Federal Register - May 11, 2021
Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.
Fuente: Federal Register
Federal Register / Vol. 86, No. 89 / Tuesday, May 11, 2021 / Notices socioeconomic impacts and environmental justice.
The EIS will include discussion and review of any proposed natural gas pipelines that would be a necessary component of a new proposed CC or CT
plants under Alternatives A or B.
Currently under Alternative A, TVA is considering replacing generation at the CUF location which would require an approximate 30 mile natural gas pipeline to bring gas supply to the CUF
reservation. Under Alternative B, since TVA is considering replacement generation at locations with existing transmission infrastructure and an adequate supply of natural gas, no further pipeline construction would be needed other than the lateral lines necessary to make the connection to the facility itself. The construction of the natural gas pipelines would likely be subject to Federal Energy Regulatory Commission FERC jurisdiction and additional review will be undertaken by FERC in accordance with its own NEPA
procedures. The proposed action may also require issuance of an Individual or Nationwide Permit under Section 404 of the Clean Water Act; Section 401 Water Quality Certification; conformance with Executive Orders on Environmental Justice 12898, Wetlands 11990, Floodplain Management 11988, Migratory Birds 13186, and Invasive Species 13112; and compliance with Section 106 of the National Historic Preservation Act, Section 7 of the Endangered Species Act, and other applicable Local, Federal and State regulations.
Scoping Process Scoping, which is integral to the process for implementing NEPA, provides an early and open process to ensure that 1 issues are identified early and properly studied; 2 issues of little significance do not consume substantial time and effort; 3 the draft EIS is thorough and balanced; and 4 delays caused by an inadequate EIS are avoided.
TVA invites members of the public as well as Federal, state, and local agencies and federally recognized Indian tribes to comment on the scope of the EIS.
Information about this project is available on the TVA web page at www.tva.com/nepa, including a link to a virtual public meeting room and an online public comment page. Comments on the scope of this EIS should be submitted no later than the date given under the DATES section of this notice.
Any comments received, including names and addresses, will become part of the administrative record and will be available for public inspection.
VerDate Sep<11>2014
17:13 May 10, 2021
Jkt 253001
After consideration of the comments received during this scoping period, TVA will summarize public and agency comments, identify the issues and alternatives to be addressed in the draft EIS, and identify the schedule for completing the EIS process. Following analysis of the issues, TVA will prepare a draft EIS for public review and comment. Notice of availability of the draft EIS will be published by the U.S.
Environmental Protection Agency in the Federal Register. TVA will solicit written comments on the draft EIS and also hold a public open house, which may be virtual, for this purpose. TVA
expects to release the draft EIS in Spring of 2022. TVA anticipates issuing the final EIS in Fall of 2022 and a record of decision at least 30 days after its release.
Rebecca Tolene, Vice President, Environment.
FR Doc. 202109945 Filed 51021; 8:45 am BILLING CODE 812008P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration Notice of Opportunity for Public Comment on Release and Sale of Land Acquired With Airport Improvement Program AIP Assistance at Evergreen Municipal Airport, Evergreen, Alabama Federal Aviation Administration, DOT.
ACTION: Request for public comments.
AGENCY:
Notice is being given that the FAA is considering a request from the City of Evergreen, Alabama to sell 1.76
acres of airport property, previously purchased through an AIP grant for the runway protection zone, to be used by the state highway department as rightof-way for the widening of US Highway 84.
DATES: Comments must be received on or before June 10, 2021.
ADDRESSES: Comments on this notice may be mailed or delivered in triplicate to the FAA to the following address:
Jackson Airports District Office Attn:
Graham Coffelt, Program Manager, 100
West Cross Street, Suite B Jackson, MS
392082307.
In addition, one copy of any comments submitted to the FAA must be mailed or delivered to City of Evergreen, Alabama, Attn: Honorable Stanley B. Stallworth, Mayor, City of Evergreen, 355 East Front Street, Evergreen AL 36401.
FOR FURTHER INFORMATION CONTACT:
Graham Coffelt, Program Manager, Jackson Airports District Office, 100
SUMMARY:
PO 00000
Frm 00099
Fmt 4703
Sfmt 4703
25935
West Cross Street, Suite B, Jackson, MS
392082307, 601 6649886. The land release request may be reviewed in person at this same location.
SUPPLEMENTARY INFORMATION: The FAA
is reviewing a request by the City of Evergreen Alabama to release approximately 1.76 acres, more or less of airport property at Evergreen Municipal Airport GZH under the provisions of Title 49, U.S.C. Section 47107h2. The sale of the subject property will result in the land at GZH
being released from the conditions of the Airport Improvement Program Grant Agreement Grant Assurances. The FAA
determined that the request to release property at GZH submitted by the Sponsor meets the procedural requirements of the Federal Aviation Administration and the release of the property does not and will not impact future aviation needs at the airport. The FAA may approve the request, in whole or in part, no sooner than thirty days after the publication of this notice. The 1.76 acres of property is located within the runway protection zone and the FAA has concurred that the sponsor has done a sufficient level of analysis per guidance on land use in the runway protection zone. A deed restriction or easement for obstruction clearing will remain on the 1.76 acres. In accordance with 49 U.S.C. 47107c2Bi and iii, the airport will receive fair market value for the property, which will be subsequently reinvested in another eligible airport improvement project at GZH.
Rans D. Black, Manager, Jackson Airports District Office, Southern Region.
FR Doc. 202109952 Filed 51021; 8:45 am BILLING CODE 491013P
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration Environmental Impact Statement;
Heber Valley Corridor, Wasatch County, Utah Federal Highway Administration FHWA, U.S.
Department of Transportation USDOT.
ACTION: Notice of intent to prepare an Environmental Impact Statement EIS.
AGENCY:
FHWA, on behalf of the Utah Department of Transportation UDOT, is issuing this notice to advise the public that an EIS will be prepared for proposed transportation improvements in the Heber Valley in Wasatch County, Utah.
SUMMARY:
E:FRFM11MYN1.SGM
11MYN1