Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.

Fuente: Federal Register

Federal Register / Vol. 86, No. 157 / Wednesday, August 18, 2021 / Notices
AI.--N!S-11!

--IN-

e- _

46201

_,
GoQllitl!_ _ _ _ AjN117

1

I

Figure 1. Map of Proposed Project Area
jbell on DSKJLSW7X2PROD with NOTICES

Detailed Description of Specific Activity The existing pier at Palmer Station consists of a sheetpile bulkhead backfilled with gravel and cobble that was built in 1967. It is severely deteriorated, and needs to be replaced as soon as possible.
This project would replace the existing pier with a new steel pipe pile supported concrete deck pier, new modern energy absorbing fender system and on-site power and lighting. Work on the fendering system would be above water. In-water work with the potential to produce underwater noise includes demolition of the existing pier,
VerDate Sep<11>2014

17:34 Aug 17, 2021

Jkt 253001

construction of the new pier and installation of wave attenuator piles.
While piles for the wave attenuator will be installed in this project, the wave attenuator itself would be installed later.
NMFS does not expect installation of the wave attenuator to result in take.
The existing bulkhead pier must be demolished prior to construction of the new pier. The existing sheetpile cofferdam bulkhead would be demolished and the sheets would be removed by a vibratory hammer or cut off at the mudline. Sheet pile removed from the pier cell would be loaded onto the material barge for disposal. A pier cell is a structure that has hollow sections i.e., cells.

PO 00000

Frm 00028

Fmt 4703

Sfmt 4703

New pile installation would include steel gravel-filled pipe piles as outlined in Table 1. The deck and pile caps for the pier are supported by the piles, which are installed in holes sockets created in the shallow bedrock by the DTH systems. Support vessels, including a tugboat, one stationary barge, a temporary floating construction platform, a 16-ft. 5-m skiff and one 200
horsepower work boat would be used for the duration of the project to complete in-water work. A separate gravel barge would deliver material at the beginning of the project, but would only be onsite for approximately 3 days.

E:FRFM18AUN1.SGM

18AUN1

EN18AU21.168

BILLING CODE 351022C

Acerca de esta edición

Federal Register - August 18, 2021

TítuloFederal Register

PaísEstados Unidos de América

Fecha18/08/2021

Nro. de páginas485

Nro. de ediciones7802

Primera edición14/03/1936

Ultima edición25/06/2026

Descargar esta edición

Otras ediciones

<<<Agosto 2021>>>
DLMMJVS
1234567
891011121314
15161718192021
22232425262728
293031