Federal Register - February 17, 2021

Versión en texto ¿Qué es?Dateas es un sitio independiente no afiliado a entidades gubernamentales. La fuente de los documentos PDF aquí publicados es la entidad gubernamental indicada en cada uno de ellos. Las versiones en texto son transcripciones no oficiales que realizamos para facilitar el acceso y la búsqueda de información, pero pueden contener errores o no estar completas.

Fuente: Federal Register

Federal Register / Vol. 86, No. 30 / Wednesday, February 17, 2021 / Notices address below.6 Your motion to intervene must reference the Project docket number CP2144000.
Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
The Commission encourages electronic filing of motions to intervene option 1 above and has eFiling staff available to assist you at 202 5028258
or FercOnlineSupport@ferc.gov.
Motions to intervene must be served on the applicant either by mail or email at: 488 8th Avenue, San Diego, California 92101 or at jharrison@
sempraglobal.com. Any subsequent submissions by an intervenor must be served on the applicant and all other parties to the proceeding. Contact information for parties can be downloaded from the service list at the eService link on FERC Online. Service can be via email with a link to the document.
All timely, unopposed 7 motions to intervene are automatically granted by operation of Rule 214c1.8 Motions to intervene that are filed after the intervention deadline are untimely, and may be denied. Any late-filed motion to intervene must show good cause for being late and must explain why the time limitation should be waived and provide justification by reference to factors set forth in Rule 214d of the Commissions Rules and Regulations.9
A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies paper or electronic of all documents filed by the applicant and by all other parties.

jbell on DSKJLSW7X2PROD with NOTICES

Tracking the Proceeding Throughout the proceeding, additional information about the project will be available from the Commissions Office of External Affairs, at 866 208
FERC, or on the FERC website at www.ferc.gov using the eLibrary link as described above. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of 6 Hand delivered submissions in docketed proceedings should be delivered to Health and Human Services, 12225 Wilkins Avenue, Rockville, Maryland 20852.
7 The applicant has 15 days from the submittal of a motion to intervene to file a written objection to the intervention.
8 18 CFR 385.214c1.
9 18 CFR 385.214b3 and d.

VerDate Sep<11>2014

20:43 Feb 16, 2021

Jkt 253001

time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. For more information and to register, go to www.ferc.gov/docsfiling/
esubscription.asp.
Intervention Deadline: 5:00 p.m.
Eastern Time on March 3, 2021.
Dated: February 10, 2021.
Kimberly D. Bose, Secretary.
FR Doc. 202103157 Filed 21621; 8:45 am BILLING CODE 671701P

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission Project No. 4428011

Walden Hydro, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments, Recommendations, Terms and Conditions, and Prescriptions Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: P4428011.
c. Date filed: May 29, 2020.
d. Applicant: Walden Hydro, LLC.
e. Name of Project: Walden Hydroelectric Project.
f. Location: On the Wallkill River, in the Village of Walden, Orange County, New York. The project does not occupy any federal land.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791a825r.
h. Applicant Contact: Tim Carlsen, CEO, Hydroland, Inc.,1 403 Madison Ave. 240, Bainbridge Island, WA
98110; Phone at 844 4937612 or email at tim@hydrolandcorp.com.
i. FERC Contact: Samantha Pollak at 202 5026419, or samantha.pollak@
ferc.gov.
j. Deadline for filing comments, recommendations, terms and conditions, and prescriptions: 60 days from the issuance date of this notice;
reply comments are due 105 days from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file scoping comments using the Commissions eFiling system at https
ferconline.ferc.gov/FERCOnline.aspx.
1 In a February 3, 2021 filing, the Commission was notified that Enel Green Power North America, Inc. transferred all its ownership interests for Walden Hydro, LLC to Hydroland, Inc.

PO 00000

Frm 00019

Fmt 4703

Sfmt 4703

9923

Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https ferconline.ferc.gov/
QuickComment.aspx. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@
ferc.gov, 866 2083676 toll free, or 202 5028659 TTY. In lieu of electronic filing, you may submit a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888
First Street NE, Washington, DC 20426.
Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852. The first page of any filing should include docket number P4428011.
The Commissions Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project.
Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. This application has been accepted and is now ready for environmental analysis.
The Council on Environmental Quality CEQ issued a final rule on July 15, 2020, revising the regulations under 40 CFR parts 15001518 that federal agencies use to implement NEPA see Update to the Regulations Implementing the Procedural Provisions of the National Environmental Policy Act, 85
FR 43,304. The Final Rule became effective on and applies to any NEPA
process begun after September 14, 2020.
An agency may also apply the regulations to ongoing activities and environmental documents begun before September 14, 2020, which includes the proposed Walden Project. Commission staff intends to conduct its NEPA review in accordance with CEQs new regulations.
l. The Walden Project consists of: 1
A 417-foot-long consisting of 165-footlong east-west and 252-foot-long northsouth portions, V-shaped concrete dam topped with 2-foot-high flashboards; 2
an impoundment with a surface area of 69 acres at the normal pool elevation of 321.3 feet National Geodetic Vertical Datum of 1929 NGVD29; 3 an intake structure consisting of a 252-foot-long, 56-foot-wide, 18-foot-deep canal
E:FRFM17FEN1.SGM

17FEN1

Acerca de esta edición

Federal Register - February 17, 2021

TítuloFederal Register

PaísEstados Unidos de América

Fecha17/02/2021

Nro. de páginas179

Nro. de ediciones7802

Primera edición14/03/1936

Ultima edición25/06/2026

Descargar esta edición

Otras ediciones

<<<Febrero 2021>>>
DLMMJVS
123456
78910111213
14151617181920
21222324252627
28