Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.
Fuente: Federal Register
Federal Register / Vol. 86, No. 179 / Monday, September 20, 2021 / Notices
52151
Calendar Year 2020 Annual Load Factor
vi
Provide the actual monthly load factors for calendar year 2020. If the actual load factors are not availabl rovide the estimated load factors.
Load Factor vii
If the load factor data in 3.b.v-vi is estimated, provide a description of the method and basis for this estimation in the space provided below:
viii
Identify any factors or conditions in the next 5 years which may significantly change peak demands, load duration, or profile curves:
4. Applicants Resources. Please provide the following information:
a. A list of current power supplies if applicable, including the applicants own generation, as well as, purchases from others. For each supply, provide the resource name, capacity supplied, and the resources location.
Power su lies resource name, ca acit & location :
b.
For each power supplier, provide a description and status of the power supply contract including the termination date:
c.
For each power supplier, provide the type of power:
Power supply is on a firm basis.
Power supply is not on a firm basis. Please explain:
VerDate Sep<11>2014
b.
Transmission arrangements. Describe the transmission arrangements necessary to deliver firm power to the requested points of delivery. Include a brief description of the applicants transmission and distribution system including major interconnections. Provide a single-line drawing of applicants system, if one is available.
c.
Provide a brief explanation of the applicants ability to receive and use, or receive and distribute Federal power as of date.
16:49 Sep 17, 2021
Jkt 253001
PO 00000
Frm 00029
Fmt 4703
Sfmt 4725
E:FRFM20SEN1.SGM
20SEN1
EN20SE21.004
5. Transmission:
a. Points of delivery. Provide the requested points of delivery on W APAs transmission system or a third partys transmission system, the voltage of service required, and the capacity desired, if applicable.