Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.

Fuente: Federal Register

Federal Register / Vol. 86, No. 172 / Thursday, September 9, 2021 / Proposed Rules
lotter on DSK11XQN23PROD with PROPOSALS1

Jones Co. Plant site, does not imply that the Jones Company is responsible for the contamination located on the plant site.
The EPA regulations provide that the remedial investigation RI is a process undertaken . . . to determine the nature and extent of the problem presented by the release as more information is developed on site contamination, and which is generally performed in an interactive fashion with the feasibility Study FS 40 CFR
300.5. During the RI/FS process, the release may be found to be larger or smaller than was originally thought, as more is learned about the sources and the migration of the contamination.
However, the HRS inquiry focuses on an evaluation of the threat posed and therefore the boundaries of the release need not be exactly defined. Moreover, it generally is impossible to discover the full extent of where the contamination has come to be located before all necessary studies and remedial work are completed at a site. Indeed, the known boundaries of the contamination can be expected to change over time. Thus, in most cases, it may be impossible to describe the boundaries of a release with absolute certainty.
Further, as noted previously, NPL
listing does not assign liability to any party or to the owner of any specific property. Thus, if a party does not believe it is liable for releases on discrete parcels of property, it can submit supporting information to the agency at any time after it receives notice it is a potentially responsible party.
For these reasons, the NPL need not be amended as further research reveals more information about the location of the contamination or release.
G. How are sites removed from the NPL?
The EPA may delete sites from the NPL where no further response is appropriate under Superfund, as explained in the NCP at 40 CFR
300.425e. This section also provides that the EPA shall consult with states on proposed deletions and shall consider whether any of the following criteria have been met:
i Responsible parties or other persons have implemented all appropriate response actions required;
ii All appropriate Superfundfinanced response has been
implemented and no further response action is required; or iii The remedial investigation has shown the release poses no significant threat to public health or the environment and taking of remedial measures is not appropriate.
H. May the EPA delete portions of sites from the NPL as they are cleaned up?
In November 1995, the EPA initiated a policy to delete portions of NPL sites where cleanup is complete 60 FR
55465, November 1, 1995. Total site cleanup may take many years, while portions of the site may have been cleaned up and made available for productive use.
I. What is the Construction Completion List CCL?
The EPA also has developed an NPL
construction completion list CCL to simplify its system of categorizing sites and to better communicate the successful completion of cleanup activities 58 FR 12142, March 2, 1993.
Inclusion of a site on the CCL has no legal significance.
Sites qualify for the CCL when: 1
Any necessary physical construction is complete, whether or not final cleanup levels or other requirements have been achieved; 2 the EPA has determined that the response action should be limited to measures that do not involve construction e.g., institutional controls; or 3 the site qualifies for deletion from the NPL. For more information on the CCL, see the EPAs internet site at https www.epa.gov/
superfund/construction-completionsnational-priorities-list-npl-sites-number.
J. What is the Sitewide Ready for Anticipated Use measure?
The Sitewide Ready for Anticipated Use measure formerly called Sitewide Ready-for-Reuse represents important Superfund accomplishments and the measure reflects the high priority the EPA places on considering anticipated future land use as part of the remedy selection process. See Guidance for Implementing the Sitewide Ready-forReuse Measure, May 24, 2006, Office of Solid Waste and Emergency Response OSWER 9365.036. This measure applies to final and deleted sites where construction is complete, all cleanup goals have been achieved, and all institutional or other controls are in
50519

place. The EPA has been successful on many occasions in carrying out remedial actions that ensure protectiveness of human health and the environment for current and future land uses, in a manner that allows contaminated properties to be restored to environmental and economic vitality.
For further information, please go to https www.epa.gov/superfund/aboutsuperfund-cleanup-processreuse.
K. What is state/tribal correspondence concerning NPL listing?
In order to maintain close coordination with states and tribes in the NPL listing decision process, the EPAs policy is to determine the position of the states and tribes regarding sites that the EPA is considering for listing. This consultation process is outlined in two memoranda that can be found at the following website: https www.epa.gov/
superfund/statetribal-correspondenceconcerning-npl-site-listing.
The EPA has improved the transparency of the process by which state and tribal input is solicited. The EPA is using the web and where appropriate more structured state and tribal correspondence that 1 explains the concerns at the site and the EPAs rationale for proceeding; 2 requests an explanation of how the state intends to address the site if placement on the NPL
is not favored; and 3 emphasizes the transparent nature of the process by informing states that information on their responses will be publicly available.
A model letter and correspondence between the EPA and states and tribes where applicable, is available on the EPAs website at https www.epa.gov/
superfund/statetribal-correspondenceconcerning-npl-site-listing.
III. Contents of This Proposed Rule A. Proposed Additions to the NPL
In this proposed rule, the EPA is proposing to add 13 sites to the NPL, 12
to the General Superfund section, and one to the Federal Facilities section. All of the sites in this rule are being proposed for NPL addition based on an HRS score of 28.50 or above.
The sites are presented in the tables below.

GENERAL SUPERFUND SECTION
State
Site name
GA
IN
MA

Westside Lead
North 5th Street Groundwater Contamination
Lower Neponset River

VerDate Sep<11>2014

17:23 Sep 08, 2021

Jkt 253001

PO 00000

Frm 00036

Fmt 4702

Sfmt 4702

City/county
E:FRFM09SEP1.SGM

09SEP1

Atlanta.
Goshen.
Boston/Milton.

Acerca de esta edición

Federal Register - September 9, 2021

TítuloFederal Register

PaísEstados Unidos de América

Fecha09/09/2021

Nro. de páginas175

Nro. de ediciones7798

Primera edición14/03/1936

Ultima edición18/06/2026

Descargar esta edición

Otras ediciones

<<<Septiembre 2021>>>
DLMMJVS
1234
567891011
12131415161718
19202122232425
2627282930