Federal Register - March 9, 2021
Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.
Fuente: Federal Register
13527
Federal Register / Vol. 86, No. 44 / Tuesday, March 9, 2021 / Notices amended the Act.2 In November 2020, Commerce received notices of intent to participate from Axis Pipe and Tube, California Steel Industries, Tex-Tube Company, Welspun Tubular LLC, Maverick Tube Corporation, IPSCO
Tubulars Inc., American Cast Iron Pipe Company ACIPCO, and Stupp Corporation collectively, domestic interested parties, within the deadline specified in 19 CFR 351.218d1i.3
The domestic interested parties claimed interested party status under section 7719C of the Act as manufacturers or producers of the domestic like product.4
On December 3, 2020, Commerce received an adequate substantive response to the Notice of Initiation from the domestic interested parties within the 30-day deadline specified in 19 CFR
351.218d3i.5 Commerce received no substantive response from any respondent interested parties.
On December 23, 2020, Commerce notified the U.S. International Trade Commission that it did not receive an adequate substantive response from respondent interested parties.6
Accordingly, pursuant to section 751c3B of the Act and 19 CFR
351.218e1iiC2, Commerce conducted an expedited 120-day sunset review of the Order.
Scope of the Order The merchandise covered by the Order is circular welded carbon and alloy steel other than stainless steel pipe of a kind used for oil or gas pipelines welded line pipe, not more than 24 inches in nominal outside diameter, regardless of wall thickness, length, surface finish, end finish, or stenciling. Welded line pipe is normally produced to the American Petroleum Institute API specification 5L, but can be produced to comparable foreign specifications, to proprietary grades, or can be non-graded material. All pipe meeting the physical description set forth above, including multiplestenciled pipe with an API or comparable foreign specification line pipe stencil is covered by the scope of this investigation.
The welded line pipe that is subject to the Order is currently classifiable in the Harmonized Tariff Schedule of the United States HTSUS under subheadings 7305.11.1030, 7305.11.5000, 7305.12.1030, 7305.12.5000, 7305.19.1030, 7305.19.5000, 7306.19.1010, 7306.19.1050, 7306.19.5110, and 7306.19.5150. The subject merchandise may also enter in HTSUS 7305.11.1060
and 7305.12.1060. While the HTSUS
subheadings are provided for convenience and customs purposes, the
written description of the scope of the Order is dispositive.
Analysis of Comments Received All issues raised in this sunset review are addressed in the Issues and Decision Memorandum, including the likelihood of continuation or recurrence of countervailable subsidies and the net countervailable subsidy likely to prevail if the Order were revoked.7 The Issues and Decision Memorandum is a public document and is on file electronically via Enforcement and Compliances Antidumping and Countervailing Duty Centralized Electronic Services System ACCESS. ACCESS is available to registered users at http
access.trade.gov. In addition, a complete version of the Issues and Decision Memorandum can be accessed directly at https enforcement.trade.gov/frn/
index.html. The signed and electronic versions of the Issues and Decision Memorandum are identical in content.
A list of the issues discussed in the decision memorandum is attached at the Appendix to this notice.
Final Results of Sunset Review Pursuant to sections 751c1 and 752b of the Act, Commerce determines that revocation of the Order would be likely to lead to continuation or recurrence of countervailable subsidies at the following rates:
Net countervailable subsidy percent
Manufacturer/producer/exporter Borusan Istikbal Ticaret, Borusan Mannesmann Boru Sanayi ve Ticaret A.S., Borusan Mannesmann Boru Yatirim Holding A.S., and Borusan Holding A.S
Toscelik Profil ve Sac Endustrisi A.S., Tosyali Demir Celik Sanayi A.S., Tosyali Dis Ticaret A.S., Tosyali Elektrik Enerjisi Toptan Satis Ith. Ihr. A.S., and Tosyali Holding A.S
All Others
Administrative Protective Order APO
khammond on DSKJM1Z7X2PROD with NOTICES
This notice serves as the only reminder to parties subject to APO of their responsibility concerning the disposition of proprietary information disclosed under APO in accordance with 19 CFR 351.305a. Timely written notification of the destruction of APO
materials or conversion to judicial protective order is hereby requested.
2 See Initiation of Five-Year Sunset Reviews, 85
FR 69585 November 3, 2020 Notice of Initiation.
3 See Axis Pipe and Tube, California Steel Industries, Tex-Tube Company, Welspun Tubular LLC, and Wheatland Tube Companys Letter, Notice of Intent to Participate in the First FiveYear Review of the Countervailing Duty Order on Certain Welded Line Pipe from Turkey, dated November 13, 2020; Maverick Tube Corporation and IPSCO Tubulars Inc.s Letter, Notice of Intent to Participate in First Sunset Reviews of the Antidumping and Countervailing Duty Orders on
VerDate Sep<11>2014
17:03 Mar 08, 2021
Jkt 253001
Failure to comply with the regulations and terms of an APO is a violation which is subject to sanction.
Notification to Interested Parties Commerce is issuing and publishing the final results and notice in accordance with sections 751c, 752b, and 777i1 of the Act.
Welded Line Pipe from Turkey, dated November 16, 2020; and American Cast Iron Pipe Company and Stupp Corporations Letter, Welded Line Pipe from the Republic of Turkey: Notice of Intent to Participate in Sunset Review, dated November 18, 2020.
4 See Domestic Interested Parties Letter, Welded Line Pipe from Turkey: Substantive Response of Domestic Producers to Commerces Notice of Initiation of Five-Year Sunset Reviews, dated December 3, 2020 Domestic Interested Parties Substantive Response at 2.
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
152.98
1.31
1.31
Dated: March 2, 2021.
Christian Marsh, Acting Assistant Secretary for Enforcement and Compliance.
Appendix List of Topics Discussed in the Issues and Decision Memorandum I. Summary II. Background 5 See Domestic Interested Parties Substantive Response.
6 See Commerces Letter, Sunset Reviews for November 2020, dated December 23, 2020.
7 See Memorandum, Issues and Decision Memorandum for the Expedited First Sunset Review of the Countervailing Duty Order on Welded Line Pipe from the Republic of Turkey, dated concurrently with, and hereby adopted by, this notice Issues and Decision Memorandum.
E:FRFM09MRN1.SGM
09MRN1