guard that during the Super Bowl LV event celebrations there will be several planned super bowlrelated events throughout the waterfront areas of Tampa, FL. These events will occur at various times from January 29, 2021 through February 7, 2021. These events could lead to large gatherings of persons and vessels in waterways around the Tampa area. The Captain of the Port St. Petersburg COTP has determined that the potential hazards associated with persons and vessel congestion within the safety zone during these events is a safety concern.
A notice of proposed rulemaking was published to the Federal Register on January 4, 2021, however, there remains insufficient time to complete the full rulemaking process.1 It is necessary for the Coast Guard to establish this safety zone by January 29, 2021, in order to ensure the appropriate level of protection exists in order to mitigate the potential safety hazards associated with the Super Bowl LV event celebrations.
1 See Coast Guard notice of proposed rulemaking, Safety Zone; Super Bowl LV; Hillsborough Bay and River, Tampa, FL 86 FR 32 this document is available at: https beta.regulations.gov/
document/USCG-2020-0691-0001.

PO 00000

Frm 00017

Fmt 4700

Sfmt 4700

7651

Therefore, this temporary final rule is being published before the comment period ends on the notice of proposed rulemaking.
Under 5 U.S.C. 553d3, the Coast Guard finds that good cause exists for making this rule effective less than 30
days after publication in the Federal Register. Delaying the effective date of this rule for the same reasons stated in the preceding paragraph.
III. Discussion of the Rule This rule establishes a safety zone from January 29, 2021, through February 7, 2021. The safety zone would cover certain navigable waters of Garrison Channel, Seddon Channel Turning Basin, and the Hillsborough River, in the vicinity of downtown Tampa, Florida. The duration of the zone is intended to ensure the safety of persons, vessels, and navigable waters before, during, and after the scheduled events.
All persons and vessels would be required to transit through the safety zone at a steady speed and may not slow down, stop or anchor except in the case of unforeseen mechanical failure or other emergency unless given prior authorization from the COTP. Any person or vessel forced to slow or stop in the established zone must immediately notify the Captain of the Port Tampa via VHF channel 16.
IV. Regulatory Analyses We developed this rule after considering numerous statutes and Executive orders related to rulemaking.
Below we summarize our analyses based on a number of these statutes and Executive orders, and we discuss First Amendment rights of protestors.
A. Regulatory Planning and Review Executive Orders 12866 and 13563
direct agencies to assess the costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits.
Executive Order 13771 directs agencies to control regulatory costs through a budgeting process. This rule has not been designated a significant regulatory action, under Executive Order 12866. Accordingly, this rule has not been reviewed by the Office of Management and Budget OMB, and pursuant to OMB guidance it is exempt from the requirements of Executive Order 13771.
This regulatory action determination is based on the size, location, scope and duration of the safety zone. The rule will impact only a small designated area of Garrison Channel, Seddon Channel Turning Basin, and the Hillsborough
E:FRFM01FER1.SGM

01FER1

Riguardo a questa edizione

Federal Register - February 1, 2021

TitoloFederal Register

PaeseStati Uniti

Data01/02/2021

Conteggio pagine179

Numero di edizioni7793

Prima edizione14/03/1936

Ultima edizione11/06/2026

Scarica questa edizione

Altre edizioni

<<<Febrero 2021>>>
DLMMJVS
123456
78910111213
14151617181920
21222324252627
28