Federal Register - March 22, 2021

Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.

Fuente: Federal Register

Federal Register / Vol. 86, No. 53 / Monday, March 22, 2021 / Rules and Regulations the requirements of section 801 when the agency for good cause finds that such procedure would be impracticable, unnecessary, or contrary to the public interest and the rule shall take effect at such time as the agency promulgating the rule determines. 5 U.S.C. 8082.
Pursuant to section 8082, SBA for good cause finds that a 60-day delay to provide public notice is impracticable and contrary to the public interest.
Likewise, for the same reasons, SBA for good cause finds that there are grounds to waive the 30-day effective date delay under the Administrative Procedure Act. 5 U.S.C. 553d3.
The last day to apply for and receive a PPP loan is March 31, 2021. Given the short duration of this program, and the urgent need to issue loans quickly, SBA
has determined that it is impractical and not in the public interest to provide a delayed effective date. An immediate effective date will give small businesses and nonprofit organizations affected by this interim final rule the maximum amount of time to apply for loans and lenders the maximum amount of time to process applications before the program ends.

Application Form for Schedule C Filers Using Gross Income March 3, 2021, SBA
Form 2484, Lenders Application Paycheck Protection Program Loan Guaranty Revised March 3, 2021, SBA
Form 2484SD, Lenders Application Second Draw Loan Guaranty Revised March 3, 2021,. SBA Forms 2483, 2483
C, 2483SD, and 2483SDC were amended to include the additional eligible entities where applicable and revise the Shuttered Venue Operator Grant Program certification due to the changes made by the American Rescue Plan Act. Other clarifying changes were also made to the forms. Additionally, conforming changes were made to SBA
Forms 2484 and 2484SD.
SBA has requested Office of Management and Budget OMB
emergency approval of the revisions to the information collections to give small businesses and nonprofits affected by this interim final rule the maximum amount of time to apply for loans and lenders the maximum amount of time to process applications before the program ends.

Executive Order 12988
SBA has drafted this rule, to the extent practicable, in accordance with the standards set forth in section 3a and 3b2 of Executive Order 12988, to minimize litigation, eliminate ambiguity, and reduce burden. The rule has no preemptive or retroactive effect.

The Regulatory Flexibility Act RFA
generally requires that when an agency issues a proposed rule, or a final rule pursuant to section 553b of the Administrative Procedure Act or another law, the agency must prepare a regulatory flexibility analysis that meets the requirements of the RFA and publish such analysis in the Federal Register. 5 U.S.C. 603, 604.
Rules that are exempt from notice and comment are also exempt from the RFA
requirements, including conducting a regulatory flexibility analysis, when among other things the agency for good cause finds that notice and public procedure are impracticable, unnecessary, or contrary to the public interest. SBA Office of Advocacy guide:
How to Comply with the Regulatory Flexibility Act, Ch.1. p.9. Since this rule is exempt from notice and comment, SBA is not required to conduct a regulatory flexibility analysis.

jbell on DSKJLSW7X2PROD with RULES

Executive Order 13132
SBA has determined that this rule will not have substantial direct effects on the States, on the relationship between the National Government and the States, or on the distribution of power and responsibilities among the various layers of government. Therefore, SBA has determined that this rule has no federalism implications warranting preparation of a federalism assessment.
Paperwork Reduction Act, 44 U.S.C.
Chapter 35
SBA has determined that this rule will require revisions to existing recordkeeping or reporting requirements of the Paycheck Protection Program PPP information collections OMB
Control Numbers 32450407 and 3245
0417. The revisions will affect SBA
Form 2483, Borrower Application Form Revised March 3, 2021, SBA Form 2483C, Borrower Application Form for Schedule C Filers Using Gross Income March 3, 2021, SBA Form 2483SD, Second Draw Borrower Application Form Revised March 3, 2021, SBA Form 2483SDC, Second Draw Borrower
VerDate Sep<11>2014

16:10 Mar 19, 2021

Jkt 253001

Regulatory Flexibility Act RFA

Authority: 15 U.S.C. 636a36; 15 U.S.C.
636a37; 15 U.S.C. 636m; Coronavirus Aid, Relief, and Economic Security Act, Pub. L.
116136, section 1114, Economic Aid to Hard-Hit Small Businesses, Nonprofits, and Venues Act Pub. L. 116260, section 303, and American Rescue Plan Act of 2021, sections 5001 and 5005.
James Rivera, Acting Administrator, Small Business Administration.
FR Doc. 202105930 Filed 31821; 4:15 pm BILLING CODE P

PO 00000

Frm 00021

Fmt 4700

Sfmt 4700

15089

DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration 14 CFR Part 39
Docket No. FAA20200971; Product Identifier 2020NM083AD; Amendment 3921453; AD 20210510
RIN 2120AA64

Airworthiness Directives; Airbus Canada Limited Partnership Type Certificate Previously Held by C Series Aircraft Limited Partnership CSALP;
Bombardier, Inc. Airplanes Federal Aviation Administration FAA, Department of Transportation DOT.
ACTION: Final rule.
AGENCY:

The FAA is adopting a new airworthiness directive AD for certain Airbus Canada Limited Partnership Model BD5001A10 and BD500
1A11 airplanes. This AD was prompted by a report that threaded fuel couplings were incorrectly installed at final assembly and in service. This AD
requires repetitive functional tests of the auxiliary power unit APU fuel feed line shroud, a general visual inspection of the APU fuel feed line shroud for any loose couplings; and tightening any loose couplings, which would terminate the repetitive functional tests. The FAA
is issuing this AD to address the unsafe condition on these products.
DATES: This AD is effective April 26, 2021.
The Director of the Federal Register approved the incorporation by reference of a certain publication listed in this AD
as of April 26, 2021.
ADDRESSES: For service information identified in this final rule, contact Airbus Canada Limited Partnership, 13100 Henri-Fabre Boulevard, Mirabel, Quebec J7N 3C6, Canada; telephone 4504767676; email a220_crc@
abc.airbus; internet http
a220world.airbus.com. You may view this service information at the FAA, Airworthiness Products Section, Operational Safety Branch, 2200 South 216th St., Des Moines, WA. For information on the availability of this material at the FAA, call 2062313195.
It is also available on the internet at https www.regulations.gov by searching for and locating Docket No.
FAA20200971.
SUMMARY:

Examining the AD Docket You may examine the AD docket on the internet at https
www.regulations.gov by searching for and locating Docket No. FAA2020

E:FRFM22MRR1.SGM

22MRR1

Acerca de esta edición

Federal Register - March 22, 2021

TítuloFederal Register

PaísEstados Unidos de América

Fecha22/03/2021

Nro. de páginas338

Nro. de ediciones7798

Primera edición14/03/1936

Ultima edición18/06/2026

Descargar esta edición

Otras ediciones

<<<Marzo 2021>>>
DLMMJVS
123456
78910111213
14151617181920
21222324252627
28293031