Federal Register - March 4, 2021

Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.

Fuente: Federal Register

jbell on DSKJLSW7X2PROD with PROPOSALS

12560

Federal Register / Vol. 86, No. 41 / Thursday, March 4, 2021 / Proposed Rules
percentage, the additional bid increment percentage, and the number of acceptable bid amounts if circumstances so dictate. See 47 CFR 1.2104d. OEA
and MB propose to retain the discretion to do so on a construction permit-byconstruction permit basis. OEA and MB
propose also to retain the discretion to limit a the amount by which a minimum acceptable bid for a construction permit may increase compared with the corresponding provisionally winning bid, and b the amount by which an additional bid amount may increase compared with the immediately preceding acceptable bid amount. For example, a $1,000 limit could be set on increases in minimum acceptable bid amounts over provisionally winning bids. In this example, if calculating a minimum acceptable bid using the minimum acceptable bid increment percentage results in a minimum acceptable bid amount that is $1,200 higher than the provisionally winning bid on a construction permit, the minimum acceptable bid amount would instead be capped at $1,000 above the provisionally winning bid. OEA and MB
also seek comment on the circumstances under which such a limit should be employed, factors to consider when determining the dollar amount of the limit, and the tradeoffs in setting such a limit or changing other parameters, such as changing the minimum acceptable bid percentage, the bid increment percentage, or the number of acceptable bid amounts. Bidders would be notified by announcement in the FCC
auction bidding system during the auction if this discretion is exercised.
37. OEA and MB seek comment on these proposals. If commenters disagree with the proposal to begin the auction with nine acceptable bid amounts per construction permit, they should suggest an alternative number of acceptable bid amounts to use.
Commenters may wish to address the role of the minimum acceptable bids and the number of acceptable bid amounts in managing the pace of the auction and the tradeoffs in managing auction pace by changing the bidding schedule, activity requirement, bid amounts, or by using other means.
38. Provisionally Winning Bids. The FCC auction bidding system will determine provisionally winning bids consistent with practice in past auctions. At the end of a bidding round, the bidding system will determine a provisionally winning bid for each construction permit based on the highest bid amount received for that permit. The FCC auction bidding system will advise bidders of the status of their
VerDate Sep<11>2014

18:38 Mar 03, 2021

Jkt 253001

bids when round results are released. A
provisionally winning bid will remain the provisionally winning bid until there is a higher bid on the same construction permit at the close of a subsequent round, unless the provisionally winning bid is withdrawn if bid withdrawals are permitted in this auction. Provisionally winning bids at the end of the auction become the winning bids. As a reminder, provisionally winning bids count toward activity for purposes of the activity rule.
39. The FCC auction bidding system assigns a pseudo-random number generated by an algorithm to each bid when the bid is entered. If identical high bid amounts are submitted on a construction permit in any given round i.e., tied bids, the FCC auction bidding system will use a pseudo-random number generator to select a single provisionally winning bid from among the tied bids. The tied bid with the highest pseudo-random number wins the tiebreaker and becomes the provisionally winning bid. The remaining bidders, as well as the provisionally winning bidder, can submit higher bids in subsequent rounds. However, if the auction were to end with no other bids being placed, the winning bidder would be the one that placed the provisionally winning bid. If the construction permit receives any bids in a subsequent round, the provisionally winning bid again will be determined by the highest bid amount received for the construction permit.
40. Bid Removal. The FCC auction bidding system allows each bidder to remove any of the bids it placed in a round before the close of that round. By removing a bid placed within a round, a bidder effectively unsubmits the bid.
In contrast to the bid withdrawal provisions described below, a bidder removing a bid placed in the same round is not subject to a withdrawal payment. Once a round closes, a bidder may no longer remove a bid. Consistent with the design of the bidding system, bidders in Auction 109 would be permitted to remove bids placed in a round before the close of that round.
41. Bid Withdrawal. OEA and MB
propose not to permit bidders in Auction 109 to withdraw bids. When permitted in an auction, bid withdrawals provide a bidder with the option of withdrawing bids placed in prior rounds that have become provisionally winning bids. A bidder would be able to withdraw its provisionally winning bids using the withdraw function in the FCC auction bidding system. A bidder that withdraws its provisionally winning
PO 00000

Frm 00011

Fmt 4702

Sfmt 4702

bids, if permitted, is subject to the bid withdrawal payment provisions of 47
CFR 1.2104g, 1.2109.
42. The Commission has recognized that bid withdrawals may be a helpful tool for bidders seeking to efficiently aggregate licenses or implement backup strategies in certain auctions. The Commission has also acknowledged that allowing bid withdrawals may encourage insincere bidding or increased opportunities for undesirable strategic bidding in certain circumstances. The Commission stated that this discretion should be exercised assertively, with consideration of limiting the number of rounds in which bidders may withdraw bids and preventing bidders from bidding on a particular market if a bidder is abusing the Commissions bid withdrawal procedures. In managing the auction, therefore, OEA and MB have discretion to limit the number of withdrawals to prevent bidding abuses.
43. Based on this guidance and on experience with past auctions of broadcast construction permits, the public notice proposes to prohibit bidders from withdrawing any bid after the close of the round in which that bid was placed. In light of the site-specific nature and wide geographic dispersion of the permits available in this auction, which suggests that potential applicants for this auction may have fewer incentives to aggregate permits through the auction process as compared with bidders in many auctions of wireless licenses, it is unlikely that bidders will have a need to withdraw bids in this auction. Further, bid withdrawals, particularly if they were made late in this auction, could result in delays in licensing new broadcast stations and attendant delays in the offering of new broadcast service to the public. OEA
and MB seek comment on this proposal to prohibit bid withdrawals in Auction 109. Commenters advocating alternative approaches should support their arguments by taking into account the construction permits offered, the impact of auction dynamics and the pricing mechanism, and the effects on the bidding strategies of other bidders.
44. Post Auction Payment: Interim Withdrawal Payment Percentage. In the event bid withdrawals are permitted in Auction 109, OEA and MB propose that the interim bid withdrawal payment be 20% of the withdrawn bid. As required by 47 CFR 1.2104g1, a bidder that withdraws a provisionally winning bid during an auction is subject to a withdrawal payment equal to the difference between the amount of the withdrawn bid and the amount of the winning bid in the same or a subsequent
E:FRFM04MRP1.SGM

04MRP1

Acerca de esta edición

Federal Register - March 4, 2021

TítuloFederal Register

PaísEstados Unidos de América

Fecha04/03/2021

Nro. de páginas292

Nro. de ediciones7799

Primera edición14/03/1936

Ultima edición22/06/2026

Descargar esta edición

Otras ediciones

<<<Marzo 2021>>>
DLMMJVS
123456
78910111213
14151617181920
21222324252627
28293031