Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.
Fuente: Federal Register
11016
Federal Register / Vol. 86, No. 34 / Tuesday, February 23, 2021 / Notices LICENSE AMENDMENT ISSUANCESContinued
Entergy Louisiana, LLC, and Entergy Operations, Inc.; River Bend Station, Unit 1; West Feliciana Parish, LA; Entergy Operations, Inc., System Energy Resources, Inc., Cooperative Energy, A Mississippi Electric Cooperative, and Entergy Mississippi, LLC; Grand Gulf Nuclear Station, Unit 1; Claiborne County, MS
Docket Nos
Amendment Date
ADAMS Accession No
Amendment Nos
Brief Description of Amendments
Public Comments Received as to Proposed NSHC Yes/No.
50416, 50458.
February 2, 2021.
ML21011A068.
Grand Gulf226 and River Bend205.
The amendments adopted Technical Specifications Task Force TSTF Traveler TSTF439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO Limiting Condition for Operation, Revision 2, dated June 20, 2005 ADAMS Accession No. ML051860296, into the technical specifications for Grand Gulf Nuclear Station, Unit 1 and River Bend Station, Unit 1.
No.
Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Calvert County, MD
Docket Nos
Amendment Date
ADAMS Accession No
Amendment Nos
Brief Description of Amendments
Public Comments Received as to Proposed NSHC Yes/No.
50317, 50318.
January 26, 2021.
ML20363A242.
339 Unit 1 and 317 Unit 2.
The amendments permit the use of accident tolerant fuel lead test assemblies and made an administrative change to the technical specifications. Up to two lead test assemblies of the Framatome PROtectTM fuel design are allowed to be loaded into the Calvert Cliffs Nuclear Power Plant, Unit 1 and Unit 2, reactors for up to three cycles.
No.
Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 2 and 3; Grundy County, IL; Exelon Generation Company, LLC; LaSalle County Station, Units 1 and 2; LaSalle County, IL; Exelon Generation Company, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA; Exelon Generation Company, LLC; Peach Bottom Atomic Power Station, Units 2 and 3;
York County, PA; Exelon Generation Company, LLC; Quad Cities Nuclear Power Station, Units 1 and 2; Rock Island County, IL;
Nine Mile Point Nuclear Station, LLC and Exelon Generation Company, LLC; Nine Mile Point Nuclear Station, Unit 2; Oswego County, NY
Docket Nos
Amendment Date
ADAMS Accession No
Amendment Nos
Brief Description of Amendments
Public Comments Received as to Proposed NSHC Yes/No.
50237, 50249, 50373, 50374, 50352, 50353, 50410, 50277, 50278, 50254, 50
265.
February 4, 2021.
ML21013A005.
Dresden273 Unit 2 and 266 Unit 3; LaSalle247 Unit 1 and 233 Unit 2; Limerick 251 Unit 1 and 213 Unit 2; Peach Bottom336 Unit 2 and 339 Unit 3; Quad Cities 285 Unit 1 and 281 Unit 2; Nine Mile Point184 Unit 2.
The amendments revised certain technical specification requirements for the following physical parameters: 1 The drywell-to-suppression chamber differential pressure at Dresden and Quad Cities; 2 the primary containment oxygen concentration at Dresden, LaSalle, Nine Mile Point, Peach Bottom, and Quad Cities; and 3 the drywell and suppression chamber oxygen concentration at Limerick. The changes are based, in part, on Technical Specifications Task Force TSTF Traveler TSTF568, Revision 2, Revise Applicability of BWR Boiling-Water Reactor/4 TS 3.6.2.5 and TS 3.6.3.2 ADAMS Accession No. ML19141A122.
No.
Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Unit 1; Berrien County, MI
Docket Nos
Amendment Date
ADAMS Accession No
Amendment Nos
Brief Description of Amendments
Public Comments Received as to Proposed NSHC Yes/No.
50315.
January 12, 2021.
ML20329A001.
356.
The amendment revised the reactor coolant system heatup and cooldown curves and the low temperature overpressure protection LTOP requirements in Technical Specification TS
3.4.3 and TS 3.4.12, respectively. The changes to the LTOP requirements in TS 3.4.12 also required conforming changes to be made to TSs 3.4.6, 3.4.7, and 3.4.10.
No.
Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Units 1 and 2; Berrien County, MI
Docket Nos
Amendment Date
ADAMS Accession No
Amendment Nos
Brief Description of Amendments
VerDate Sep<11>2014
18:36 Feb 22, 2021
Jkt 253001
50315, 50316.
January 15, 2021.
ML20366A155.
357 Unit 1 and 336 Unit 2.
The amendments revised Technical Specification 5.5.12, Technical Specifications TS Bases Control Program, to align it with the Updated Final Safety Analysis Report update frequency and schedule.