Federal Register - October 8, 2021

Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.

Fuente: Federal Register

56260

Federal Register / Vol. 86, No. 193 / Friday, October 8, 2021 / Notices
appropriate action to be taken on the Application. All protests, comments, motions to intervene, or notices of intervention must meet the requirements specified by the regulations in 10 CFR part 590.
As noted, DOE is only accepting electronic submissions at this time.
Please email the filing to fergas@
hq.doe.gov. All filings must include a reference to Docket No. 2198LNG
or Freeport LNG Expansion, L.P. et al.
Application in the title line.
Please Note: Please include all related documents and attachments e.g., exhibits in the original email correspondence. Please do not include any active hyperlinks or password protection in any of the documents or attachments related to the filing. All electronic filings submitted to DOE
must follow these guidelines to ensure that all documents are filed in a timely manner. Any hardcopy filing submitted greater in length than 50 pages must also include, at the time of the filing, a digital copy on disk of the entire submission.
The Application and any filed protests, motions to intervene, notices of interventions, and comments will also be available electronically by going to the following DOE web address: https
www.energy.gov/fecm/division-naturalgas-regulation.
A decisional record on the Application will be developed through responses to this Notice by parties, including the parties written comments and replies thereto. Additional procedures will be used as necessary to achieve a complete understanding of the facts and issues. If an additional procedure is scheduled, notice will be provided to all parties. If no party requests additional procedures, a final Opinion and Order may be issued based on the official record, including the Application and responses filed by parties pursuant to this Notice, in accordance with 10 CFR 590.316.

jspears on DSK121TN23PROD with NOTICES1

Signed in Washington, DC, on October 5, 2021.
Amy Sweeney, Director, Office of Regulation, Analysis, and Engagement, Office of Resource Sustainability.
FR Doc. 202122018 Filed 10721; 8:45 am BILLING CODE 645001P

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Docket No. CP21499000

Columbia Gas Transmission, LLC;
Notice of Request Under Blanket Authorization and Establishing Intervention and Protest Deadline Take notice that on September 23, 2021, Columbia Gas Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 770022700, filed in the above referenced docket, a prior notice pursuant to sections 157.205, 157.208
and 157.216 of the Federal Energy Regulatory Commissions regulations under the Natural Gas Act, requesting authorization to replace a portion of its existing line 1485 consisting of approximately 1.78 miles of 20-inch diameter bare steel pipeline, to replace launcher and receiver facilities, located in Allegheny and Washington Counties, Pennsylvania Line 1485 Replacement Project. Columbia proposes to replace the facilities under authorities granted by its blanket certificate issued in Docket No. CP82480000.1 The proposed replacement will have no impact on Colombias existing customers or affect its existing storage operations. The estimated cost for the Project is approximately $23.3 million, all as more fully set forth in the request which is on file with the Commission and open to public inspection.
In addition to publishing the full text of this document in the Federal Register, the Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commissions Home Page http
ferc.gov using the eLibrary link.
Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commissions Public Reference Room, due to the proclamation declaring a National Emergency concerning the Novel Coronavirus Disease COVID19, issued by the President on March 13, 2020. For assistance, contact the Federal Energy Regulatory Commission at FERCOnlineSupport@ferc.gov or call toll-free, 886 2083676 or TYY, 202
5028659.
Any questions concerning this application should be directed to David A. Alonzo, Manager Project Authorizations, Columbia Gas 1 Michigan Wisconsin Pipe Line Company, 20
FERC 62,595 1982.

VerDate Sep<11>2014

17:07 Oct 07, 2021

Jkt 256001

PO 00000

Frm 00022

Fmt 4703

Sfmt 4703

Transmission, LLC, 700 Louisiana Street, Suite 1300, Houston, Texas 770022700, or by phone at 832.320.5477, or by email at David_
alonzo@tcenergy.com.
Pursuant to Section 157.9 of the Commissions Rules of Practice and Procedure,2 within 90 days of this Notice the Commission staff will either:
Complete its environmental review and place it into the Commissions public record eLibrary for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staffs issuance of the final environmental impact statement FEIS
or environmental assessment EA for this proposal. The filing of an EA in the Commissions public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staffs FEIS or EA.
Public Participation There are three ways to become involved in the Commissions review of this project: You can file a protest to the project, you can file a motion to intervene in the proceeding, and you can file comments on the project. There is no fee or cost for filing protests, motions to intervene, or comments. The deadline for filing protests, motions to intervene, and comments is 5:00 p.m.
Eastern Time on December 3, 2021. How to file protests, motions to intervene, and comments is explained below.
Protests Pursuant to section 157.205 of the Commissions regulations under the NGA,3 any person 4 or the Commissions staff may file a protest to the request. If no protest is filed within the time allowed or if a protest is filed and then withdrawn within 30 days after the allowed time for filing a protest, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request for 2 18

CFR Code of Federal Regulations 157.9.
CFR 157.205.
4 Persons include individuals, organizations, businesses, municipalities, and other entities. 18
CFR 385.102d.
3 18

E:FRFM08OCN1.SGM

08OCN1

Acerca de esta edición

Federal Register - October 8, 2021

TítuloFederal Register

PaísEstados Unidos de América

Fecha08/10/2021

Nro. de páginas474

Nro. de ediciones7801

Primera edición14/03/1936

Ultima edición24/06/2026

Descargar esta edición

Otras ediciones

<<<Octubre 2021>>>
DLMMJVS
12
3456789
10111213141516
17181920212223
24252627282930
31