Federal Register - August 30, 2021
Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.
Fuente: Federal Register
Federal Register / Vol. 86, No. 165 / Monday, August 30, 2021 / Notices conditions or during severe weather after both the certification of permanent cessation of operations and the certification of permanent fuel removal have been docketed for the facility.
For the Nuclear Regulatory Commission.
Joel S. Wiebe, Senior Project Manager, Plant Licensing Branch III, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
The exemption was issued on August 23, 2021.
Attachment: Exemption
DATES:
Please refer to Docket ID
NRC20210155 when contacting the NRC about the availability of information regarding this document.
You may obtain publicly available information related to this document using any of the following methods:
Federal Rulemaking website: Go to https www.regulations.gov and search for Docket ID NRC20210155. Address questions about Docket IDs in Regulations.gov to Stacy Schumann;
telephone: 3014150624; email:
Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION
CONTACT section of this document.
NRCs Agencywide Documents Access and Management System ADAMS: You may obtain publicly available documents online in the ADAMS Public Documents collection at https www.nrc.gov/reading-rm/
adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, contact the NRCs Public Document Room PDR
reference staff at 18003974209, 301
4154737, or by email to pdr.resource@
nrc.gov. The ADAMS accession number for each document referenced if it is available in ADAMS is provided the first time that it is mentioned in this document.
Attention: The PDR, where you may examine and order copies of public documents, is currently closed. You may submit your request to the PDR via email at pdr.resource@nrc.gov or call 1
8003974209 or 3014154737, between 8:00 a.m. and 4:00 p.m. ET, Monday through Friday, except Federal holidays.
ADDRESSES:
Joel S. Wiebe, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555
0001; telephone: 3014156606; email:
Joel.Wiebe@nrc.gov.
khammond on DSKJM1Z7X2PROD with NOTICES
FOR FURTHER INFORMATION CONTACT:
SUPPLEMENTARY INFORMATION:
The text of
the exemption is attached.
Dated: August 25, 2021.
VerDate Sep<11>2014
18:40 Aug 27, 2021
Jkt 253001
NUCLEAR REGULATORY
COMMISSION
Docket Nos. 50237 and 50249
Exelon Generation Company, LLC;
Dresden Nuclear Power Station, Units 2
and 3
Exemption Related to the Approval Authority for Suspension of Security Measures in an Emergency or During Severe Weather I. Background Exelon Generation Company, LLC
Exelon is the holder of Renewed Facility Operating License Nos. DPR19
and DPR25 for the Dresden Nuclear Power Station, Units 2 and 3 Dresden.
The licenses provide, among other things, that the facility is subject to all applicable rules, regulations, and orders of the U.S. Nuclear Regulatory Commission NRC, the Commission, now or hereafter in effect. The Dresden facility consists of two boiling-water reactors located in Grundy County, Illinois.
By letter dated September 2, 2020
Agencywide Documents Access and Management System ADAMS
Accession No. ML20246G627, Exelon provided formal notification to the NRC
pursuant to Title 10 of the Code of Federal Regulations 10 CFR Sections 50.82a1i and 50.4b8 of the intention to permanently cease power operations at Dresden on or before November 30, 2021.
In accordance with 10 CFR
50.82a1iii and 50.82a2, the 10
CFR part 50 licenses for the facility will no longer authorize reactor operation or emplacement or retention of fuel in the reactor vessel after certifications of permanent cessation of operations and permanent removal of fuel from the reactor vessel are docketed for Dresden.
As a result, licensed senior operators i.e., individuals licensed under 10 CFR
part 55 to manipulate the controls of a facility and to direct the licensed activities of licensed operators will no longer be required to support plant operating activities. Instead, certified fuel handlers CFHs i.e., non-licensed operators who have qualified in accordance with a fuel handler training program approved by the Commission will perform activities associated with decommissioning, irradiated fuel handling, and management.
PO 00000
Frm 00063
Fmt 4703
Sfmt 4703
48447
Commission approval of a fuel handler training program is needed to facilitate these activities.
By letter dated September 24, 2020
ADAMS Accession No. ML20269A233, Exelon submitted a request for Commission approval of the CFH
Training and Retraining Program for Dresden and by letter dated August 17, 2021 ADAMS Accession No.
ML21076A371, the Commission approved the CFH Training and Retraining Program. The CFH Training and Retraining Program is to be used to satisfy training requirements for the plant personnel responsible for supervising and directing the monitoring, storage, handling, and cooling of irradiated fuel in a manner consistent with ensuring the health and safety of the public. As stated in 10 CFR
50.2, Definitions, CFHs are qualified in accordance with a Commissionapproved training program.
II. Request/Action The Commissions regulation at 10
CFR 73.55p1 addresses the suspension of security measures in an emergency 10 CFR 73.55p1i or during severe weather 10 CFR
73.55p1ii by stating:
The licensee may suspend implementation of affected requirements of this section under the following conditions:
i In accordance with 50.54x and 50.54y of this chapter, the licensee may suspend any security measures under this section in an emergency when this action is immediately needed to protect the public health and safety and no action consistent with license conditions and technical specifications that can provide adequate or equivalent protection is immediately apparent. This suspension of security measures must be approved as a minimum by a licensed senior operator before taking this action.
ii During severe weather when the suspension of affected security measures is immediately needed to protect the personal health and safety of security force personnel and no other immediately apparent action consistent with the license conditions and technical specifications can provide adequate or equivalent protection. This suspension of security measures must be approved, as a minimum, by a licensed senior operator, with input from the security supervisor or manager, before taking this action.
By letter dated September 28, 2020
ADAMS Accession No. ML20272A212, Exelon requested an exemption from 10
CFR 73.55p1i and ii, pursuant to 10 CFR 73.5, Specific exemptions.
Consistent with 10 CFR 50.54y, the proposed exemption would authorize a CFH, in addition to a licensed senior operator, to approve the suspension of security measures in an emergency or during severe weather at Dresden.
E:FRFM30AUN1.SGM
30AUN1