Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.

Fuente: Federal Register

44010

Federal Register / Vol. 86, No. 152 / Wednesday, August 11, 2021 / Notices
Issue Scoping Document 2March 2022
Issue Notice of Ready for Environmental AnalysisMarch 2022
q. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.
Dated: August 5, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202117137 Filed 81021; 8:45 am BILLING CODE 671701P

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Project No. 7656000

jbell on DSKJLSW7X2PROD with NOTICES

Village of Highland Falls High-Point Utility, LDC; Notice of Existing Licensees Failure To File a Notice of Intent To File a Subsequent License Application, and Soliciting; Notices of Intent To File a License Application and Pre-Application Documents The current license for Buttermilk Falls Hydroelectric Project No. 7656
Buttermilk Falls Project was issued to the original licensee, John A. Dodson, on June 24, 1986, for a term of 40 years, ending May 31, 2026.1 The project became non-operational in 2012 due to damage caused by Hurricanes Sandy and Irene, and has remained nonoperational since. The license was transferred to the current licensee, Village of Highland Falls High-Point Utility, LDC High-Point Utility on September 21, 2017.2 The 75-kilowatt kW project is located on Buttermilk Falls Brook, a tributary of the Hudson River, in Orange County, New York.
The principal project works consist of: 1 An 18-inch-high, 15-foot-long dam; 2 an 18-inch-diameter, 400-footlong PVC penstock; 3 a powerhouse containing one 55-kW and one 20-kW
generating unit, for a total of installed generating capacity of 75-kW; 4 two 480-volt generator leads; 5 a 300-footlong, 480-volt transmission line; and 6
a 0.48/13.6-kilovolt cable connecting the transformer to the area distribution system.
At least five years before the expiration of a license for a minor water power project in which sections 14 and 15 of the Federal Power Act were waived, the Commissions regulations require the licensee to file with the Commission a notice of intent NOI that 1 See
John A. Dodson, 35 FERC 62,532 1986.
John A. Dodson, Village of Highland Falls High-Point Utility, LDC, 160 FERC 62,239 2017.
2 See
VerDate Sep<11>2014

23:05 Aug 10, 2021

Jkt 253001

contains an unequivocal statement of the licensees intention to file or not to file an application for a subsequent license, details on the principal project works and installed plant capacity, and other information.3
If such a licensee does not inform the Commission that it intends to file an application for, in this case, a subsequent license for the project, the licensee may not file an application for a subsequent license, either individually or in conjunction with an entity or entities that are not currently licensees of the project.4
Because the current license expires on May 31, 2026, the NOI was due to be filed no later than the close of business on May 31, 2021.5 High-Point Utility, the current licensee for the Buttermilk Falls Project, failed to file an NOI by this date.6
Any party interested in filing a license application for the Buttermilk Falls Project No. 7656 must first file a NOI 7
and pre-application document PAD 8
pursuant to Part 5 of the Commissions regulations. Although the integrated licensing process is the default prefiling process, section 5.3b of the Commissions regulations allows a potential license applicant to request to use alternative licensing procedures when it files its NOI.9
This notice sets a deadline of 120
days from the date of this notice for interested applicants, other than the existing licensee, to file NOIs, PADs, and requests to use an alternative licensing process.
Applications for a subsequent license from potential non-licensee applicants must be filed with the Commission at 3 18 CFR 16.19b 2020 citing 18 CFR 16.6b.
Section 16.19b applies to licenses not subject to Parts 14 and 15 of the Federal Power Act.
4 18 CFR 16.24b 2020.
5 The Commissions Rules of Practice and Procedure provide that if a filing deadline falls on a Saturday, Sunday, holiday, or other day when the Commission is closed for business, the filing deadline does not end until the close of business on the next business day. 18 CFR 2007a2 2020.
Because the deadline to file the NOI fell on a federal holiday i.e., Memorial Day, the filing deadline was extended until the close of business on Tuesday, June 1, 2021.
6 On June 23, 2021, High-Point Utility filed a letter indicating that it intended to proceed with relicensing for the Buttermilk Falls Hydroelectric Project No. 7656, however, the filing was not in conformance with the noticing requirements of section 5.5 of the Commissions regulations, because among other things, it did not identify the principle project works and it did not include the names and mailing addresses of nearby municipalities, counties, political subdivisions, or affected Indian tribes. It also did not include a preapplication document as required by section 5.6 of the regulations.
7 18 CFR 5.5 2020.
8 18 CFR 5.6 2020.
9 18 CFR 5.3b 2020.

PO 00000

Frm 00023

Fmt 4703

Sfmt 4703

least 24 months prior to the expiration of the current license.10 Because the current license expires on May 31, 2026, applications for license for this project must be filed by May 31, 2024.11
Questions concerning this notice should be directed to Samantha Pollak at 202 5026419 or samantha.pollak@
ferc.gov.
Dated: August 5, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202117136 Filed 81021; 8:45 am BILLING CODE 671701P

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Docket No. IC2136000

Commission Information Collection Activities FERC725G1 and FERC
725G4; Consolidated Comment Request; Extension Federal Energy Regulatory Commission, DOE.
ACTION: Notice of information collections and request for comments.
AGENCY:

In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission Commission or FERC is soliciting public comment on the currently approved information collections, FERC725G1 Mandatory Reliability Standards for the Bulk-Power System:
Reliability Standard PRC0046 and FERC725G4 Mandatory Reliability Standards: Reliability Standard PRC
0102 Undervoltage Load Shedding.
DATES: Comments on the collections of information are due October 12, 2021.
ADDRESSES: You may submit your comments identified by Docket No.
IC2136000 on FERC725G1 and/or FERC725G4 by one of the following methods:
Electronic filing through http
www.ferc.gov is preferred.
Electronic Filing: Documents must be filed in acceptable native applications and print-to-PDF, but not in scanned or picture format.
For those unable to file electronically, comments may be filed by USPS mail or by hand including courier delivery:
SUMMARY:

10 18

CFR 16.20 2020.
the extent an interested applicant files an NOI and PAD and elects or is required to use the Commissions ILP, a process plan will be issued within 180 days of this notice, which accelerates the steps of the ILP to allow for filing a subsequent license application by the May 31, 2024 deadline.
11 To
E:FRFM11AUN1.SGM

11AUN1

Acerca de esta edición

Federal Register - August 11, 2021

TítuloFederal Register

PaísEstados Unidos de América

Fecha11/08/2021

Nro. de páginas363

Nro. de ediciones7802

Primera edición14/03/1936

Ultima edición25/06/2026

Descargar esta edición

Otras ediciones

<<<Agosto 2021>>>
DLMMJVS
1234567
891011121314
15161718192021
22232425262728
293031